N66604_15_R_1701.pdf
PDF 1 MB Posted
- Attached to
- Breech Extension Guide Federal contract opportunity
- Solicitation number
- N66604-15-R-1701
About this file
Solicitation N66604-15-R-1701 with Exhibits and Attachment.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N66604_15_R_1701_0006.pdf | ||
| N66604_15_R_1701_0005.pdf | ||
| N66604_15_R_1701_0004.pdf | ||
| N66604_15_R_1701_0003.pdf | ||
| N66604_15_R_1701_0002.pdf | ||
| N66604_15_R_1701_0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 28 Jun 2016
X
A
X B
X C X D
EX
X
G
F 45 - 59
60 - 69
X H 70
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
1 75
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N66604 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 2
3 - 4
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
5 - 13
14 - 15
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
16 - 17
18 - 19 X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 20 - 25 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 26 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
27 - 43
PART II - CO NTRACT CLAUSES
NAVAL UNDERSEA WARFARE CENTER
JUSTEN CANTAN, CODE 0221
1176 HOWELL STREET, BLDG 1258
NEWPORT RI 02841-1708 401-832-8976
(401) 832-4820FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.
1300477840
5. DATE ISSUED
26 May 2016
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N66604-15-R-1701
Section SF 30 - BLOCK 14 CONTINUATION PAGE
CLAUSES INCORPORATED BY FULL TEXT
GENERAL INFORMATION
Distribution: FILE, KR, NUWC 02/115, DCM: , DFAS: , COR: , PI: , CLO:
FSC: 3444
NUWCDIVNPT Control Number: 151701
NUWCDIVNPT Requisition Number(s): 1300477840
NUWCDIVNPT POC: Negotiator Name Justen K.J. Cantan (Phone: (401) 832-8976; Fax: (401) 832-4820; Email:
justen.cantan@navy.mil) mailto:justen.cantan@navy.mil
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Breech Extension Guideway
FFP
Breech Extension Guideway (BEG) manufactured in accordance with the
Statement of Work (see Clause C11) and the Drawing Package Addendum (see
Exhibit B).
See DFARS 252.211-7003.
FOB: Destination
PURCHASE REQUEST NUMBER: 1300477840
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 9 Each Data
In accordance with the Contract Data Requirements Lists (CDRLs), DD Form
1423.
NET AMT
HQ B-2-0022 CONTRACT SUMMARY FOR PAYMENT OFFICE (FIXED
PRICE) (FEB 1997)
This entire contract is fixed price.
Section C - Descriptions and Specifications
HQ C-1-0001 ITEM(S) - DATA REQUIREMENTS (NAVSEA) (SEP 1992)
The data to be furnished hereunder shall be prepared in accordance with the Contract Data
Requirements List, DD Form 1423, Exhibit(s) “A” , attached hereto.
HQ C-2-0008 ASSIGNMENT AND USE OF NATIONAL STOCK NUMBERS
(NAVSEA) (MAY 1993)
To the extent that National Stock Numbers (NSNs) or preliminary NSNs are assigned by the Government for the identification of parts, pieces, items, subassemblies or assemblies to be furnished under this contract, the Contractor shall use such NSNs or preliminary
NSNs in the preparation of provisioning lists, package labels, packing lists, shipping containers and shipping documents as required by applicable specifications, standards or
Data item Descriptions of the contract or as required by orders for spare and repair parts.
The cognizant Government Contract Administration Office shall be responsible for providing the Contractor such NSNs or preliminary NSNs which may be assigned and which are not already in possession of the Contractor.
HQ C-2-0012 CONFIGURATION MANAGEMENT (NAVSEA) (APR 2015)
(a) Baseline Definition - For configuration control purposes, all contractual documentation in effect at the time of contract award shall constitute the Contract Baseline which shall be considered incorporated in the baseline documentation.
(b) General Requirement - (1) The Contractor shall maintain a Configuration Control Program to assure that all detail level work being performed under this contract is in compliance with appropriate baseline documentation.
The Contractor shall prepare a Configuration Management Plan in accordance with the requirements of the contract for approval by the Government.
(2) Whenever a situation arises wherein the Contractor cannot comply with a baseline document, or whenever intent of such documentation is significantly changed by detail level documentation, the Contractor shall submit change documents to modify baseline documents to resolve the conflict or to allow non-compliance.
Whenever the cost of implementing a proposed change is less than the threshold requiring certified cost or pricing data, the Contractor shall provide documentation explaining the nature of related costs as shown on the change document. Whenever the contract cost changes by an amount greater than the threshold requiring certified cost or pricing data, the Contractor shall complete such cost and pricing data as the Contracting Officer shall require detailing all related costs, and attach it to the change document. Requirements for cost and pricing data shall be determined by the gross amount of the change unless otherwise directed by the contracting officer. Change documentation shall be submitted to the Contracting Officer in accordance with the Contract Data Requirements List
(CDRL), and as described in paragraphs (c) through (f) below.
(c) Engineering Change Proposals (ECPs) - ECPs shall be prepared in accordance with the approved configuration management plan and the requirements of the contract. DI-SESS-80639D approved 7 April 2015 and MIL-HDBK-
61A of 7 Feb 2001 apply. An ECP should be submitted whenever the detail level physical configuration, material quality, operational or functional performance of equipment or installed systems will not be in compliance with baseline design-related documents (Specifications, Contract Drawings, etc.), and a change to the baseline document is considered an appropriate means of resolving a design-related issue. Documentation shall be developed in sufficient detail to enable Government review and evaluation of the merits of the proposed change, including cost and scheduling impact, ship class impact, and consequences if disapproved. All existing drawings and technical manuals impacted by the change shall be listed along with a brief narrative explanation of needed changes to incorporate the ECP if approved. Weight and moment data incidental to the change shall be provided. The
Contractor shall also prepare applicable baseline document insert sheets, with specific word changes or proposed re-write, to facilitate baseline documentation changes.
(d) Non-Engineering Change Proposals (NECPs) – An NECP should be submitted whenever necessary to document administrative, procedural, scheduling, or documentation changes that do not directly impact the physical configuration of the equipment. The NECP shall explain the nature of the problem, identify the applicable baseline document (i.e., Contract Data Requirement List (CDRL), Contract Clause, etc.) and provide a detailed explanation justifying the proposed course of action desired to resolve the problem. Insert sheets for applicable documents shall also be attached to facilitate change action in the event the NECP is approved.
(e) Deviations and Waivers - In the event that a baseline design-related document requirement cannot be met, and a change to the baseline document is considered inappropriate, the Contractor shall submit a Request for Variance.
DI-SESS-80640D approved 7 April 2015 and MIL-HDBK-61A of 7 Feb 2001 apply. The explanation of "need for deviation" should provide detailed justification and consequences of approval, to include technical details explaining the degree of non-compliance or effect on ship equipment or system operation constraints. In a similar manner, a waiver shall document an "as built" configuration that departs from baseline documentation and should include any proposed corrections or modifications to better meet the intent of the baseline document.
(f) Equitable Adjustments for Change Documentation Preparations - For its effort expended in preparing ECPs, NECPs, Deviations and Waivers, the Contractor shall receive equitable adjustment under the following circumstances:
(1) In the event the Contractor, on its own initiative, and without written request from the Contracting
Officer, develops a change document that is later disapproved by the Government, the Contractor shall bear the cost of this effort.
(2) To avoid such loss, and at its option, the Contractor may submit a "preliminary" document that outlines intent, but without detailed supporting documentation and request the Contracting Officer's approval for expenditure of effort to complete the detailed supporting documentation. In the event the Contracting Officer denies this request, the Contractor will bear the cost of development of the "preliminary" document, and shall make no further effort to complete detailed supporting documentation.
(3) In the event the Contracting Officer approves the Contractor's request to develop supporting documentation, the Contractor shall be equitably compensated for its effort for both the "preliminary" and "final" documentation, regardless of whether or not the change document is later approved.
(4) In the event the Contracting Officer requests in writing that the Contractor develop change documentation, the effort expended by the Contractor in developing such documentation shall be subject to equitable adjustment, regardless of whether or not the change document is later approved.
(5) In the event the Contractor, on its own initiative, and without written request from the Government, develops a change document that is later approved by the Contracting Officer, the cost of developing such documentation shall be incorporated in the contract modification that implements the change.
(6) Failure to agree to such equitable adjustment in contract price shall constitute a dispute, and shall be adjudicated in accordance with the requirements of the clause entitled "DISPUTES" (FAR 52.233-1).
(g) Any cost reduction proposal submitted pursuant to the clause entitled "VALUE ENGINEERING" (FAR
52.248-1) shall be submitted as a Code V Engineering Change Proposal (VECP). DI-SESS-80639D approved 7
April 2015 and MIL-HDBK-61A of 7 Feb 2001 apply. Information required by the "VALUE ENGINEERING" clause shall also be submitted as part of the change request.
HQ C-2-0023 EXCLUSION OF MERCURY (NAVSEA) (MAY 1998)
Mercury or mercury containing compounds shall not be intentionally added or come in direct contact with hardware or supplies furnished under this contract.
HQ C-2-0032 INFORMATION AND DATA FURNISHED BY THE
GOVERNMENT - ALTERNATE II (NAVSEA) (SEP 2009)
(a) NAVSEA Form 4340/2 or Schedule C, as applicable, Government Furnished
Information, attached hereto, incorporates by listing or specific reference, all the data or information which the Government has provided or will provide to the Contractor except for
(1) The specifications set forth in Section C, and
(2) Government specifications, including drawings and other Government technical documentation which are referenced directly or indirectly in the specifications set forth in
Section C and which are applicable to this contract as specifications, and which are generally available and provided to Contractors or prospective Contractors upon proper request, such as Federal or Military Specifications, and Standard Drawings, etc.
(b) Except for the specifications referred to in subparagraphs (a)(1) and (2) above, the
Government will not be obligated to provide to the Contractor any specification, drawing, technical documentation or other publication which is not listed or specifically referenced in
NAVSEA Form 4340/2 or Schedule C, as applicable, notwithstanding anything to the contrary in the specifications, the publications listed or specifically referenced in NAVSEA
Form 4340/2 or Schedule C, as applicable, the clause entitled "GOVERNMENT
PROPERTY" (FAR 52.245-1) or "GOVERNMENT PROPERTY INSTALLATION
OPERATION SERVICES " (FAR 52.245-2), as applicable, or any other term or condition of this contract.
(c)(1) The Contracting Officer may at any time by written order:
(i) delete, supersede, or revise, in whole or in part, data listed or specifically referenced in NAVSEA Form 4340/2 or Schedule C, as applicable; or
(ii) add items of data or information to NAVSEA Form 4340/2 or Schedule C, as applicable; or
(iii) establish or revise due dates for items of data or information in NAVSEA
Form 4340/2 or Schedule C, as applicable.
(2) If any action taken by the Contracting Officer pursuant to subparagraph (c)(1) immediately above causes an increase or decrease in the costs of, or the time required for, performance of any part of the work under this contract, the contractor may be entitled to an equitable adjustment in the contract amount and delivery schedule in accordance with the procedures provided for in the "CHANGES" clause of this contract.
HQ C-2-0033 LIMITATION OF LIABILITY - HIGH VALUE ITEMS (NAVSEA)
(JUN 1992)
The following items are subject to the clause of this contract entitled "LIMITATION OF
LIABILITY--HIGH VALUE ITEMS" (FAR 52.246-24): CLIN 0001
HQ C-2-0051 SPECIFICATIONS AND STANDARDS (NAVSEA) (AUG 1994)
(a) Definitions.
(i) A "zero-tier reference" is a specification, standard, or drawing that is cited in the contract (including its attachments).
(ii) A "first-tier reference" is either: (1) a specification, standard, or drawing cited in a zero-tier reference, or (2) a specification cited in a first-tier drawing.
(b) Requirements.
All zero-tier and first-tier references, as defined above, are mandatory for use. All lower tier references shall be used for guidance only.
HQ C-2-0059 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA)
(AUG 1994)
If, during the performance of this or any other contract, the contractor believes that any contract contains outdated or different versions of any specifications or standards, the contractor may request that all of its contracts be updated to include the current version of the applicable specification or standard. Updating shall not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval by the Procuring
Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.
C11 STATEMENT OF WORK (JAN 2012)
Work to be performed in accordance with the Statement of Work below:
Statement of Work
1.0 BACKGROUND
The VIRGINIA-Class (VA Class) Submarine (SSN 774) External Countermeasure Launcher
(ECL) requires a Breech Extension Guide (BEG) for loading the ECL modules aboard a VA-
Class submarine. The BEG was designed by Electric Boat Corporation (EBC); the four existing
BEGs were constructed by a subcontractor to EBC. Two of the four BEGs are currently being used by the shipbuilders to satisfy construction testing requirements.
The Program Executive Office for Submarines (PEO-SUB) has tasked the Naval Undersea
Warfare Center Division, Newport (NUWCDIVNPT), Platform & Payload Integration
Department (Code 40) to procure an additional BEG for a VA Class submarine.
2.0 SCOPE
The contractor shall manufacture and deliver one (1) BEG, for use during loading and handling operations of ECLs aboard VA Class submarines. PMS 450, the NAVSEA Sponsor for the VA
Class Program, has provided Shipbuilding and Conversion, Navy (SCN) funds to Code 40 for this acquisition.
3.0 APPLICABLE DOCUMENTS
3.1 Drawings and Technical Documentation
3.1.1 NAVSEA Drawing 7383856 Rev. A (Drawing H692-1632 Rev. A), NSSN Class
Submarine External Countermeasure Launcher Breech Extension Guide Assembly and
Details
3.1.2 Engineering Report ERH692-1632A1
3.1.3 Engineering Report ERH692-1632A2
3.1.4 Engineering Report ERH692-1632A3
3.1.5 Engineering Report ERH692-1632A4
3.1.6 Engineering Report ERH692-1632A6
3.1.7 Engineering Report ERH692-1632A9
3.1.8 Engineering Report ERH692-1632A10
3.1.9 NAVSEA Drawing 8307643, VIRGINIA Class External Countermeasure Launcher
BEG Stand
3.1.10 NAVSEA Drawing 53711-8307642, VIRGINIA Class External Countermeasure BEG
Diver Platform Assembly
3.1.11 NUWC Newport Standard Operating Procedure: Assembly of the VIRGINIA-Class
External Countermeasure Launcher (ECL) Breech Extension Guide (BEG) Diver
Platform.
3.2 Specifications and Standards
3.2.1 ASME Y 14.34, Drawing Types and Applications of Engineering Drawings (dated 01 Jan
13)
3.2.2 ASME Y 14.5 Dimensioning and Tolerancing (dated 27 Mar 09)
3.2.3 ASME Y 14.5.1M-1994, Dimensioning and Tolerancing Principles (Reaffirmed 2012)
3.2.4 ASME Y14.100, Engineering Drawing Practices, with appendices B, C, D and E (dated
30 Jul13)
3.2.5 ASME B46.1, Surface Texture, Surface Roughness, Waviness and Lay (dated 01 Jan 09)
3.2.6 MIL-DTL-15024F, Plates, Tags, and Bands for Identification of Equipment, General
Specification for (Dated 28 Nov 97)
3.2.7 MIL-STD-130N, Identification Marking of US Military Property (dated 16 Nov 12)
3.2.8 T9074-AQ-GIB-010/271, Requirements for Non-Destructive Testing Methods
3.2.9 MIL-STD-2035A, Non-Destructive Testing Acceptance Criteria (dated 15 May 95)
3.2.10 ISO-9001:2008, Quality Management Systems – Requirements (dated 15 Nov 08)
3.2.11 NAVSEA Instruction 5100.3D – Mercury, Mercury Compounds, And Components
Containing Mercury or Mercury Compounds; Control of (dated 26 Jan 98)
4.0 REQUIREMENTS
4.1 Manufacture, Assemble, and Load-Test of Breech Extension Guide
The contractor shall manufacture, assemble, load-test and inspect one (1) BEG, in accordance
(IAW) with Applicable Documents 3.1.1 thru 3.1.8 of Section 3.0 except for Part numbers A6 and A7, wire rope sling bridle assemblies for handling the BEG, identified in Applicable
Document 3.1.3, sht_0005 and sht_0006, respectively.
4.1.1 Data Deliverables: The Contractor shall provide monthly status reports describing manufacturing progress or issues IAW CDRL A001; Failure Analysis and Corrective Action
Reports IAW CDRL A002. The Contractor shall also submit any Requests for Variance
(formerly RFD/RFW) IAW CDRL A003; Engineering Change Proposals (ECPs) IAW A004;
Specification Change Notices (SCNs) IAW CDRL A005; Notices of Revision (NORs) IAW
CDRL A006.
4.1.2 Hardware Deliverables: The Contractor shall deliver one BEG, IAW DD Form 250.
4.1.3 The contractor shall mark and conduct load-testing on the BEG, in accordance with
Applicable Documents 3.1.1 thru 3.1.8. Upon completion of the required testing, the contractor shall perform hardware inspection of the final assembly BEG production unit and provide a Test and Inspection report (CDRL A007).
The Government shall be notified at least fifteen (15) calendar days prior to the performance of the test and inspection. The Government reserves the right to inspect the test facility at the contractor’s plant(s) and at the contractor’s subcontractor’s plant(s), as well as to witness all tests specified herein. The contractor shall identify all failures, deficiencies, and discrepancies revealed during the performance of the specified tests in the Failure Analysis and Corrective
Action Report (CDRL A002). The contractor shall demonstrate acceptability of the BEG assembly, as follows:
4.2 Test/Inspection Requirements at Origin:
a. The Contractor shall verify that the BEG meets or exceeds all the requirements of the manufacturing drawing packages as provided in Applicable Documents 3.1.1 thru 3.1.8.
Contractor-generated inspection reports shall identify and record all material validation/certification data, inspection/ measurement data with specific measurements recorded, outside process certifications (coatings, heat treatment, etc.) and load testing certifications where necessary. The contractor shall assemble this objective quality evidence (OQE) and present it at the time of test/inspection;
b. The BEG production unit will not be destroyed in testing, and shall be considered the sole contract quantity.
4.2.1 Deliverables: The contractor shall submit a Failure Analysis and Corrective Action
Report IAW CDRL A002.
4.2.2 Deliverables: The Contractor shall provide a Test/Inspection Report IAW CDRL A007;
Quality Assurance Provisions IAW CDRL A008; and, a Certificate of Compliance IAW CDRL
A009, upon delivery of the hardware to the final destination for inspection and acceptance.
4.3 Test and Inspection requirements at Destination:
4.3.1 The contractor shall perform a dimensional inspection for the BEG in accordance with
Applicable Documents 3.1.1 thru 3.1.8. Additionally, the contractor shall perform Fitment
Testing on the BEG at its test facility prior to shipment. Fitment Testing shall consist of the following:
a) The Government will provide one (1) BEG Shipping Stand (per Applicable Document 3.1.9) and one (1) BEG Diver Platform (per Applicable Document 3.1.10) to the contractor to support Fitment Testing at the contractor's facility.
b) In accordance with Applicable Document 3.1.11, the Contractor shall place the BEG into the
Government-furnished BEG Shipping Stand. If the BEG mounts do not align and interface securely within the BEG Shipping Stand, the contractor shall notify the Government TPOC and propose recommended changes to achieve proper alignment and interface between the hardware and the BEG Shipping Stand. The BEG shall be hoisted, aligned, lowered onto and locked to the BEG transportation stand using the three (3) BEG lock/unlock mechanisms The
Contractor shall not make any modifications to the Government-Furnished BEG
Shipping Stand. Testing shall proceed only when secure and proper interface between the
BEG mounts and the BEG Shipping Stand is achieved.
c) In accordance with Applicable Document 3.1.10 and while the BEG is securely installed on the BEG Shipping Stand, the Contractor shall install the BEG Diver Platform onto the BEG and shall make adjustments to achieve proper alignment and interface of the BEG to the
Diver Platform. The GFE BEG Diver Platform shall be installed, aligned, fastened and adjusted to the BEG for normal usage. The Contractor shall not make any modifications to the Government-furnished Diver Platform.
d) The contractor shall deliver the BEG, with Shipping Stand and Diver Platform, to final destination for installation by the Government onto a VA Class submarine. (The Shipping
Stand and Diver Platform shall be delivered to the Government in their original, un-altered configurations.) If the BEG does not align and interface securely with the submarine hull fittings, the Contractor shall make adjustments to achieve proper alignment and provide a secure interface with the submarine hull fittings. The Contractor shall not make any modifications to the submarine interfaces.
e) The Contractor shall provide Fitment Test Reports that include test arrangement and procedures, test events, instrumentation description and calibration, measured data, results and observations. The reports shall include a statement regarding conformance to the fitment test requirements, which are: 1) to certify the manufactured BEG properly fits the GFE BEG dive platform; and 2) to certify the manufactured BEG fits the GFE BEG transportation stand. In accordance with Applicable Documents 3.1.1 (Sheet_0006 _Suf _01 through 03) and 3.2.9, the Contractor shall identify in the reports each component, assembly or unit tested to ensure traceability.
i. Deliverables: The contractor shall submit Test Reports in accordance with CDRL A007.
f) Mercury Contamination: Per Applicable Document 3.2.11, the supplies furnished by this contract shall not contain mercury in any form and shall be free of mercury contamination.
i. Deliverables: The contractor shall submit a Mercury-Free Certificate certifying compliance with Clause HQ C-2-0023.
C26 INFORMATION ASSURANCE – UNCLASSIFIED DOD INFORMATION ON NON-DOD
INFORMATION SYSTEMS (JUL 2012)
(a) The Contractor shall ensure that unclassified DoD information it receives or produces in support of DoD activities is protected according to the information safeguards described in Attachment 2 to Directive-Type Memorandum (DTM) 08.027 – Security of Unclassified DoD Information on Non-DoD Information Systems, which is available at the following web address:
http://www.dtic.mil/whs/directives/corres/pdf/858201p.pdf
(b) Upon request by the Government, the Contractor shall provide documentation demonstrating the safeguards the contractor has implemented to ensure the security of unclassified DoD Information.
(c) Contractor personnel that have not been briefed on Attachment 2 to Directive-Type memorandum (DTM) 08-027
– Security of Unclassified DoD Information on Non-DoD Information Systems shall be denied access to contractor systems that contain unclassified DoD information.
(d) Subcontracts. If the Contractor issues any subcontracts in which the subcontractor will have access to unclassified DoD information, the Contractor shall include this clause.
http://www.dtic.mil/whs/directives/corres/pdf/858201p.pdf
Section D - Packaging and Marking
HQ D-1-0001 DATA PACKAGING LANGUAGE
Data to be delivered by Integrated Digital Environment (IDE) or other electronic media shall be as specified in the contract.
All unclassified data to be shipped shall be prepared for shipment in accordance with best commercial practice.
Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial
Security Program Operating Manual (NISPOM), DOD 5220.22-M dated 28 February 2006 with Change 1 dated 28
March 2013.
HQ D-2-0006 MARKING AND PACKING LIST(S) (NAVSEA) (NOV 1996)
(a) Marking. Shipments, shipping containers and palletized unit loads shall be marked in accordance with best commercial practice.
(b) Packing List(s). A packing list (DD Form 250 Material Inspection and Receiving Report may be used) identifying the contents of each shipment, shipping container or palletized unit load shall be provided by the Contractor with each shipment. When a contract line item identified under a single stock number includes an assortment of related items such as kit or set components, detached parts or accessories, installation hardware or material, the packing list(s) shall identify the assorted items.
Where assortment of related items is included in the shipping container, a packing list identifying the contents shall be furnished.
(c) Master Packing List. In addition to the requirements in paragraph (b) above, a master packing list shall be prepared where more than one shipment, shipping container or palletized unit load comprise the contract line item being shipped. The master packing list shall be attached to the number one container and so identified.
(d) Part Identification. All items within the kit, set, installation hardware or material shall be suitably segregated and identified within the unit pack(s) or shipping container by part number and/or national stock number.
HQ D-2-0008 MARKING OF REPORTS (NAVSEA) (SEP 1990)
All reports delivered by the Contractor to the Government under this contract shall prominently show on the cover of the report:
(1) name and business address of the Contractor
(2) contract number
(3) contract dollar amount
(4) whether the contract was competitively or non-competitively awarded
(5) sponsor: TBD
(Name of Individual Sponsor)
(Name of Requiring Activity)
(City and State)
D3 DELIVER TO ADDRESS (AUG 2006)
All deliveries will be made to the following address and annotated with the “Mark For” information:
Receiving Officer, Naval Station Newport
47 Chandler Street
Newport, RI 02841-1716
Mark For: NUWC Division, Newport –
P.O.#: N66604- TBD
D24 PROHIBITED PACKING MATERIALS (JAN 2012)
The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hygroscopic or non-neutral material) is prohibited. In addition, loose fill polystyrene is prohibited for shipboard use.
D26 UNPACKING INSTRUCTIONS
(a) Location on Container. When practical, one set of the unpacking instructions will be placed in a heavy water-proof envelope prominently marked "UNPACKING INFORMATION" and firmly affixed to the outside of the shipping container in a protected location, preferably between the cleats on the end of the container adjacent to the identification marking. If the instructions cover a set of equipment packed in multiple containers, the instructions will be affixed to the number one container of the set. When the unpacking instructions are too voluminous to be affixed to the exterior of the container, they will be placed inside and directions for locating them will be provided in the envelope marked "UNPACKING INFORMATION".
(b) Marking Containers. When unpacking instructions are provided shipping containers will be stenciled
"CAUTION-THIS EQUIPMENT MAY BE SERIOUSLY DAMAGED UNLESS UNPACKING INSTRUCTIONS
ARE CAREFULLY FOLLOWED. UNPACKING INSTRUCTIONS ARE LOCATED (state where located)." When practical, this marking will be applied adjacent to the identification marking on the side of the container.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-2 Inspection Of Supplies--Fixed Price AUG 1996
52.246-16 Responsibility For Supplies APR 1984
252.246-7000 Material Inspection And Receiving Report MAR 2008
HQ E-1-0001 INSPECTION AND ACCEPTANCE LANGUAGE FOR DATA
Inspection and acceptance of all data shall be as specified on the attached Contract Data
Requirements List(s), DD Form 1423.
HQ E-1-0003 INSPECTION AND ACCEPTANCE LANGUAGE FOR F.O.B.
DESTINATION DELIVERIES
Item(s) CLIN 0001 - Inspection and acceptance shall be made at destination by a representative of the Government.
HQ E-2-0008 INSPECTION AND TEST RECORDS (NAVSEA) (MAY 1995)
Inspection and Test Records: Inspection and test records shall, as a minimum, indicate the nature of the observations, number of observations made, and the number and type of deficiencies found. Data included in inspection and test records shall be complete and accurate, and shall be used for trend analysis and to assess corrective action and effectiveness.
E15 WITNESS OF INSPECTION OR TESTS (JAN 2012)
Because of the critical nature of the material being furnished hereunder, a representative of the Naval Undersea
Warfare Center Division, Newport is available to furnish technical assistance on quality control matters and shall have the option of conducting Quality Assurance surveillance of inspections and tests performed by the Contractor.
The surveillance will be performed in conjunction with the Defense Contract Management Agency (DCMA) Quality
Assurance representative, if assigned, and does not abrogate the responsibility or authority of such DCMA representative. The Contractor agrees to notify the Negotiator, the PCO and the COR, in writing, when the material will be inspected and/or tested. A minimum of seven working days is required to arrange such a visit.
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
0001 14 mths. ADC 1 NAVSUBSUPPFAC NLON WEAPONS
DEPT
COMMANDING OFFICER
NAVSUBSUPPFAC NLON WEAPO
GROTON CT 06349-5300
N68316
0002 14 mths. ADC 9 NAVAL STATION NEWPORT, RECEIVING
OFFICER
RECEIVING OFFICER
SEE CLAUSE D3
--- RI
401-841-3827
N66604
52.242-15 Stop-Work Order AUG 1989
52.242-17 Government Delay Of Work APR 1984
52.247-34 F.O.B. Destination NOV 1991
52.211-8 TIME OF DELIVERY (JUN 1997)
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
CLIN 0001 - Within 14 months After Date of Contract Award
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The
Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFEROR'S PROPOSED DELIVERY SCHEDULE
Within Days
After Date
Item No. Quantity of Contract
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The
Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
(End of clause)
HQ F-2-0004 F.O.B. DESTINATION (NAVSEA)(APR 2015)
All supplies hereunder shall be delivered with all transportation charges prepaid, in accordance with the clause hereof entitled "F.O.B. DESTINATION" (FAR 52.247-34) in accordance with the delivery instructions specified herein.
The Contractor shall not ship directly to a military air or water port terminal without authorization by the cognizant
Contract Administration Office.
Except when the Material Inspection and Receiving Report (MIRR) (DD 250) is used as an invoice, the Contractor shall enter unit prices on all MIRR copies. Contract line items shall be priced using actual prices, or if not available, estimated prices. When the price is estimated, an "E" shall be entered after the price.
All data to be furnished under this contract shall be delivered prepaid to destination(s) at the time(s) specified on the
Contract Data Requirements List(s), DD Form 1423.
Section G - Contract Administration Data
252.204-0001 LINE ITEM SPECIFIC: SINGLE FUNDING. (SEP 2009)
The payment office shall make payment using the ACRN funding of the line item being billed.
252.204-7006 BILLING INSTRUCTIONS (OCT 2005)
When submitting a request for payment, the Contractor shall--
(a) Identify the contract line item(s) on the payment request that reasonably reflect contract work performance; and
(b) Separately identify a payment amount for each contract line item included in the payment request.
252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS
(JUNE 2012)
(a) Definitions. As used in this clause–
(1) Contract financing payment and invoice payment have the meanings given in section 32.001 of the Federal
Acquisition Regulation.
(2) Electronic form means any automated system that transmits information electronically from the initiating system to all affected systems. Facsimile, e-mail, and scanned documents are not acceptable electronic forms for submission of payment requests. However, scanned documents are acceptable when they are part of a submission of a payment request made using Wide Area WorkFlow (WAWF) or another electronic form authorized by the Contracting
Officer.
(3) Payment request means any request for contract financing payment or invoice payment submitted by the
Contractor under this contract.
(4) Receiving report means the data required by the clause at 252.246-7000, Material Inspection and Receiving
Report.
(b) Except as provided in paragraph (c) of this clause, the Contractor shall submit payment requests and receiving reports using WAWF, in one of the following electronic formats that WAWF accepts: Electronic Data Interchange, Secure File Transfer Protocol, or World Wide Web input. Information regarding WAWF is available on the Internet at https://wawf.eb.mil/.
(c) The Contractor may submit a payment request and receiving report using other than WAWF only when–
(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor. In such cases, the Contractor shall include a copy of the
Contracting Officer's determination with each request for payment;
(2) DoD makes payment for commercial transportation services provided under a Government rate tender or a contract for transportation services using a DoD-approved electronic third party payment system or other exempted vendor payment/invoicing system (e.g., PowerTrack, Transportation Financial Management System, and Cargo and
Billing System);
(3) DoD makes payment for rendered health care services using the TRICARE Encounter Data System (TEDS) as the electronic format; or
(4) When the Governmentwide commercial purchase card is used as the method of payment, only submission of the receiving report in electronic form is required.
(d) The Contractor shall submit any non-electronic payment requests using the method or methods specified in
Section G of the contract.
(e) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payments requests.
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause--
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area
WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training
Course and use the Practice Training Site before submitting payment requests through
WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data
Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
INVOICE AND RECEIVING REPORT COMBO
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in
WAWF, as specified by the contracting officer.
As specified in CLINs.
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC TBD
Issue By DoDAAC ____
Admin DoDAAC ____
Inspect By DoDAAC ____
Ship To Code ____
Ship From Code ____
Mark For Code ____
Service Approver (DoDAAC) ____
Service Acceptor (DoDAAC) ____
Accept at Other DoDAAC ____
LPO DoDAAC ____
DCAA Auditor DoDAAC ____
Other DoDAAC(s) ____
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send
Additional Email Notifications” field of WAWF once a document is submitted in the system.
TBD
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
Jerry Palmer at 401-832-4964 or gerard.palmer@navy.mil
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
NOTE: In order to prevent delays in processing of invoices for payment the following process is hereby instated.
Vendors cannot create and submit WAWF invoices until the item contracted for has been shipped and a reasonable time frame for delivery, inspection, and acceptance has passed.
If a vendor submits prior to shipment, the WAWF document will be rejected with instructions to resubmit upon a valid delivery time frame.
Failure to adhere to this process will cause unnecessary delays and additional effort on all parties concerned.
HQ G-2-0009 SUPPLEMENTAL INSTRUCTIONS REGARDING INVOICING (NAVSEA)(APR 2015)
(a) For other than firm fixed priced contract line item numbers (CLINs), the Contractor agrees to segregate costs incurred under this contract/task order (TO), as applicable, at the lowest level of performance, either at the technical instruction (TI), sub line item number (SLIN), or contract line item number (CLIN) level, rather than on a total contract/TO basis, and to submit invoices reflecting costs incurred at that level. Supporting documentation in Wide
Area Workflow (WAWF) for invoices shall include summaries of work charged during the period covered as well as overall cumulative summaries by individual labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of other direct costs (ODCs), materials, and travel, by TI, SLIN, or CLIN level. For other than firm fixed price subcontractors, subcontractors are also required to provide labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of ODCs, materials, and travel invoiced. Supporting documentation may be encrypted before submission to the prime contractor for WAWF invoice submittal. Subcontractors may email encryption code information directly to the Contracting Officer (CO) and Contracting Officer Representative (COR). Should the subcontractor lack encryption capability, the subcontractor may also email detailed supporting cost information directly to the CO and COR; or other method as agreed to by the CO.
(b) Contractors submitting payment requests and receiving reports to WAWF using either Electronic Data
Interchange (EDI) or Secure File Transfer Protocol (SFTP) shall separately send an email notification to the COR and CO on the same date they submit the invoice in WAWF. No payments shall be due if the contractor does not provide the COR and CO email notification as required herein.
G10 CONTRACTUAL AUTHORITY AND COMMUNICATIONS (JAN 2016)
(a) Functions: The Procuring Contracting Officer (PCO) for this contract is identified on the basic contract. Only the mailto:gerard.palmer@navy.mil
PCO can change the basic contract, and the PCO maintains primacy over the contract and all its task orders. The
Contracting Officer of this Task Order is a warranted Ordering Officer of the Naval Undersea Warfare Center
Division Newport. The Government reserves the right to administratively transfer authority over this task order from the individual named below to another Contracting Officer at any time.
(b) Authority: The Contracting Officer is the only person authorized to approve changes in any of the requirements of this task order and, notwithstanding provisions contained elsewhere in this task order, the said authority remains solely the Contracting Officer's. The Contractor shall not comply with any order, direction or request of Government personnel - that would constitute a change - unless it is issued in writing and signed by the Contracting Officer. No order, statement, or conduct of any Government personnel who visit the Contractor's facilities or in any other manner communicates with Contractor personnel during the performance of this task order shall constitute a change under the Changes clause of this task order and no adjustment will be made in the task order price to cover any increase in charges incurred as a result thereof. Therefore, in no event will any understanding, agreement, modification, change order, or other matter deviating from the terms of the basic contract or this task order between the contractor and any other person be effective or binding on the Government. If, in the opinion of the contractor, an effort outside the existing scope of this task order is requested, the contractor shall promptly notify the
Contracting Officer in writing. No action shall be taken by the contractor unless the Contracting Officer or basic contract PCO has issued a formal modification.
(c) The Contracting Officer is: TBD
Name:
Telephone: Commercial 401-832 ; DSN 432-
Fax Commercial: 401-832-4820; DSN: 432-4820
Email: @navy.mil
(d) The Negotiator is:
Name: Justen K.J. Cantan
Telephone: Commercial 401-832-8976 ; DSN 432-8976
Fax Commercial: 401-832-4820; DSN: 432-4820
Email: justen.cantan@navy.mil
(e) The Contracting Officer’s Representative (COR) for this contract is: TBD
Code:
Mailing Address: Naval Undersea Warfare Center Division, Newport, 1176 Howell Street, Building: Room: , Newport, RI 02841
Telephone: Commercial 401-832 ; DSN 432-
Fax Commercial: 401-832- ; DSN: 432-4820
Email: @navy.mil
The COR is responsible for those specific functions assigned in the COR Appointment Letter.
(f) Contractor’s Representative is: OFFEROR TO FILL-IN
Title:
Mailing Address:
E-Mail Address:
Telephone:
Fax:
G18 CONTRACT ADMINISTRATION FUNCTIONS (HARDWARE) (JAN 2012)
(a) The cognizant Administrative Contracting Office for this contract is identified on page one of this contract.
(b) The Administrative Contracting Officer (ACO) is delegated the following functions:
(1) All functions of FAR 42.302(a).
(2) The function of FAR 42.302(b)(4); negotiating and executing supplemental agreements providing for the deobligation of unexpended dollar balances considered excess to known contract requirements, and for the crediting of any overpayments made to the contractor. Attach a copy of the modification to the DD 1594 and forward to the PCO address (Attn: Code 59C -- CLOSEOUT)
(3) The function of FAR 42.302(b)(6).
(c) If the ACO identifies a contract administration problem, the remedy for which is not covered by the above, the
ACO shall request the PCO to delegate additional functions as necessary. The PCO may delegate authority by letter.
Section H - Special Contract Requirements
H24 PROHIBITION ON TELECOMMUNICATIONS (OCT 2006)
The contractor is expressly prohibited from purchasing any telecommunication devices (i.e.