N66604_15_R_1701_0005.pdf
PDF 35 KB Posted
- Attached to
- Breech Extension Guide Federal contract opportunity
- Solicitation number
- N66604-15-R-1701
About this file
Amendment 0005 to include additional point of contact for proposal submissions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N66604_15_R_1701_0006.pdf | ||
| N66604_15_R_1701_0004.pdf | ||
| N66604_15_R_1701_0003.pdf | ||
| N66604_15_R_1701_0002.pdf | ||
| N66604_15_R_1701_0001.pdf | ||
| N66604_15_R_1701.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1300477840
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this modification is to include an additional point of contact for proposal submissions.
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Jul-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N66604-15-R-1701
X 9B. DATED (SEE ITEM 11)
26-May-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Jul-2016
CODE
NAVAL UNDERSEA WARFARE CTR. DIV., NPT.
JUSTEN K.J. CANTAN, CODE 0221, CONTRACTS DEPA
1176 HOWELL STREET, BLDG. 1258
NEWPORT RI 02841-1708
N66604 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N66604-15-R-1701
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been modified:
GENERAL INFORMATION
FSC: 3444
NUWCDIVNPT Control Number: 151701
NUWCDIVNPT Requisition Number(s): 1300477840
NUWCDIVNPT POC: Negotiator Name: Justen K.J. Cantan (Phone: (401) 832-8976; Fax: (401) 832-4820;
Email: justen.cantan@navy.mil)
Amendment #0005:
The purpose of this modification is to include an additional point of contact for proposal submissions.
SECTION L-
1. Clause L30X “PROPOSAL SUBMISSION - GENERAL REQUIREMENTS (JAN 2012)”
(a) Insert: Ms. Mary Ann Gardner at maryann.gardner@navy.mil
# Question Response 1 Can you confirm whether the main BEG body was manufactured from a single casting (or multiple castings) or manufactured as a large weldment?
“81346/ASTM-A183 GR-F304L" reveals that the BEG Main Body is neither a casting nor a weldment, but a forging. Please refer to Drawing 7383856, Sheet 7-3, part number 13, which provides the material form/condition.
2 If castings, can you please provide casting drawings and your current approved sources for these castings?
“81346/ASTM-A183 GR-F304L" reveals that the BEG Main Body is neither a casting nor a weldment, but a forging. Please refer to Drawing 7383856, Sheet 7-3, part number 13, which provides the material form/condition.
3 Is the forging provided as GFE, or is the contractor required to procure the forging?
The contractor is required to procure the forging.
4 If contractor is required to procure, we need to know the source. The specified CAGE code 81346 only shows "American Society for Testing and Materials" (ASTM) which does not appear to be a forging house.
This is part of the procurement and the Government does not know the previous source utilized for the forging.
5 Although we incorrectly referred to this as a casting instead of a forging, we still need the original forging drawings to determine how much machining will be required to finish this part according to the prints. For example, forgings with 1/4" excess material will require considerably more time to machine than
This is part of the procurement and any forging drawings are the responsibility of the vendor. The Government does not know the forging house utilized and also does not have forging drawings.
forgings with only 1/8" excess material.
All other terms and conditions remain unchanged.
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
L30X PROPOSAL SUBMISSION - GENERAL REQUIREMENTS (JAN 2012)
(a) Offerors must respond to all requirements of the solicitation document. Submit all proposals electronically to Mr. Justen K.J. Cantan at justen.cantan@navy.mil AND Ms. Mary Ann Gardner at maryann.gardner@navy.mil.
Attachment file size shall not exceed 10MB per transmission.
(b) Proposal Format. This section specifies the format that offerors shall use in submitting proposals in response to this solicitation. The intent is to provide a certain degree of uniformity in the format of the proposals to ensure a complete, fair and efficient evaluation.
(1) Partition. Offerors are required to submit their proposals in separate parts as follows:
(i) Letter of Transmittal, if any
(ii) Signed solicitation document with all the required fill-ins completed. Offerors shall also include signed copies of all amendments issued to the solicitation.
(iii) Volume I - Technical Proposal - Include all data and information required for evaluation as set forth in the provision entitled, "Technical Proposal". Exclude any reference to the pricing aspects of the offer.
(iv) Volume II - Cost/Price Proposal - Include all data and information required for evaluation. The offeror shall complete CLIN 0001 by filling in their proposed unit price. Offeror shall extend the unit pricing by multiplying the Unit Price by the quantity specified to produce a total price per CLIN. The offeror shall provide a total price for all CLINs.
(v) Page Limits and Copies.
Volume Maximum Number of Pages
Volume I - Technical 15 (Not including Past Performance Data)
Volume II –Cost/Price No Limit
Important Note: Offerors shall not include CLASSIFIED material in the volumes.
(2) General Format and Markings.
(i) Pages shall be consecutively numbered. Type size shall be 10 point “Times New Roman” font or equivalent, uncompressed and unreduced. Text shall be single-spaced with margins of at least one inch on all sides.
(ii) Provide a Table of Contents in sufficient detail so that the important proposal elements can be easily located. The proposal Title Page shall include all information required below:
Proposal Title Proposal Category (Technical or Cost) Volume number Security classification (Unclassified only) RFP number Name and address of the offeror Serial number/copy number
(iii) Subcontractor data submitted directly to the Government in support of the prime offeror's cost proposal shall follow the format described above. Subcontractor submittals shall prominently identify the prime offeror.
(c) Style.
(1) Submit a proposal that clearly and concisely describes and defines the contractor's response to the requirements contained in the solicitation. General or vague statements such as "standard procedures will be used" or "good engineering practices" will not satisfy this requirement.
(2) Do not elaborate unnecessarily or provide other presentations beyond that sufficient to present a complete and effective proposal. Elaborate artwork, expensive paper or bindings, and expensive visual or other presentation aids are neither necessary nor desired. Either of these may be construed as an indication of a lack of understanding of cost consciousness.
(3) Do not repeat information required in the responses in two or more proposal data requirements. Include detailed information in the area of the proposal where it contributes most critically. In other areas where a repeat discussion is necessary, provide a reference to the detailed discussion location.
(4) Provide all pertinent information in sufficient detail to permit evaluation of the proposal. Provide cross-references so that the Government can trace the various related discussions.
(End of Summary of Changes)