EMATT Pre-solicitation day conference – 12/11/2014
Question 1). What are the lot sizes?
Answer: The lot sizes are 250-300 size
Question 2). Does the navy own the PTP?
Answer: No, this is a build to spec
Question 3). Has the true echo repeat technology been proven?
Answer: The true echo repeat is in contract for now, and we are starting to receive deliveries.
The technology has been proven and demonstrated.
Question 4). Is the drawing package level 2?
Answer: We don’t own the Technical drawing package, we only own the performance specification.
Question 5). Is there a schedule for post award deliveries?
Answer: First delivery is required 10 months after award, with lots of 275 units every 3 months.
Question 6). Will the slides be posted?
Answer: Yes, the will be posted to FEDBIZOPS
Question 7). Is the present production and test apparatus owned by the government?
Answer: No.
Question 8). Is the towed array part of the current contract?
Answer: The current design consists of a towed array. A towed array is not specified in the performance specification.
Question 9). Is the TER EMATT present being built?
Answer: We’re on the contract for full production, with deliveries expected at the end of the summer.
Question 10). Who is presently building the TER EMATT?
Answer: The TER is an option under the incumbent contract.
Question 11). Is there a FAT requirement prior to production?
Answer: Yes.