N66604-15-Q-2782

Questions Received by Industry and Government Responses – 11 Aug 2015

Q1: The SOO provides barge dimension for consideration of painting surface area identified as Item 2.0 Scope: The contractor shall prepare painting surfaces, prime and paint the YFN-1250 barge. Painting shall include applying a minimum of 6 mils of the specified paint to the exterior, including the roof of the barge to the waterline. Measurements are as follows:

Dimensions of barge: 110’L x 21’W x 21’6”H.

Dimension of barge above waterline: 18’6”.

Dimensions of the deck housing: 88’L x 26’W x 12’6”H.

Dimensions of deck housing roof: 88’L x 26” W

The width of the Barge is identified as 21 ft. However, both the width of the Deck Housing structure and the Housing roof are identified as 26 ft. All measurements are highlighted in Yellow above.

Please advise the correct width size of the Barge itself (The Barge width has to be more than the housing itself that sits atop of the structure).

A2: The barge is actually 110’L x 32’W x 21’6” H. All other dimensions provided are correct and verified

Q2: Will surface preparation allow for grit blasting to corrosion and loose paint chips etc.

A2: The Contractor is required to remove all loose material. If Grit blasting is desired, the contractor will ensure that all materials are contained and captured upon completion of task.

Q3: Please advise how we can access the applicable documents listed in paragraph 3.0 (specifically 3.1:

YFN 1250 Drawings And Pictures; 3.2: NUWCDIVNPTINST 5090.3D Hazardous Materials Control Program;

and 3.3: NUWCDIVNPTINST 5100.5B Occupational Safety & Health Program.

A3: There is no need for the Contractor to obtain a copy of the instructions.

3.1 Drawings and Pictures are available from the site and can be provided electronically if requested from either Bud Dobbertin at Englebert.Dobbertin@navy.mil or Mark Hammond at mark.hammond@navy.mil .

3.2 NUWCDIVNPTINST 5090.3D Hazardous Materials Control Program: This instruction addresses the Government responsibilities regarding the management and use of Hazardous materials. The materials to be utilized on this task are not Hazardous but are controlled within the Government system. Portion applicable to the contractor is that the contractor shall provide MSDS sheets and quantity of materials to be brought on site.

3.3 NUWCDIVNPT INST 5090.3D Occupational Safety & Health Program: This instruction addresses the Government responsibilities regarding safety and a safe work environment. This instruction specifically directs Contractors to comply with OSHA standards. Portion applicable to the contractor is that the contractor shall follow OSHA standards.

mailto:Englebert.Dobbertin@navy.mil mailto:mark.hammond@navy.mil

N66604-15-Q-2782

Q4: In reviewing Paragraph 5.0 of the SOW for the above Solicitation, we understand item number 5 the Government will provide Boom Extension to facilitate lowering the Paint Float into the water. Please advise if this Paint Float will be provided by the Government. Since Paragraph 4.0 (Requirements) does not specifically identify contractor to provide the Paint Float, is it assumed the Paint Float will be provided to complete paining tasks (Para.5.0)?

A4: The paint float is the responsibility of the Contractor.