N66604-14-R-0344-01.pdf
PDF 140 KB Posted
- Attached to
- Unmanned Underwater Vehicles (UUV) services Federal contract opportunity
- Solicitation number
- N66604-14-R-0344
About this file
Solicitation amendment
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N66604-14-R-0344.pdf | ||
| SOW.doc | DOC document | |
| CDRL_1__2.doc | DOC document | |
| CDRL_5__6.doc | DOC document | |
| CDRL_3__4.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this solicitation amendment is to make changes to the information contained in CLIN 0002 ODCs and to modif iy clauses
5252.216-9122 LEVEL OF EFFORT (DEC 2000) and L47 COST PROPOSAL (SEP 2001), also the addition of clause HQ L-2-0008
REQUIREMENT CONCERNING WORK WEEK (MAY 1993). The solicitation is amended accordingly:
1. CONTRACT ID CODE PAGE OF PAGES
1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Apr-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N66604-14-R-0344
X 9B. DATED (SEE ITEM 11)
22-Apr-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Apr-2014
CODE
NAVAL UNDERSEA WARFARE CTR. DIV., NPT.
STEPHANIE A. SMYTH, CODE 5911
COMMERCIAL ACQUISITION DEPARTMENT
1176 HOWELL STREET, BLDG. 1258
NEWPORT RI 02841
N66604 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N66604-14-R-0344
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0002
The contract type has changed from CPFF to COST.
The cost constraint NTE has been added.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 Lot ODCs
COST
Other Direct Costs
FOB: Destination
ESTIMATED COST
SECTION H - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
5252.216-9122 LEVEL OF EFFORT (DEC 2000)
(a) The Contractor agrees to provide the total level of effort specified in the next sentence in performance of the work described in Sections B and C of this contract. The total level of effort for the performance of this contract shall be 317,200 total man-hours of direct labor, including subcontractor direct labor for those subcontractors specifically identified in the Contractor's proposal as having hours included in the proposed level of effort.
(b) Of the total man-hours of direct labor set forth above, it is estimated that
(Offeror to fill-in) man-hours are uncompensated effort.
Uncompensated effort is defined as hours provided by personnel in excess of 40 hours per week without additional compensation for such excess work. All other effort is defined as compensated effort. If no effort is indicated in the first sentence of this paragraph, uncompensated effort performed by the Contractor shall not be counted in fulfillment of the level of effort obligations under this contract.
(c) Effort performed in fulfilling the total level of effort obligations specified above shall only include effort performed in direct support of this contract and shall not include time and effort expended on such things as (local travel to and from an employee's usual work location), uncompensated effort while on travel status, truncated lunch periods, work (actual or inferred) at an employee's residence or other non-work locations (except as provided in paragraph (j) below), or other time and effort which does not have a specific and direct contribution to the tasks described in Sections B and C.
(d) The level of effort for this contract shall be expended at an average rate of approximately hours per week. It is understood and agreed that the rate of man-hours per month may fluctuate in pursuit of the technical objective, provided such fluctuation does not result in the use of the total man-hours of effort prior to the expiration of the term hereof, except as provided in the following paragraph.
(e) If, during the term hereof, the Contractor finds it necessary to accelerate the expenditure of direct labor to such an extent that the total man-hours of effort specified above would be used prior to the expiration of the term, the Contractor shall notify the Contracting Officer in writing setting forth the acceleration required, the probable benefits which would result, and an offer to undertake the acceleration at no increase in the estimated cost or fee together with an offer, setting forth a proposed level of effort, cost breakdown, and proposed fee, for continuation of the work until expiration of the term hereof. The offer shall provide that the work proposed will be subject to the terms and conditions of this contract and any additions or changes required by then current law, regulations, or directives, and that the offer, with a written notice of acceptance by the Contracting Officer, shall constitute a binding contract.
The Contractor shall not accelerate any effort until receipt of such written approval by the
Contracting Officer. Any agreement to accelerate will be formalized by contract modification.
(f) The Contracting Officer may, by written order, direct the Contractor to accelerate the expenditure of direct labor such that the total man-hours of effort specified in paragraph (a) above would be used prior to the expiration of the term. This order shall specify the acceleration required and the resulting revised term. The Contractor shall acknowledge this order within five days of receipt.
(g) If the total level of effort specified in paragraph (a) above is not provided by the
Contractor during the period of this contract, the Contracting Officer, at its sole discretion, shall either (i) reduce the fee of this contract as follows:
Fee Reduction = Fee (Required LOE - Expended LOE)
Required LOE or (ii) subject to the provisions of the clause of this contract entitled "LIMITATION OF
COST" (FAR 52.232-20) or "LIMITATION OF COST (FACILITIES)" (FAR 52.232-21), as applicable, require the Contractor to continue to perform the work until the total number of man-hours of direct labor specified in paragraph (a) above shall have been expended, at no increase in the fee of this contract.
(h) The Contractor shall provide and maintain an accounting system, acceptable to the
Administrative Contracting Officer and the Defense Contract Audit Agency (DCAA), which collects costs incurred and effort (compensated and uncompensated, if any) provided in fulfillment of the level of effort obligations of this contract. The Contractor shall indicate on each invoice the total level of effort claimed during the period covered by the invoice, separately identifying compensated effort and uncompensated effort, if any.
(i) Within 45 days after completion of the work under each separately identified period of performance hereunder, the Contractor shall submit the following information in writing to the Contracting Officer with copies to the cognizant Contract Administration
Office and to the DCAA office to which vouchers are submitted: (1) the total number of man-hours of direct labor expended during the applicable period; (2) a breakdown of this total showing the number of man-hours expended in each direct labor classification and associated direct and indirect costs; (3) a breakdown of other costs incurred; and (4) the
Contractor's estimate of the total allowable cost incurred under the contract for the period. Within 45 days after completion of the work under the contract, the Contractor shall submit, in addition, in the case of a cost underrun; (5) the amount by which the estimated cost of this contract may be reduced to recover excess funds and, in the case of an underrun in hours specified as the total level of effort; and (6) a calculation of the appropriate fee reduction in accordance with this clause. All submissions shall include subcontractor information.
(j) Unless the Contracting Officer determines that alternative worksite arrangements are detrimental to contract performance, the Contractor may perform up to 10% of the hours at an alternative worksite, provided the Contractor has a company-approved alternative worksite plan. The primary worksite is the traditional “main office” worksite. An alternative worksite means an employee’s residence or a telecommuting center. A telecommuting center is a geographically convenient office setting as an alternative to an employee’s main office. The Government reserves the right to review the Contractor’s alternative worksite plan. In the event performance becomes unacceptable, the Contractor will be prohibited from counting the hours performed at the alternative worksite in fulfilling the total level of effort obligations of the contract. Regardless of work location, all contract terms and conditions, including security requirements and labor laws, remain in effect. The
Government shall not incur any additional cost nor provide additional equipment for contract performance as a result of the Contractor’s election to implement an alternative worksite plan.
(k) Notwithstanding any of the provisions in the above paragraphs, the Contractor may furnish man-hours up to five percent in excess of the total man-hours specified in paragraph
(a) above, provided that the additional effort is furnished within the term hereof, and provided further that no increase in the estimated cost or fee is required.
NOTE: Please complete the table below:
Labor Category eCraft Category Man-hours Contractor Site
Total:
The minimum quantity of labor hours is 500
The maximum quantity of labor hours is 317,200
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been added by full text:
HQ L-2-0008 REQUIREMENTS CONCERNING WORK WEEK (NAVSEA)
(MAY 1993)
(a) Uncompensated effort is defined as hours provided by personnel in excess of 40 hours per week without additional compensation for such excess work.
(b) The offeror may include uncompensated effort in its proposed level of effort if:
(1) The offeror has an established cost accounting system, approved by the Defense
Contract Audit Agency, which records all hours worked, including uncompensated hours, for all employees, and regardless of contract type.
(2) Uncompensated hours, for all employees and regardless of contract type, are included in the offeror's base for allocation of overhead costs.
(3) The proposal identifies hours of uncompensated effort proposed by labor category.
(4) The proposal identifies the amount of uncompensated effort which will be performed without supervision and without support personnel and assesses the productivity of such effort.
(5) The proposal describes the extent to which employees are required or encouraged to perform uncompensated effort and the impact the use of uncompensated effort has on work effectiveness.
(6) The proposal includes a copy of the corporate policy addressing uncompensated effort.
(c) The above information must be provided for each subcontract which has uncompensated effort included in the proposed level of effort.
(d) Any proposal which includes uncompensated effort in the proposed level of effort not in compliance with the above may be rejected.
The following have been modified:
L47 COST PROPOSAL (SEP 2001)
(a) Content of Cost Proposal. Complete the Cost Summary Sheet, Attachment #10 hereto, and include it in your cost proposal. Trace cost data from the supporting data and calculations to the Cost Summary Sheet. Supply the most currently available rates for direct labor, overhead, general and administrative expense, and any other factors used in developing the proposal. Submit any information reasonably required to explain the estimating process, including:
(1) The judgmental factors applied and the mathematical or other methods used in the estimate, and
(2) Any contingencies used in the cost proposal.
(3) A copy or pertinent excerpts from your personnel policies pertaining to compensation plan(s) for professional employees including performance appraisal and salary administration procedures, salary grades and ranges, summary of basic benefit programs and relocation policies (See 52.222-46, Evaluation of
Compensation for Professional Employees).
(b) Labor Costs. Provide full justification for all proposed direct labor rates (unburdened). Provide the current actual hourly wage rate for each key person proposed. Identify the date as of which the actual wage rate is current. If proposed direct labor rates vary from actual wages of key personnel, explain the basis for those rates. Trace proposed direct labor rates to proposed individual personnel. For any proposed escalation factor provide complete supporting data and rationale for out-year projections.
(c) Indirect Costs. Provide data on all indirect rates proposed including beginning and end date of the period covered by the rate and composite rate calculations, if any. Identify clearly the bases to which the rates are applied.
(d) Material.
(1) Use the following estimates (plus applicable indirect costs) for required material and travel costs. You are required to distribute these sums among subcontractors consistent with the technical proposal. Whenever a subcontractor proposes material costs, the subcontractor must fully burden such costs and these costs must be added to the material estimate. Subcontractor proposals shall include a complete listing of all costs other than labor which are charged direct by their company exclusive of travel costs and purchased material which is incorporated into a deliverable item.
(2) The Material estimate is $8,100,000.00 . The material estimate includes only those items of purchased material which are incorporated into a deliverable product. Provide a complete listing of all items (other than labor) that are charged direct and an estimate of the costs applicable to this procurement for each of the items charged direct. Provide justification for all proposed amounts. Any category of direct charge which is listed but for which no costs are proposed must include a scenario under which those costs might be incurred under the proposed contract as well as the rationale for not proposing a cost.
(3) The Travel estimate is $ 185,000.00 . The travel estimate includes travel and subsistence for work at alternative work sites as designated in individual Orders and for allowable local travel per the JTR. For further information relative to travel costs, see the clause in Section H entitled "Travel Costs and Responsibilities".
(4) Any offeror having an accounting system which includes, within overhead or G & A, the cost elements of material and travel/subsistence shall specifically state this fact in the cost proposal. This will preclude these costs from being unduly considered in the Government's cost evaluation.
(5) Subcontracts in excess of $100,000.00 shall be supported by a Cost Summary Sheet prepared by the subcontractor. All requirements for the prime contract cost proposal shall be met by the subcontractor as well.
Subcontracts regardless of dollar value shall be adequately documented to facilitate a determination of cost reasonableness using a Cost Summary Sheet. Note that compensation for labor paid to any individual who is not a bona fide employee of the offeror is a subcontract.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .