Attachment 6 Organizational Experience Matrix.doc
DOC document 38 KB Posted
- Attached to
- Development, Technical, Management, and Engineering Services for Intelligence, Surveillance, and Reconnaissance Systems Federal contract opportunity
- Solicitation number
- N66001-17-R-0494
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers N6600117R0494.pdf | ||
| Attachment 9 Small Business Participation.docx | DOCX document | |
| Attachment 3 WD 04-0047 Rev 14.pdf | ||
| Attachment 8 Past Performance Questionaire.doc | DOC document | |
| Questions and Answers3- N6600117R0494.pdf | ||
| Attachment 5 - Desired Personnel QualificationsA0001.pdf | ||
| ATTACHMENT 4B Subcontract Rate Sheet COST V1.1.xlsx | XLSX spreadsheet | |
| N6600117R0494 Amendment 0001.pdf | ||
| Attachment 4A Prime Rate Sheet V1.1.xlsx | XLSX spreadsheet | |
| N6600117R0494 Amendment 0002.pdf | ||
| Attachment 7 - Reference Information Sheet.docx | DOCX document | |
| N66001-17-R-0494.pdf | ||
| Attachment 2 WD-15-5365 Rev 6.pdf | ||
| Question and Answer-2- N6600117R0494.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 6 Organizational Experience Matrix
In accordance with RFP provision L-TXT-12, Volume III-Section A, complete and submit the following matrix to show the breadth, depth and relevance of organizational experience on Government contracts since 1 May 2012 for the specified Statement of Work (SOW) key areas, as follows:
Specification, Design, and Development (SOW para 2.2)
Fabrication, Integration, Assembly, and Installation (SOW para 2.3) Test and Evaluation, Demonstration, Deployment, Operation, Recovery, and Repair (SOW para 2.4)
Systems Engineering (SOW para 2.5)
Cybersecurity (SOW para 2.10)
Cite at least one reference for work performed by the prime offeror, no more than one reference per subcontractor, and no more than 3 references total. Cite references in the following order: work performed by the prime, then work performed by the subcontractor(s).
For each SOW key area, the offeror shall indicate experience by placing an “X” in the applicable column(s). The column width and depth may be expanded, as necessary.
| Ref # |
| Contract Number |
| Name of prime or subcontractor that performed the referenced work |
| 2.2 |
| 2.3 |
| 2.4 |
| 2.5 |
| 2.10 |
N66001-98-R-0069
Source Selection Information
See FAR 3.104
N66001-17-R-0494 Source Selection Information See FAR 2.101 & 3.104