View the file

Other files for this federal contract opportunity

Other files attached to N66001-17-R-0154 Network Management Reference Implementation Laboratory (NM RIL) Engineering Services and Support, newest first.
File Type Posted
N66001-17-R-0154 Amendment 0002.pdf PDF
RFP Attachment 2 - Rate Sheet.xlsx XLSX spreadsheet
RFP Attachment 1 - DD254 NMRIL MAC.pdf PDF
N66001-17-R-0154.pdf PDF
RFP Attachment 3 - Desired Personnel Qualifications.docx DOCX document
RFP Attachment 7 - Past Performance Questionnaire.docx DOCX document
RFP Attachment 5 - Org Exp - RFP Matrix.doc DOC document
RFP Attachment 4 - Small Business Participation Sheet.docx DOCX document
N66001-17-R-0154 Amendment 0001.pdf PDF
RFP Attachment 6 - Reference Information Sheet.docx DOCX document
N66001-17-R-0154 Questions & Answers.docx DOCX document
N66001-17-R-0154 Amendment 0001.pdf PDF
N66001-17-R-0154 Questions Answers.docx DOCX document
RFP Attachment 3 - Desired Personnel Qualifications.docx DOCX document
RFP Attachment 6 - Reference Information Sheet.docx DOCX document
RFP Attachment 4 - Small Business Participation Sheet.docx DOCX document
RFP Attachment 1 - DD254 NMRIL MAC.pdf PDF
RFP Attachment 5 - Org Exp - RFP Matrix.doc DOC document
RFP Attachment 7 - Past Performance Questionnaire.docx DOCX document
RFP Attachment 2 - Rate Sheet.xlsx XLSX spreadsheet
DRAFT PWS N66001-17-R-0154.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 03:00 PM local time 22 Feb 2018

X

A X B X C

D

EX

X G F 83 - 96

97 - 112 X H 113 - 117 sarah.murr@navy.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 117

(If other than Item 7) N66001

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N66001 8. ADDRESS OFFER TO

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

Section L conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

SARAH MURR 619-553-1812

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 7

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

8 - 37 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 40 - 44 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 45 - 57 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

58 - 81

PART II - CONTRACT CLAUSES

SPAWAR SYSTEMS CENTER PACIFIC

SARAH MURR, CODE 22550

SARAH.MURR@NAVY.MIL

53560 HULL STREET

SAN DIEGO CA 92152-5001

SEE SECTION L

ELECTRONIC SUBMISSION

HTTPS://E-COMMERCE.SSCNO.NMCI.NAVY.MIL/

CA 619-553-1812

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

23 Jan 2018

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N6600117R0154

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lot NMRIL Engineering Services

CPFF

Base Period (2 years) NMRIL Engineering Services in accordance with the Performance Work Statement (PWS), Section C, as specified in individual task orders.

FOB: Destination

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

0002 1 Lot Other Direct Costs (ODC)

COST

Base Period (2 years) ODC including but not limited to travel, material, and equipment in support of

CLIN 0001.

0003 Lot Contract Data Requirements List (NSP)

1001 1 Lot OPTION NMRIL Engineering Services

CPFF

Option Period 1 (2 years) NMRIL Engineering Services in accordance with the Performance Work

1002 1 Lot Other Direct Costs (ODC)

COST

Option Period 1 (2 years) ODC including but not limited to travel, material, and equipment in support of

CLIN 1001.

OPTION

1003 Lot OPTION Contract Data Requirements List (NSP)

2001 1 Lot OPTION NMRIL Engineering Services

CPFF

Option Period 2 (2 years) NMRIL Engineering Services in accordance with the Performance Work

2002 1 Lot Other Direct Costs (ODC)

COST

Option Period 2 (2 years) ODC including but not limited to travel, material, and equipment in support of

CLIN 2001.

OPTION

2003 Lot OPTION Contract Data Requirements List (NSP)

CLAUSES INCORPORATED BY FULL TEXT

B-TXT-01 PAYMENT OF FIXED FEE (COMPLETION TYPE) (JUN 2017)

***This clause shall be used in completion type task orders.***

FIXED FEE: $*. The Government shall make payment to the Contractor when requested as work progresses, but no more frequently than biweekly, on account of the fixed fee, equal to ** percent of the amounts invoiced by the

Contractor under the “Allowable Cost and Payment” clause hereof for the related period, subject to the withholding provisions of paragraph (b) of the “Fixed Fee” clause. In the event of discontinuance of the work in accordance with clause of this contract entitled “Limitation of *** the fixed fee shall be redetermined by mutual agreement equitably to reflect the diminution of the work performed; the amount by which such fixed fee is less than, or exceeds payments previously made on account of fee, shall be paid, or repaid by, the Contractor, as the case may be.

* To be completed upon contract award.

** To be determined at the Task Order level. The allowable fee percentage will be negotiated at the Task Order level, and shall not exceed the percentage proposed at the basic contract level.

*** To be determined at the Task Order level.

(End of clause)

B-TXT-04 LEVEL OF EFFORT--FEE ADJUSTMENT FORMULA (JUN 2017)

***This clause shall be used in term/level-of-effort task orders.***

(a) Subject to the provisions of the “Limitation of Cost” or “Limitation of Funds” clause (whichever is applicable to this contract), it is hereby understood and agreed that the fixed fee is based upon the Contractor providing the below listed number of staff-hours of direct labor, hereinafter referred to as X, at the estimated cost and during the term of this contract specified elsewhere herein:

CLIN Total Staff-hours of Direct Labor (X)

0001 TBD at task order level 1001 TBD at task order level 2001 TBD at task order level

The Contractor agrees to provide the total level of effort specified above in performance of work described in Sections “B” and “C” of this contract. The total staff-hours of direct labor shall include subcontractor direct labor hours for those subcontractors identified in the Contractor’s proposal as having hours included in the proposed level of effort.

(b) Of the total staff-hours of direct labor set forth above, it is estimated that zero (0) staff-hours are competitive time (uncompensated overtime). Competitive time (uncompensated overtime) is defined as hours provided by personnel in excess of 40 hours per week without additional compensation for such excess work. All other effort is defined as compensated effort. If no amount is indicated in the first sentence of this paragraph, competitive time (uncompensated overtime) effort performed by the contractor shall not be counted in fulfillment of the level of effort obligations under this contract.

(c) Effort performed in fulfilling the total level of effort obligations specified above shall only include effort performed in direct support of this contract and shall not include time and effort expended on such things as local travel from an employee’s residence to their usual work location, uncompensated effort while on travel status, truncated lunch periods, or other time and effort which does not have a specific and direct contribution to the tasks described in Section B.

(d) It is understood and agreed that various conditions may exist prior to or upon expiration of the term of the contract, with regard to the expenditure of labor staff-hours and/or costs thereunder which may require adjustment to the aggregate fixed fee. The following actions shall be dictated by the existence of said conditions:

(1) If the Contractor has provided not more than 105% of X or not less than 95% of X, within the estimated cost, and at the term of the contract, then the fee shall remain as set forth in Section B.

(2) If the Contractor has provided X-staff-hours, within the term, and has not exceeded the estimated cost then the Contracting Officer may require the Contractor to continue performance until the expiration of the term, or until the expenditure of the estimated cost of the contract except that, in the case of any items or tasks funded with O&MN funds, performance shall not extend beyond 30 September. In no event shall the Contractor be required to provide more than 105% of X within the term and estimated cost of this contract. The fee shall remain as set forth in Section B.

(3) If the Contractor expends the estimated cost of the contract, during the term of the contract and has provided less than X staff-hours, the Government may require the Contractor to continue performance, by providing cost growth funding, without adjusting the fixed fee, until such time as the Contractor has provided X staff-hours.

(4) If the Contracting Officer does not elect to exercise the Government’s rights as set forth in paragraph (d)(2) and (d)(3) above, and the Contractor has not expended more than 95% of X staff-hours, the fixed fee shall be equitably adjusted downward to reflect the diminution of work.

(5) Nothing herein contained shall, in any way, abrogate the Contractor’s responsibilities, and/or the Government’s rights within the terms of the contract provision entitled “Limitation of Cost” or “Limitation of Funds” as they shall apply throughout the term of the contract, based upon the total amount of funding allotted to the contract during its specified term.

(e) Within 45 days after completion of the work under each separately identified period of performance hereunder, the Contractor shall submit the following information in writing to the Contracting Officer with copies to the cognizant Contract Administration Office and DCAA office to which vouchers are submitted:

(1) The total number of staff-hours of direct labor expended during the applicable period.

(2) A breakdown of this total showing the number of staff-hours expended in each direct labor classification and associated direct and indirect costs.

(3) A breakdown of other costs incurred.

(4) The Contractor’s estimate of the total allowable cost incurred under the contract for the period.

In the case of a cost under-run, the Contractor shall submit the following information in addition to that required above:

(5) The amount by which the estimated cost of this contract may be reduced to recover excess funds and the total amount of staff-hours not expended, if any.

(6) A calculation of the appropriate fee reduction in accordance with this clause.

All submissions required by this paragraph shall include subcontractor information, if any.

(f) SPECIAL INSTRUCTION TO THE PAYING OFFICE REGARDING WITHHELD FEE

Fees withheld pursuant to the provisions of this contract, such as the withholding provided by the “Allowable Cost and Payment” and “Fixed Fee” clauses, shall not be paid until the contract has been modified to reduce the fixed fee in accordance with paragraph (d) above, except that no such action is required if the total level of effort provided falls within the limits established in paragraph (d) above.

B-TXT-08 MINIMUM AND MAXIMUM QUANTITIES (JUN 2017)

As referred to in paragraph (b) of the “Indefinite Quantity” clause of this contract, the contract minimum quantity is $10,000 per contract awardee. The maximum quantity is the total estimated amount of the contract. The maximum quantity is not to be exceeded without prior approval of the Procuring Contracting Officer.

The combined/overall ceiling for all awardees under this Multiple Award Contract is $***DETERMINED AT TIME OF AWARD***; however, no MAC awardee can exceed the value of its contract maximum quantity.

B-TXT-12 LIMITATION OF LIABILITY--INCREMENTAL FUNDING (JUN 2017)

This task order is incrementally funded and the amount currently available for payment hereunder is limited to $ through (TBD on individulal task order) inclusive of fee. It is estimated that these funds will cover the cost of performance through (TBD on individulal task order). Subject to the provisions of the FAR 52.232-22 “Limitation of Funds” clause of this contract, no legal liability on the part of the Government for payment in excess of $ through (TBD on individulal task order) shall arise unless additional funds are made available and are incorporated as modifications to this contract.

Section C - Descriptions and Specifications

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT (PWS):

NETWORK MANAGEMENT REFERENCE IMPLEMENTATION LABORATORY (NMRIL)

ENGINEERING SERVICES AND SUPPORT

1.0 SCOPE:

The scope of this Performance Work Statement (PWS) includes support to the Network Management Reference Implementation Laboratory (NM RIL) in its continuing effort to maintain the Joint Enterprise Network Manager (JENM) product for Product Lead (PL) JENM, where the PL JENM has overall responsibility for the deployment and sustainment of the JENM software. The effort also includes the procurement of incidental materials at the task order level as required.

The NM RIL supplies a full range of services for the following, but not limited to, areas:

Software Support Activities: Research, design and develop new products; create new baselines, implement and test enhancements to those baselines; update and maintain established baselines and support for all fielded software.

Systems Engineering: Evaluate, compile, and perform functional and verification testing of all JENM product builds, support generation of communication plans, and collaborate with the developers of software defined radios to ensure interoperability with JENM.

Logistics: Configure JENM to meet the specific needs of each customer, test to ensure JENM is functioning correctly, track configuration and disposition details, assist with troubleshooting communication plans, and assist users as a Tier-3 helpdesk, and provide training support and documentation.

Test Event Support: Support radio test events and field activities, such as the bi-annual Network Integration Evaluation (NIE). Act as liaison between radio vendors and the government sponsors for product development and test support.

Additionally, the scope of this PWS is to provide technical support to the Communications Division (Code 552) projects for the following, but not limited to, areas:

Management: Integrated product teams, analysis, planning documentation.

Engineering: System/network architecture design and evaluation, integration, system evaluation and trade study, design analysis and assessment, software analysis and development, technology review and design.

Test and Evaluation: Test and evaluation, site survey, help desk, implementation and integration, laboratory testing, modeling and simulation.

Integrated Logistics Support (ILS): ILS planning and life cycle support, configuration management, technical data archiving and retrieval, training, implementation, supply, Continuous Acquisition and Life Cycle System, human factors as a part of system design and computer resources

Facilities: Development, management, installation, operations, and maintenance of SPAWAR System Center (SSC) Pacific laboratory, test bed facilities, and project equipment.

Implementation/Integration: Installation support, replacement of RF, C4I, Information systems that could include procurement, integration, enhancements, fabrication and testing.

On Site Technical Assistance: On-site support including troubleshooting, integration and installation of proof of concept systems for experiments/exercises and development testing.

Security: System security engineering and certification support.

Any replacement, follow-on, or interrelated systems associated with Table 1-1 below will be covered by the scope of this PWS.

Other agencies/activities outside the United States Navy (USN), supported by Space and Naval Warfare Systems Center (SSC) Pacific, Code 55200, are NATO, the United States Air Force (USAF), US Army, Marine Corps (USMC), United States Transportation Command (USTRANSCOM), Special Operations Command (USSOCOM), STRATCOM HQ, the Defense Advanced Research Projects Agency (DARPA), National Security Agency (NSA), and the Department of Homeland Security (DHS).

1.1 BACKGROUND

The Space and Naval Warfare (SPAWAR) System Center, Pacific (SSC Pacific) Communications Division requires support for evaluation of both existing and developing communications technology. This contract will aid SSC Pacific in the goal of assisting the Department of Defense (DoD) and the Navy in identifying, implementing, developing, improving and enhancing the Command, Control, Communications, Computers, & Intelligence (C4I) and network centric warfare concept called Information Dominance.

Communications Division programs consist of communications systems covering the entire spectrum from very low frequency (VLF) through laser; wideband, narrowband and protected communications on afloat, ashore, airborne, submerged, and space based platforms.

This effort consists of support relating to the areas of management, engineering, technical assistance, integrated logistics, facilities, implementation/integration, discrete signal processing experience radar signal processing and detection/classification, instrumentation, radio frequency (RF) data acquisition, software development Information Assurance system hardening, graphical user interface (GUI) design, application interface definitions, onsite technical assistance, and security.

The Network Management Reference Implementation Laboratory produces the Joint Enterprise Network Manager (JENM) and provides support throughout the application’s life cycle.

JENM is a radio network communications planning and management application that can be configured as a stand-alone system, a virtual machine, or simply as an application. JENM offers four primary capabilities:

Communications Planning Network Instantiation and Configuration (includes loading of terminals with configuration parameters) Network Monitoring (includes network health, status, and position reporting) Network Management (includes fault management and security management)

Examples of potential support areas, related to NM RIL, under this PWS include the programs and projects listed in the table below:

Table 1-1: Project Listing

DIGITAL MODULAR RADIO (DMR) RESEARCH DEVELOPMENT TEST AND EVALUATION

(RDT&E)

LASER PROPAGATION

ENHANCED POLAR SYSTEM (EPS) GATEWAY

JOINT (UHF) MILSATCOM NETWORK INTEGRATED (JMINI) CONTROL SYSTEM

INTEGRATED WAVEFORM CONTROL SYSTEM

HIGH FREQUENCY PROPAGATION STUDIES

NETWORK MANAGEMENT REFERENCE IMPLEMENTATION LABORATORY (NM RIL)

PERISCOPE VULNERABILITY

NAVY MULTIBAND TERMINAL INTERNATIONAL PARTNER VARIANT

RADIO FREQUENCY PROPAGATION PERFORMANCE ASSESSMENT AI SUPPORT

2.0 APPLICABLE DOCUMENTS:

The following documents in this Performance Work Statement (PWS) may be incorporated for individual delivery/task orders. Nothing in the documents however, shall supersede applicable laws and regulations, unless a specific exemption has been obtained. The Contractor’s solution shall comply with current documentation, standards and guidance as outlined in each task order.

2.1 DoD 5000.01, “The Defense Acquisition System”, 12 May 2003

2.2 DoD 5000.02, “Operation of the Defense Acquisition System”, 10 August 2017

2.3 CL 810-H, “Guidebook for Performance-Based Services Acquisition (PBSA) in the Department of

Defense”, December 2000

2.4 SPAWAR “Shore Installation Process Handbook”, Version 3.0, 19 October 2009

2.5 EIA-632, Processes for Engineering a System, January 1999

2.6 SECNAVINST 5000.2E, Implementation and Operation of the Defense Acquisition System and the Joint

Capabilities Integration and Development System, 1 September 2011.

2.7 IEEE Standard for Software Project Management Plans (IEEE 1058-1998), 8 December 1998

2.8 DoD Architecture Framework (DoDAF), version 2.0, May 2009

2.9 Guidebook for Acquisition of Naval Software Intensive Systems, Ver 1.0, dtd September 2008

2.10 ISO/IEC 15288:2008(E) (IEEE Std 15288-2015) Systems and Software Engineering – System Life Cycle

Process dtd 01 May 2015

2.11 IEEE Std 829-2008 Standard for Software and System Test Documentation, 18 July 2008

2.12 ISO/IEC 12207:2008(E)/IEEE Std 12207-2008 System and Software Engineering – Software Life Cycle

Processes dtd 01 February 2008

2.13 Software Development Plan (Template), TM-SPP-02, V2.0, dtd 05 April 2005

2.14 Software Engineering Institute, Capability Maturity Model Integration (CMMI) Version 1.1 for System

Engineering, Software engineering, Integrated Product and Process Development, and Supplier Sourcing, CMU/SEI-2002-TR-012, dtd March 2002

2.15 Software Engineering Institute, Capability Maturity Model Integration (CMMI) for Services, Version 1.3, Improving Processes for Better Services, CMU/SEI-2010-TR-034, November 2010

2.16 EIA 748-B, “Earned Value Management Systems”, June 2007

2.17 ASN RD&A Memorandum, “DON Policy on Digital Product/Technical Data, 23 October 2004

2.18 DoD 8570.01M, IA Work Force Improvement Program Manual, with Change 3, 01/24/2012

2.19 SECNAV Manual 5510.30, Department of Navy Personnel Security Program, 3 January 2013

2.20 SECNAV Manual 5510.36, Department of Navy Information Security Program, June 2006

2.21 DOD M-5200.01 Volumes 1 through 4, DOD Security Program, 24 February 2012

2.22 DOD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), 28 February 2006 with

Change 2 188 May 2016

2.23 OPNAVINST F3300.53C, Navy Antiterrorism Program 25 May 2009

2.24 National Security Decision Directive 298, National Operations Security Program (NSDD) 298, 22 January

2.25 DOD 5205.02, DOD Operations Security (OPSEC) Program, 6 March, 2006

2.26 OPNAVINST 3432.1, DON Operations Security, 4 November 2011

2.27 SPAWARINST 3432.1 (Series), Operations Security Policy, 02 February 2005

2.28 DoD 8500.1 Cyber Security Program, 14 March 2014

2.29 Network Enterprise Domain Software In-Service Support (SwISS) Plan; Version 1.1, 06 August 2008

2.30 JPEO JTRS Software Standards; Version 1.4.1, 04 May 2010

2.31 JPEO JTRS Standards Standardization Plan; Version 2.0.1, 04 May 2010

2.32 JTRS Unified INFOSEC Criteria; Revision 2, 02 December 2005 (SECRET//NOFORN)

2.33 Joint Tactical Radio System (JTRS) Information Repository (IR) User Registration Guide; Version 1.7, 23 July

2.34 MIL-HDBK-61A, Configuration Management Guidance; dated 7 February 2001

2.35 MIL STD 31000A, Technical Data Packages; February 2013

2.36 United States Code, Title 10, Section 2399, "Operational Test and Evaluation of Defense Acquisition

Programs", January 2012.

2.37 JOINT TACTICAL RADIO SYSTEM (JTRS) Test and Evaluation Master Plan (TEMP) for the JTRS Network

Enterprise Domain (NED), Increment 1, October 2010.

2.38 MIL-STD-961E DEFENSE AND PROGRAM UNIQUE SPECIFICATIONS FORMAT AND CONTENT, 2

April 2008

2.39 MIL-DTL-31000C TECHINICAL DATA PACKAGES; 9 July 2004

2.40 MIL-HDBK-454A GENERAL GUIDELINES FOR ELECTRONIC EQUIPMENT, 3 November 2000

2.41 MIL-HDBK-831 PREPARATION OF TEST REPORTS 23 April 1999

2.42 DoD 5000.2-R Mandatory Procedures for Major Defense Acquisition Programs and Major Automated

Information System Acquisition Programs; 5 April 2002

2.43 Secretary of Navy Instruction (SECNAVINST) 5000.2B Implementation of Mandatory Procedures for Major and Non-Major Defense Acquisition Programs and Major and Non-Major Information Technology Acquisition Programs; 6 December 1996

2.44 American Society of Mechanical Engineers (ASME) Y14.100 Engineering Drawing Practices; 2013

2.45 ASME Y14.24, Types and Applications of Engineering Drawings; 5 April 2013

2.46 ASME Y14.34; Associated Lists 2013

2.47 ASME Y14.35M Revision of Engineering Drawings and Associated Documents 2014

2.48 12207-2008 ISO/IEC/IEEE Standard for Systems and Software Engineering — Software Life Cycle Processes

2.49 ISO/IEC standard 7498-1 Open Systems Interconnections Reference Model (OSI—RM) 1994

2.50 DoD 8570.01-M, Information Assurance Workforce Improvement Program; 10 November 2015

2.51 DoD 8510.01 "Risk Management Framework (RMF) for DoD Information Technology (IT), March 14 2014 with change 2 28 July 2017

3.0 TECHNICAL REQUIREMENTS:

The contractor shall perform the following tasks. Individual task orders will contain specific details.

3.1 SUSTAINMENT

The contractor shall perform systems engineering, design, code, test, and integration required to support sustainment of released product baseline versions; including the currently fielded and planned replacement versions.

3.1.1 Sustainment Planning

The contractor shall maintain the product planning and monitoring of waveform, radio, and network support deployed in product baseline releases.

The contractor shall provide support in definition of Information Assurance and Test strategies for baseline updates;

information Assurance (IA) engineering to maintain Authorization to Operate (ATO) and Certificate of Networthiness (CoN) approvals when product baselines are updated to resolve bugs or IA deficiencies; analysis of user complaints, bug reports, and Information Assurance deficiencies identified for released baseline products, including failure analysis and system engineering design of remediation actions or problem resolution; expanding non-developmental item (NDI) Radio Support for released baselines; assist in ensuring that the sustainment and development baselines remain in sync and shall ensure that common problems are documented and resolved in both;

improve the product usability, and support development of training packages; and provide product baseline support to other DoD organizations at the request of the Program Office.

3.1.2 Sustainment Systems Engineering

The contractor shall participate in the product Systems Engineering team providing sustainment support for problem analysis and impact working with the reporting organization to document the problem; working with the Program Office to establish baseline update priorities and release strategies; ensuring the solutions provided will not affect the product security posture; coordinating with external agencies to ensure availability of needed resources for test of product releases; working with development team to ensure good understanding of the PBIs and that solutions meet objective; and providing product User Experience cross checks to ensure solution maintains product usability and supports updates to training.

3.1.3 Sustainment Development

The contractor shall participate in the product Development team providing sustainment support for: addressing Product Improvements already identified in Sustainment backlog; updates to software and data model as required;

perform all unit and integration testing; support the resolution of any integration problems found in sustainment release testing; and ensure that all software meets the “definition of done” and all practices are maintained for the baseline.

3.1.4 Sustainment Integration, Test, and Training Support

The contractor shall provide technical support for sustainment integration and test; work with systems engineering in ensuring reproducibility of problems identified; work with systems engineering to develop the release strategy and securing Lab and radio assets required for system testing of the release; support definition of development and System Test strategies to test coverage of all release requirements; ensure all test strategy, test plans, test cases and test reports are archived; coordinate with the Development test team to ensure problems resolved in sustainment baseline are also resolved in the development baseline; and support the logistics team to ensure the System User Manual and training stays synchronized with the product.

3.1.5 Development

The contractor shall perform systems engineering, design, code, test, and integration to support development, enhancement, and product improvements to product software applications and services; design, build, modify, improve the product as determined by the basic idea or concept; support new requirements and additional capabilities that change a product not within the current performance envelope; and support the capability to improve the product within its current performance envelope.

3.1.6 Systems Engineering Support

The contractor shall participate in the product Systems Engineering team providing support to the Program Office Technical Management Directorate (TMD); support to the TMD in the definition and allocation requirements to produce components; support project management office (PMO) leadership in the release strategy definition;

participation in Program Executive Office Command Control Communications-Tactical (PEO C3T) wide Integrated Product Teams for the TMD; assist in the definition of Information Assurance and Test strategies; assist in the definition of Epics, Capabilities and Features to define development strategy; support development teams in their implementation of updates for the PBIs; product User Experience (UEx) design to simplify and improve the product usability; information Assurance (IA) engineering, support to Risk Management Framework (RMF) process to achieve authorization to operate (ATO) and Certification of Networthiness (CoN) for new product releases;

Interface Control Document updates for new or modified waveforms, services, radios, and external system applications; product support to other Department of Defense (DoD) organizations at the request of PMO; and generation of whitepapers at the request of PMO to evaluate, document, design, or assess capabilities.

3.1.7 Capability Development

The contractor shall provide technical support for the product improvements stemming from the analysis of the Product Backlog Items (PBIs) allocated to a product release that delivers the functionality defined. The contractor shall assist in decomposing Features into a set of detailed requirements for development teams in the form of

Product Backlog Items (PBIs); address Product Improvements identified in the Development backlog; analyze the PBIs to establish executable assignment to the development teams; assist in devising Simplified Planning including the ability to plan networks in the absence of a Tactical Radio Report in-feed; work with product Stakeholders to capture UEx feedback to enhance the design; add graphic visualization and editing to make planning simpler and more intuitive; work with external agencies to ensure that the product correctly supports radio services such as Enterprise Over-the-Air Management (eOTAM) and new planned services; assist in updating and Implementation of Target ICD / Reference implementation and minimizing the work NDI vendors are required to do to use it; assist in the definition and implementation of product support for new features and capabilities as radios and radio services evolve; participate in the design and implementation of interfaces to other tools in use by service planners; and add support for alternative platforms used by the other services, such as Marines, Navy, and Air Force.

3.2 MANAGEMENT SUPPORT

3.2.1 Integrated Product Team (IPT) Support

The contractor shall work with IPT lead and members to identify and prioritize tasks for the team; review progress;

participate in meetings; review, track and process action items; and provide assessments of the capabilities and deficiencies of the systems and vendors under review.

3.2.2 Program and System Management Support

The contractor shall support program and development efforts including assessing current and future system and software project requirements, analyzing changes and situations, and developing and proposing or recommending tentative approaches and solutions using a variety of tools, techniques, or processes. The contractor shall provide milestone support for major project efforts, facilitate and document project team activities, and provide input for business process modeling and reengineering. Documentation produced or modified shall be maintained in the electronic folders resident on the local area network.

3.2.3 Technical and Management Reviews

The contractor shall attend technical and management support reviews and related meetings. Examples are design reviews, process and issues resolution meetings, reviews of program status, system/subsystem requirements and critical design, various plans (test description, test case, test results), test readiness, and meetings to define and update schedules and task estimates.

3.2.4 Project Planning and Oversight

The contractor shall provide project-related planning documents and perform oversight of the planned tasks subject to government review and approval.

3.2.5 Program Management Documents

The contractor shall provide program oversight documents, such as a management plan, plan of action and milestones, schedule and work breakdown structure. Participate in technical and programmatic reviews and meetings. Submit progress and status reports as required by the task order (TO).

3.2.6 Risk Management

The contractor shall provide technical, cost, and schedule risk assessment.

3.3 ENGINEERING

3.3.1 Engineering Support

The contractor shall provide engineering support in connection with the development, installation, integration, and configuration of the Global Information Grid (GIG) and the Communications programs and information network systems.

3.3.2 System Evaluations and Trade Study Support

The contractor shall perform system evaluations, requirement reviews or trade studies to determine where changes might be recommended to correct deficiencies, achieve cost savings and improve operations. The contractor shall investigate and research new techniques and solutions meeting the requirements. The contractor shall assess program requirements, analyze problems and conditions, develop, propose and recommend approaches and solutions using a variety of tools, techniques, and processes. The types of analyses will be directed at specific engineering and program performance goals associated with the implementation and integration of supported systems on host platforms. Emphasis will be placed on achieving complete system capability with networking technologies, utilizing typical connections, wireless, satellite communications (SATCOM), or Tactical Common Data Link (TCDL) transmission paths.

3.3.3 Design Analysis and Assessment Support

The contractor shall provide design analysis or recommendations for the following: safety, human factors, reliability, maintainability, transportability, survivability, weight or weight distribution, heating/cooling, control of electrostatic discharge and mercury contamination, and power or power distribution. The contractor shall review proposed designs to assess compliance with software/system specifications. The contractor shall monitor the transition between functional, allocated, and product baselines.

3.3.4 Software Analysis

The contractor shall contribute to Integrated Product Teams by evaluating proposed software architecture, functional allocations and configuration items and assessing the fidelity of the vendor’s proposals in accordance with the system specifications and published interface control documents. The contractor shall make recommendations, when appropriate, for achieving economies-of-effort or improvement to the system architecture, including related hardware and software implementations.

3.3.5 Program Review Support

The contractor shall attend program reviews, Design Reviews, and Interface Control Document Reviews. The contractor shall evaluate key development areas and compare with expected/desired progress. The contractor shall identify risk areas and methods of mitigation.

3.3.6 Information Assurance, Network Management and Network Architecture

The contractor shall provide requirements analysis and design to provide and evaluate Information Assurance (IA).

This IA effort includes such areas as Communications Security (COMSEC) Material Systems (CMS), High Assurance Internet Protocol Encryptors (HAIPEs), firewalls and security accreditation. The contractor shall evaluate network architectures (Local Area Network (LAN)/Multi Area Network (MAN)/Wide Area Network (WAN)) provide design inputs and requirements documentation, including Network Management Systems and Network management topologies. The contractor shall measure evaluations and requirements against concepts of operations and GIG requirements documentation that includes, but is not limited to, the GIG Architecture, Net Centric Interface Documents (NCIDs) and Network Core Enterprise Services (NCES).

The contractor shall provide system security engineering and certification support as required for successful Type Accreditation prior to fielding and implementation of a system. The contractor shall ensure necessary network security accreditation and assurance issues are obtained and followed. The contractor shall determine network parameters and settings required to meet security requirements.

3.3.7 GIG Integration and Compliance

The contractor shall provide analyses of specifications, capabilities development documents, technical requirements documents and concepts of operations to ensure the system under development is fully compliant with the Open System Interconnection (OSI) levels 1 through 7. In addition, the contractor shall ensure compliance with all architectural and performance standards required for full interoperability with the GIG, including Internet Protocol version 6 (IPv6), packet communications protocols, Quality and Class of Service, dynamic resource allocation, mobile ad hoc networking, and line of sight and satellite RF communications links. The contractor shall participate in developing solutions to the Information Assurance problems of connecting weapons systems to Command, Control, Communications, Computers and Intelligence (C4I) networks.

3.3.8 User Application Engineering

The contractor shall evaluate existing systems and equipment, including production terminals and baseband/user applications. The contractor shall evaluate requirements for new systems and equipment that may include baseband/user applications and terminals. The evaluation shall include comparing specifications with proposed designs to determine feasibility, compliance, and cost effectiveness.

3.3.9 Engineering Changes

The contractor shall review documents and engineering change proposals, pertaining to communications systems design, and identify changes, possible improvements, or alternatives to the system design that could affect the Navy communication system development.

3.3.10 Software Engineering Approach

The contractor shall define a software development approach appropriate for the computer software effort to be performed under this contract. This approach shall be documented in a Software Development Plan (SDP) (see data item description (DID) No. DI-IPSC-81427A for required format and content). Once defined, the contractor shall follow this SDP for all computer software to be developed or maintained under this contract.

The SDP shall define the offeror's proposed life cycle model and the processes used as a part of that model. In this context, the term "life cycle model" is as defined in Institute of Electrical and Electronics Engineers / Electronic Industries Alliance (IEEE/EIA) Standard 12207.0. The SDP shall describe the overall life cycle and shall include primary, supporting, and organizational processes based on the work content of this contract. In accordance with the framework defined in IEEE/EIA Standard 12207.0, the SDP shall define the processes, the activities to be performed as a part of the processes, the tasks which support the activities, and the techniques and tools to be used to perform the tasks. Because IEEE/EIA Standard 12207.0 does not prescribe how to accomplish the task, the offeror must provide this detailed information so the Navy can assess whether the offeror's approach is viable.

The SDP shall contain the information defined by IEEE/EIA Standard 12207.1, section 5.2.1 (generic content) and the Plans or Procedures in Table 1 of IEEE/EIA Standard 12207.1. In all cases, the level of detail shall be sufficient to define all software development processes, activities and tasks to be conducted. Information provided must include, as minimum, specific standards, methods, tools, actions, strategies, and responsibilities associated with development and qualification.

The contractor’s software engineering approach shall afford opportunities for input and oversight by the Government.

3.3.11 Component Analysis and Design

The contractor shall perform analysis and design on new and existing system components to include evaluating their capability to meet technical, functional, and mission requirements. Analysis shall be at the system, subsystem, component, or sub-component level.

3.3.12 Component Specification

The contractor shall develop component specifications and interface requirements. The contractor shall assess the adequacy of components in terms of current and future requirements. Technical documentation in support of these designs shall be produced.

3.3.13 Integration, Test, and Training Support

The contractor shall provide technical support for the execution of the developmental testing; definition of development and System Test strategies; participation in test team activities to synergize test approaches; support for regression testing across product builds; support for monthly build integration or more often on an as needed basis at the SSC Pacific test laboratories, program of record labs, NDI vendor labs, and in the contractor’s own labs; and support System User Manual, User Guide, and training updates.

3.3.14 Technical Manuals

Appropriate software product specifications, design documents, and software listings shall be produced when specified in the individual task order.

3.3.15 System Implementation

The contractor shall provide hardware/software integration engineering and analysis, planning support, and mechanical support.

3.3.16 Integration Analysis

The contractor shall perform integration analyses on components and subsystems to integrate them into the complete system. These analyses shall address technical interface and physical limitations necessary to meet the system mission requirements. The contractor shall prepare installation criteria, drawings, and other appropriate documentation to support the design approach.

3.3.17 Interface Specifications

The contractor shall prepare integration plans describing the technical approach, interface requirements, electrical and physical layout, schedule, test, and other requirements necessary for the complete integration of the subsystem components.

3.3.18 Concept of Operations

The contractor shall develop and prepare operational concepts documentation detailing use, operation, architectures, configurations, topologies, and requirements.

3.3.19 Security Engineering

The contractor shall perform system security engineering in accordance with the process, task, and activity guidelines established in DoDI 8510.01 "Risk Management Framework (RMF) for DoD Information Technology (IT), dated March 14 2014 and its subsequent revisions.

3.4 TEST AND EVALUATION

3.4.1 Performance Analysis Evaluation

The contractor shall evaluate system performance analyses, functional decomposition approach, functional to physical allocation decisions, requirements verification planning, and hardware/software designs.

3.4.2 Site Survey Support

The contractor shall provide site survey support as required to determine the physical space, location, and details for equipment installation. For new or existing systems, conduct an evaluation of the requirements document and provide suggested candidate installation sights. The contractor shall participate in the development of Plan of Action & Milestones (POA&Ms), surveys to establish WAN and LAN interfaces involving commercial telecom and DoD networks, and local network infrastructure evaluations and security accreditations.

3.4.3 Help Desk Support

The contractor shall provide on-call and on-site technical services on equipment/systems to perform troubleshooting, checkout, repair, and testing.

3.4.4 System Operation and Verification Test (SOVT)

The contractor shall develop a SOVT Planning package and perform the SOVT to ensure satisfactory operation, availability and readiness and report on outcomes.

3.4.5 Waveform and Platform Systems Engineering

The contractor shall review and provide improvements to the waveform and platform test and evaluation plans and procedures. The contractor shall also review and provide improvements to the associated waveform and platform assessment tools. Reviews shall be conducted in accordance with the Peer Review Process. Problem Change Reports (PCR) and Lessons Learned from prior waveform assessments and platform assessments shall be used in the plan /procedures / tools improvement process. The contractor shall provide electronic versions of the document changes to the government point of contact (POC).

3.4.6 System Test Planning and Coordination

The contractor shall support preparations and planning for systems testing such as the system terminal’s factory performance tests, Inter-segment Engineering Tests, engineering tests, backward compatibility performance tests, satellite System-wide interoperability and performance tests, and Formal Qualification Testing (FQT). The contractor shall coordinate test planning meetings, system reviews, and problem resolution meetings. The contractor shall provide terminal test plans, test procedures, visual presentations, performance analyses, recommendations, and technical reports when appropriate. The contractor shall review system-level test plans, procedures, and reports, and provide comments.

3.4.7 System Test and Evaluation Master Plan (TEMP) Support and Coordination

The contractor shall provide input for planning for test and evaluation of the system terminals and existing baseband equipments to determine backward compatibility and compliance with the test and evaluation master plan (TEMP) and terminal specifications. The contractor shall attend coordination and planning meetings, system reviews, and problem resolution meetings. The contractor shall provide visual presentations, data reduction; performance analyses of TEMP specified parameters, recommendations, and technical reports when appropriate. The contractor shall review test plans and procedures for accuracy and completeness and provide comments. The contractor shall participate in operational test readiness assessments.

3.4.8 Waveform and Platform Test Assessments

The contractor shall provide support to the government team in conducting waveform and platform test assessments against existing standards as directed by the government program manager. The test assessments shall use the current versions of the approved test and evaluation plans, procedures and tools.

3.4.9 System Development Testing

The contractor shall perform analytical studies and tests in the areas of system performance and network operation to include the determination of adherence to specifications, interface control documents, operational requirements documents and test and evaluation master plans. The contractor shall perform testing data reduction, analysis and documentation of test data including writing of computer programs in support of development and operational tests.

The contractor shall develop and provide test plans and procedures for laboratory and field testing against specifications, interface control documents, operational requirements documents, test and evaluation master plans and other standards documents. The contractor shall prepare test reports to include the results of analysis of tests and which summarize the capabilities and deficiencies of the system under review. The contractor shall recommend new techniques, design changes, and other stratagems aimed toward system improvement.

3.4.10 RF Laboratory Testing

The contractor shall configure candidate test systems for evaluation with selected RF paths, then participate in the design and implementation of a laboratory test facility supporting the evaluation of candidate systems; develop engineering solutions that meets the requirements document; from initial drawings design laboratory test environment; coordinate with selected RF path's for laboratory setup, connectivity and system configuration; prepare program documents; develop configuration drawings/scheme for testing; configure selected RF paths for laboratory testing; configure network connections for laboratory testing; participate in design and plan of action and milestones for laboratory testing; conduct laboratory testing; participate and provide input for field testing of candidate systems selected via the laboratory testing process; provide configurations/settings developed during the laboratory testing;

develop reports on testing conducted in laboratory or during operational tests.

3.4.11 Network Laboratory Testing

The contractor shall develop configuration drawings/scheme for testing; configure networks for laboratory testing;

participate in design and plan of action milestones for laboratory testing; conduct laboratory testing; provide data capture and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.