Solicitation N6471026Q0017 AMD 0002 Questions and Answers.pdf

PDF 203 KB Posted

Attached to
Motor T Prefabricated Modular In-Plant Classroom
Solicitation number
N6471026Q0017
Issued by

About this file

This is a Questions and Answers document for federal solicitation N6471026Q0017 AMD 0002. The document addresses a contractor inquiry regarding the scope of work for installing a prefabricated modular classroom within an existing Motor Transport Building.

The Government confirmed that contractor responsibilities are limited to installing the prefabricated modular classroom, the HVAC system, providing one set of engineered stamped drawings, and furnishing the manufacturer's guidance on recommended future maintenance. The contractor must install the classroom on concrete with a customized foundation and make all electrical connections internal to the classroom required for operation per paragraph 4 of the Statement of Work. The Government explicitly stated there are no requirements for work outside the stated SOW, including no retrofit of fire sprinklers, fire-protection modifications, or other building alterations. Final external electrical and communications connections will be terminated by a separate external contractor and are not part of this contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation N6471026Q0017 AMD 0002 Questions and Answers

1. [REDACTED] has confirmed that it can provide a minimum 15' x 20' classroom, install it on concrete with a customized foundation, include the required classroom components, and provide stamped drawings. [REDACTED] asked whether the Government requires a retrofit of fire sprinklers inside the existing Motor Transport Building.

Please confirm, if possible, whether the Government requires any fire-sprinkler modification, fire-protection work, or other building alterations for installation of the classroom. Please also confirm that the contractor's work is limited to the classroom and its internal systems, with final external electrical and communications connections performed as stated in the SOW.

Answer: There will not be a requirement for any work outside of the stated SOW, to include, no requirement for retrofit of fire sprinklers or other building alterations. The contractor’s work is limited to install of the prefabricated modular classroom, the HVAC System, (1) set of engineered stamped drawings, and the manufacturer’s guidance on recommended future maintenance. Per paragraph 4 within the SOW, the Contractor will make all electrical connections internal to the classroom required for operation. Final electrical and communication connections will be terminated by an external contractor sperate from this contract.