N6449824R4050_CDRLS_Exhibits A - L.pdf
PDF 1 MB Posted
- Attached to
- Rolling Admissions - Commercial Depot Level Overhaul of LM2500 Power Turbine Assemblies (PTA)
- Solicitation number
- N6449824R4050
About this file
This document outlines the data requirements for the commercial depot-level overhaul of LM2500 power turbine assemblies. Key deliverables include inspection reports, status updates, requests for waivers, and a repair turnaround time analysis. The contractor must submit an incoming inspection summary, disassembly inspection report, weekly status reports, qualification test results, overhaul reports, and requests for deviations from specifications. Distribution statements and delivery methods are defined for each data item. The Navy seeks these deliverables to oversee the overhaul process and ensure components meet standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
data_item: A006 title: Repair/Modification/Overhaul Status Report sub: Weekly Status Report auth: DI-MGMT-80933A ref: SOW, Para. 4.6 req_ofc: NSWCPD C/423 dd250: LT appcode: N/A dist: C* freq: WEKLY asof: See Blk 16 firstsub: See Blk 16 subsub: See Blk 16 addressee1: PCO draft1: 0 reg1: 1 repro1:
addressee2: TPOC draft2: 0 reg2: 1 repro2:
addressee3: COR draft3: 0 reg3: 1 repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 total_reg: 3 total_repro: 0 remarks: Block 4: The report at a minimum shall contain the following:
-Contract No.
-Status report date -Serial No.
-Arrival date -Induction date/estimated workscope meeting date/estimated test date -General repair comments -GANTT chart of repair timeline -Repair status by module -Contractor technical representative point of contact information
Block 9: Distribution Statement C. Distribution authorized to U.S. Government Agencies and their contractors for administrative and operational use, 3 April 2020.Other requests for this document shall be referred to Commander, Naval Surface Warfare Center, Philadelphia Division, 5001 South Broad Street, Building 4, Philadelphia, PA 19112.
Blocks 10, 11, 12, & 13: Following induction of the power turbine for complete overhaul, the contractor shall provide weekly status reports in the contractor's format. This report shall be submitted to NSWCPD Code 423 and the COR.
Block 14: Submit via electronic mail in a digital format that can be read by Microsoft Office 2010 applications (or earlier) or Adobe PDF applications.
group:
total_price:
prep_name:
line_item: 0002 exhibit: A xtdp: Off xtm: Off othercat: MGMT system: LM2500 Power Turbine ctr_no: TBD contr: TBD remarksb:
Page2: 2
Reset:
2018-03-15T14:24:53-0400
MCFETRIDGE.ERIC.M.1245996094
prep_date:
app_by:
2020-04-07T11:52:44-0400
DESHMUKH.DESIREE.1241432439
app_date:
Page: 1 of_pages: 2 app: Adobe Professional 8.0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A001 title: Incoming Inspection Summary Report sub: Incoming Inspection Summary Report auth: DI-QCIC-80376A ref: SOW, Para. 4.1 req_ofc: NSWCPD C/423 dd250: LT appcode: N/A dist: C* freq: ASREQ asof: See Blk 16 firstsub: See Blk 16 subsub: ASREQ addressee1: PCO draft1: 0 reg1: 1 repro1:
addressee2: TPOC draft2: 0 reg2: 1 repro2:
addressee3: COR draft3: 0 reg3: 1 repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 total_reg: 3 total_repro: 0 remarks: Block 9: Distribution Statement C. Distribution authorized to U.S. Government Agencies and their contractors for administrative and operational use, 3 April 2020.Other requests for this document shall be referred to Commander, Naval Surface Warfare Center, Philadelphia Division, 5001 South Broad Street, Building 4, Philadelphia, PA 19112.
Blocks 10,11,12,13: 1. Within five (5) working days after receipt of the US Navy LM2500 PTA, the contractor shall contact NSWCPD Code 423 and the COR, to provide the serial number of the PTA, and physical condition of the shipping container. 2. If the shipping container is unable to hold the nitrogen charge when the container is received, or at any other time when the power turbine is stored in the shipping container, the contractor shall notify NSWCPD Code 423 and the COR within two (2) working days. 3. Within five (5) calendar days of container opening and receipt inspection of the US Navy LM2500 PTA, the repair activity shall contact NSWCPD Code 423 and the COR to report all parts/components that are missing, damaged or cannibalized.
Block 14: Submit via electronic mail in a digital format that can be read by Microsoft Office 2010 applications (or earlier) or Adobe PDF applications.
group:
total_price:
prep_name:
line_item: 0002 exhibit: A xtdp: Off xtm: Off othercat: QCIC system: LM2500 Power Turbine ctr_no: TBD contr: TBD remarksb:
Page2: 2
Reset:
2018-03-15T14:21:27-0400
MCFETRIDGE.ERIC.M.1245996094
prep_date:
app_by:
2020-04-07T08:33:25-0400
DESHMUKH.DESIREE.1241432439
app_date:
Page: 1 of_pages: 2 app: Adobe Professional 8.0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A007 title: Counterfeit Prevention Plan sub: Counterfeit Prevention Plan auth: DI-MISC-81832 ref: SOW Section 4.7 req_ofc: NSWCPD C/423 dd250: DD appcode: A dist: D* freq: SEE BLK 16 asof: SEE BLK 16 firstsub: SEE BLK 16 subsub: SEE BLK 16 addressee1: PCO draft1: 0 reg1: 1 repro1:
addressee2: TPOC draft2: 0 reg2: 1 repro2:
addressee3: COR draft3: 0 reg3: 1 repro3:
addressee4: Other (as needed) draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 total_reg: 3 total_repro: 0 remarks: Block 4: Contractor’s format is acceptable. The contractor shall develop a Counterfeit Prevention Plan using ISO09001 Quality Standards as a guide.
Blocks 8 and 10: Allow 45 days for Government approval/disapproval. Resubmittals, if required, shall be submitted NLT 60 days after receipt of Government comments.
Block 9: Distribution Statement D. Distribution authorized to the U.S. Department of Defense and U.S. DoD contractors only. Critical Technology: (30 Jan 2020). Other requests for this document shall be referred to Commander, Naval Surface Warfare Center, Philadelphia Division, 5001 South Broad Street, Building 4, Philadelphia, PA 19112.
Block 12: Initial submittal 90 days after contract award. Final submission shall be 90 days prior to Milestone C.
Block 13: Significant revisions shall be submitted 60 days after completion of revisions and submittals shall continue throughout the period of performance.
Block 14: Submit via electronic mail in a digital format compatible with Adobe Acrobat Document Format (PDF) and Microsoft Office 2000 and sent to the PCO (christie.colaianni@navy.mil) and COR, group:
total_price:
prep_name:
line_item: 0002 exhibit: A xtdp: Off xtm: Off othercat: MISC system: LM2500 Power Turbine ctr_no: TBD contr: TBD remarksb: Intentionally left blank
Page2:
Reset:
2020-05-27T12:18:23-0400
MCFETRIDGE.ERIC.M.1245996094
prep_date:
app_by:
2020-04-07T11:58:25-0400
DESHMUKH.DESIREE.1241432439
app_date:
Page:
of_pages:
app: Adobe Professional 8.0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A008 title: TECHNICAL REPORT STUDY-SERVICES sub: REPAIR TURN AROUND TIME (RTAT) REPORT auth: DI-MISC-80508B ref: SOW, Para. 4.8 req_ofc: NSWCPD C/423 dd250: LT appcode: N/A dist: D freq: ASREQ asof: See Blk 16 firstsub: ASREQ subsub: ASREQ addressee1: PCO draft1: 0 reg1: 1 repro1:
addressee2: TPOC draft2: 0 reg2: 1 repro2:
addressee3: COR draft3: 0 reg3: 1 repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 total_reg: 3 total_repro: 0 remarks: BLK 4: The Contractor shall provide a report detailing the following information, as a minimum, to be provided in a Microsoft Project or similar format:
A. Repair Turn-Around-Time (RTAT) I. The contractor shall provide a detailed step-by-step timeline inclusive of critical milestones for a typical US Navy LM2500 PTA.
II. The timeline shall be broken out by each step in the pre-repair and repair process and have a turn time associated with each step in the process.
III. For each step in the repair process, also detail what resources are required to complete each step (material, personnel, machinery, GFM, etc.). For material, typical quantities must be noted. For personnel, labor categories and expected hours for each must be noted.
IV. Each turn-time listed must reflect two scenarios: 1) what the turn time would be if the vendor had no other work in their shop (OPTIMISTIC); and, 2) what the turn time would be accounting for the typical outside workload the vendor experiences (REALISTIC).
V. The contractor shall point out what steps in the pre-repair and/or repair process are considered bottlenecks in the repair process, including their assessment of the cause for such bottlenecks typically experienced.
B. Work-In-Progress (WIP) I. The contractor shall provide a detailed statement on what their facility’s typical work-in-progress has been over the previous three years.
BLK 9: Distribution Statement D. Distribution authorized to U.S. Department of Defense and U.S. DoD contractors only for administrative and operational use, 6 August 2015.
Other requests for this document shall be referred to Commander, Naval Surface Warfare Center, Philadelphia Division, 5001 South Broad Street, Building 4, Philadelphia, PA 19112.
group:
total_price:
prep_name:
line_item: 0002 exhibit: A xtdp: Off xtm: Off othercat: MISC system: LM2500 Gas Generator ctr_no: TBD contr: TBD remarksb:
Page2: 2
Reset:
2020-02-10T12:54:37-0500
MCFETRIDGE.ERIC.M.1245996094
prep_date:
app_by:
2020-02-10T16:19:28-0500
SELPH.JOSEPH.1257367882
app_date:
Page: 1 of_pages: 2 app: Adobe Professional 8.0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A009 title: Government Furnished Material (GFM) by National Stock Number sub: Reporting of Government Inventory Held under Product Support Contractual Arrangements auth: DI-ILSS-80727 ref: SOW Paragraph 4.9 req_ofc: NSWCPD Code 423 dd250: LT appcode: N/A dist: B freq: See Blk 16 asof: See Blk 16 firstsub: See Blk 16 subsub: ASREQ addressee1: COR draft1: 0 reg1: 1 repro1:
addressee2: Tech POC draft2: 0 reg2: 1 repro2:
addressee3: PCO draft3: 0 reg3: 1 repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 total_reg: 3 total_repro: 0 remarks: Tailoring instructions for DI-ILSS-80727:
(A) Block 10.1. Contractor shall deliver the information in digital format that can be read by Microsoft Office 2010 applications (or earlier) and/or Adobe PDF applications.
(B) Block 10.2.e. Change to read: "Inventory requirements (e.g. usage rates) that the Contractor establishes to achieve the performance required by the contract."
(C) Block 10.2.h. Change to read: "Existing Government inventory that the Contractor manages against these requirements."
(D) Block 10.2.i. Change to read: "Existing Government inventory that the Contractor holds in excess of these requirements."
(E) Block 10.2.j. After the word, "position", add: "and submit a written plan for the buying DoD Component's approval that proposes actions for the reuse or disposal of Government inventory identified by the Contractor as access to meeting contract requirements."
Block 9: Distribution Statement B. Distribution authorized to U.S. Government agencies only for contractor performance evaluation, 6 August 2015. Other requests for this document shall be referred to Commander, Naval Surface Warfare Center, Philadelphia Division, 5001 S. Broad Street, Building 4, Philadelphia, PA 19112.
Block 10: Submit information as GFM is received by Contractor.
Block 11: Date shall be as of the date of inspection of GFM; Contractor shall submit reports within 15 days of inspection; all GFM shall be inspected within 30 days from receipt.
Block 12: Within fifteen (15) days after inspection of GFM.
Block 14: Submit via electronic mail in a digital format that can be read by Microsoft Office 2010 applications (or earlier) or Adobe PDF applications.
Email address for TPOC submission shall be as follows, unless otherwise directed by the Government: eric.mcfetridge@navy.mil group:
total_price:
prep_name:
line_item: 0002 exhibit: A xtdp: Off xtm: Off othercat: ILSS system: LM2500 Power Turbine ctr_no: TBD contr: TBD remarksb:
Page2:
Reset:
2020-05-27T12:29:46-0400
MCFETRIDGE.ERIC.M.1245996094
prep_date:
app_by:
2020-05-28T19:03:49-0400
DESHMUKH.DESIREE.1241432439
app_date: 5/28/20
Page:
of_pages:
app: Adobe Professional 8.0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A010 title: Government Property Inventory Report sub: Government Furnished Property Inventory Baseline Report auth: DI-MGMT-80441C ref: SOW Paragraph 4.10 req_ofc: NSWCPD Code 423 dd250: LT appcode: N/A dist: B freq: See Blk 16 asof: See Blk 16 firstsub: See Blk 16 subsub: ASREQ addressee1: COR draft1: 0 reg1: 1 repro1:
addressee2: Tech POC draft2: 0 reg2: 1 repro2:
addressee3: PCO draft3: 0 reg3: 1 repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 total_reg: 3 total_repro: 0 remarks: Tailoring instructions for DI-MGMT-81441C:
(A) General. Delete any reference to Contractor Acquired Property. Abbreviations are not allowed. Acronyms may be used if a term is defined on first usage.
(B) Block 2.B. Change to read: "Manufacturer Commercial and Government Entity (CAGE) Code."
(C) Block 2.E. Delete.
(D) Block 2.H. Delete.
(E) Block 2.N. Delete.
(F) Block 2.O. Delete.
(G) Block 2.Q. Delete.
(H) Block 2.R. Delete.
(I) Block 2.S. Delete.
(J) Block 2.T. Delete.
(K) Block 2.V. Delete.
(L) Block 2.W. Change to read: "Condition of Property."
Block 9: Distribution Statement B. Distribution authorized to U.S. Government agencies only for contractor performance evaluation, 6 August 2015. Other requests for this document shall be referred to Commander, Naval Surface Warfare Center, Philadelphia Division, 5001 S. Broad Street, Building 4, Philadelphia, PA 19112.
Block 10: Submit information as GFM is received by Contractor.
Block 11: Date shall be as of the date of inspection of GFM; Contractor shall submit reports within 15 days of inspection; all GFM shall be inspected within 30 days of receipt.
Block 12: Within fifteen (15) days after inspection of GFM.
Block 14: Submit via electronic mail in a digital format that can be read by Microsoft Office 2010 applications (or earlier) or Adobe PDF applications.
Email address for TPOC submission shall be as follows: eric.mcfetridge@navy.mil group:
total_price:
prep_name:
line_item: 0002 exhibit: A xtdp: Off xtm: Off othercat: MGMT system: LM2500 Power Turbine ctr_no: TBD contr: TBD remarksb:
Page2:
Reset:
2020-05-27T12:33:24-0400
MCFETRIDGE.ERIC.M.1245996094
prep_date:
app_by:
2020-05-28T19:02:56-0400
DESHMUKH.DESIREE.1241432439
app_date: 5/28/20
Page:
of_pages:
app: Adobe Professional 8.0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A002 title: Incoming Inspection Summary Report sub: Disassembly Inspection Report (DIR) auth: DI-QCIC-80376A ref: SOW, Para. 4.2 req_ofc: NSWCPD C/423 dd250: LT appcode: N/A dist: C* freq: ASREQ asof: See Blk 16 firstsub: See Blk 16 subsub: ASREQ addressee1: PCO draft1: 0 reg1: 1 repro1:
addressee2: TPOC draft2: 0 reg2: 1 repro2:
addressee3: COR draft3: 0 reg3: 1 repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 total_reg: 3 total_repro: 0 remarks: Block 4:The contractor shall compile a DIR containing the below data elements in the contractor’s format. At a minimum, the DIR shall contain the following data elements :
All incoming inspection results with teardown inspection records.
All inspection data and damage reports.
PTA serial number and selected component serial and part numbers.
Illustration and pictures of damage found.
List of all technical directives, mandatory upgrades and service bulletins pending.
Metallurgical evaluation and laboratory reports.
All parts, components missing.
Condition (Serviceable / Not Serviceable) or Applicability (PTA) Replace / Rework Findings Summary (FOD, MFG design, etc) Conditions found (dimensions vs. spec) Assembly nomenclature / part number Inspection and discrepancies found Assembly manufacturer Part number Removal date
Removal location (installed location) CONCLUSIONS: Removal reason, Summary, Engineering comments
Block 9: Distribution Statement C. Distribution authorized to U.S. Government Agencies and their contractors for administrative and operational use, 3 April 2020.Other requests for this document shall be referred to Commander, Naval Surface Warfare Center, Philadelphia Division, 5001 South Broad Street, Building 4, Philadelphia, PA 19112.
Blocks 10, 11, 12, 13: Within forty five (45) working days after induction of the US Navy LM2500 PTA, the contractor shall provide an "initial" DIR to NSWCPD Code 423 and the COR to report all parts/components inspection results including those parts that have failed inspection. Within seventy five (75) working days after induction the contractor shall provide a "complete and final" DIR to NSWCPD Code 423 and the COR to report all final parts/components inspection results including findings from outsourced vendors.
Block 14: Submit via electronic mail in a digital format that can be read by Microsoft Office 2010 applications (or earlier) or Adobe PDF applications.
group:
total_price:
prep_name:
line_item: 0002 exhibit: A xtdp: Off xtm: Off othercat: QCIC system: LM2500 Power Turbine ctr_no: TBD contr: TBD remarksb:
Page2: 2
Reset:
2018-03-15T14:22:29-0400
MCFETRIDGE.ERIC.M.1245996094
prep_date:
app_by:
2020-04-07T08:37:29-0400
DESHMUKH.DESIREE.1241432439
app_date:
Page: 1 of_pages: 2 app: Adobe Professional 8.0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A003 title: Overhaul Repair Report sub: Overhaul Repair Report auth: DI-ILSS-80755 ref: SOW, Para. 4.3 req_ofc: NSWCPD C/423 dd250: LT appcode: N/A dist: C* freq: ASREQ asof: See Blk 16 firstsub: See Blk 16 subsub: ASREQ addressee1: PCO draft1: 0 reg1: 1 repro1:
addressee2: TPOC draft2: 0 reg2: 1 repro2:
addressee3: COR draft3: 0 reg3: 1 repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 total_reg: 3 total_repro: 0 remarks:
Block 4: This report at a minimum shall contain:
-Table of contents.
-All incoming inspection results with teardown inspection records.
-All inspection data and damage reports.
-Total overhaul work scope.
-Provide a condition report showing the technical manual figure and item, part number, description, quantity, disposition, and details of the part condition and action taken to correct. A photographic disassembly and condition report of the PT at induction and all sub-assemblies during teardown and inspection. Include photographs of components when required to show damage or unusual occurrences in the appropriate sub-assembly condition report.
-The condition reports shall be segregated by PT sub-assembly as follows:
Turbine Rotor Assembly Stator Case Assembly Turbine Rear Frame
-A list of all parts replaced and/or upgraded (e.g. part numbers, serial numbers and work performed).
-Metallurgical evaluations and laboratory reports.
-Assembly records, a detailed step-by-step record of PT assembly.
-Test records from all testing performed.
-List of all technical directives, and industrial service bulletins incorporated.
-All authorized deviations from US Navy LM2500 depot level technical manuals.
group:
total_price:
prep_name:
line_item: 0002 exhibit: A xtdp: Off xtm: Off othercat: ILSS system: LM2500 Power Turbine ctr_no: TBD contr: TBD remarksb: -Final invoice including cost profile by sub-assembly.
-Method of shipment and location shipped to.
-Include pre-canning photographs of PT (front/profile/rear).
Block 9: Distribution Statement C. Distribution authorized to U.S. Government Agencies and their contractors for administrative and operational use, 3 April 2020.Other requests for this document shall be referred to Commander, Naval Surface Warfare Center, Philadelphia Division, 5001 South Broad Street, Building 4, Philadelphia, PA 19112.
Blocks 10, 11, 12, 13: The contractor shall compile a PT overhaul report in the contractor’s format. This report shall be submitted to NSWCPD Code 423 and the COR within sixty (60) days after completion of overhaul.
Block 14: Submit via electronic mail in a digital format that can be read by Microsoft Office 2010 applications (or earlier) or Adobe PDF applications.
Page2: 2
Reset:
2018-03-15T14:23:03-0400
MCFETRIDGE.ERIC.M.1245996094
prep_date:
app_by:
2020-04-07T11:39:39-0400
DESHMUKH.DESIREE.1241432439
app_date:
Page: 1 of_pages: 2 app: Adobe Professional 8.0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government thos
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .