N6449823R4044_Exhibit B_CDRL A002_LM2500 SST OH SIGNED.pdf
PDF 239 KB Posted
- Solicitation number
- N6449823R4044
About this file
This document is a Contract Data Requirements List (CDRL) outlining deliverables for a commercial depot level overhaul of LM2500 Single Shank Turbine Gas Generator Assemblies. Key deliverables include an initial and final Disassembly Inspection Report provided to Naval Sea Systems Command Code 423 and the Contracting Officer's Representative within seventy-five and one hundred thirty working days after container opening. The final report must incorporate all inspection results and findings from outsourced contractors. It should include gas generator serial numbers and component part numbers, illustrations and pictures of any damage found, borescope inspection reports if performed, pending technical directives and upgrades, and lists of missing and unserviceable parts. Pricing is to be estimated according to four groups of data item development effort. The Navy seeks these overhaul services under solicitation N6449823R4044 for rolling admissions.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
| data_item: A002 |
| title: Disassembly Inspection Report (DIR) |
| sub: Disassembly Inspection Report (DIR) |
| auth: DI-QCIC-80376A |
| ref: SOW, Para. C.3.10 |
| req_ofc: NSWCPD C/423 |
| dd250: DD |
| appcode: N/A |
| dist: C |
| freq: As Required |
| asof: See Blk 16 |
| firstsub: See Blk 16 |
| subsub: As Required |
| addressee1: PCO |
| draft1: 0 |
| reg1: 1 |
| repro1: |
| addressee2: TPOC |
| draft2: 0 |
| reg2: 1 |
| repro2: |
| addressee3: COR |
| draft3: 0 |
| reg3: 1 |
| repro3: |
| addressee4: Other (as needed) |
| draft4: |
| reg4: |
| repro4: |
| addressee5: |
| draft5: |
| reg5: |
| repro5: |
| addressee6: |
| draft6: |
| reg6: |
| repro6: |
| addressee7: |
| draft7: |
| reg7: |
| repro7: |
| addressee8: |
| draft8: |
| reg8: |
| repro8: |
| addressee9: |
| draft9: |
| reg9: |
| repro9: |
| addressee10: |
| draft10: |
| reg10: |
| repro10: |
| addressee11: |
| draft11: |
| reg11: |
| repro11: |
| addressee12: |
| draft12: |
| reg12: |
| repro12: |
| addressee13: |
| draft13: |
| reg13: |
| repro13: |
| addressee14: |
| draft14: |
| reg14: |
| repro14: |
| addressee15: |
| draft15: |
| reg15: |
| repro15: |
| addressee16: |
| draft16: |
| reg16: |
| repro16: |
| addressee17: |
| draft17: |
| reg17: |
| repro17: |
| addressee18: |
| draft18: |
| reg18: |
| repro18: |
| addressee19: |
| draft19: |
| reg19: |
| repro19: |
| addressee20: |
| draft20: |
| reg20: |
| repro20: |
| addressee21: |
| draft21: |
| reg21: |
| repro21: |
| addressee22: |
| draft22: |
| reg22: |
| repro22: |
| addressee23: |
| draft23: |
| reg23: |
| repro23: |
| addressee24: |
| draft24: |
| reg24: |
| repro24: |
| addressee25: |
| draft25: |
| reg25: |
| repro25: |
| addressee26: |
| draft26: |
| reg26: |
| repro26: |
| addressee27: |
| draft27: |
| reg27: |
| repro27: |
| addressee28: |
| draft28: |
| reg28: |
| repro28: |
| addressee29: |
| draft29: |
| reg29: |
| repro29: |
| addressee30: |
| draft30: |
| reg30: |
| repro30: |
| addressee31: |
| draft31: |
| reg31: |
| repro31: |
| addressee32: |
| draft32: |
| reg32: |
| repro32: |
| addressee33: |
| draft33: |
| reg33: |
| repro33: |
| addressee34: |
| draft34: |
| reg34: |
| repro34: |
| addressee35: |
| draft35: |
| reg35: |
| repro35: |
| addressee36: |
| draft36: |
| reg36: |
| repro36: |
| addressee37: |
| draft37: |
| reg37: |
| repro37: |
| addressee38: |
| draft38: |
| reg38x: |
| repro38: |
| total_draft: 0 |
| total_reg: 3 |
| total_repro: 0 |
| remarks: BLK 4: Within seventy-five (75) working days of container opening, the Contractor shall provide an initial DIR to NSWCPD Code 423 and the COR IAW CDRL A002. Within one hundred thirty (130) working days of container opening, the Contractor shall provide a complete and final DIR to NSWCPD Code 423 and the COR IAW CDRL A002 that includes all final parts/components and inspection results to include final findings from outsourced Contractors. The Final DIR shall include any and all requested Over and Above (O&A) IAW DFARS 252.217- 7028. O&A not included on the Final DIR will not be accepted. O&A shall be submitted to the PCO, COR, and Contract Specialist via O&A Workbook (Attachment # 4). |
At a minimum, the DIR shall contain the following data elements:
1. All incoming inspection results with teardown inspection records
2. All inspection data and damage reports
3. SST GG serial number and selected component serial and part numbers
4. Illustration and pictures of damage found
5. Borescope inspection report(s) (if performed by the repair activity)
6. List of all technical directives, mandatory upgrades and service bulletins pending
7. All authorized deviations from US Navy LM2500 depot level technical manuals
8. Metallurgical evaluation and laboratory reports
9. All parts, components missing
10. Condition (Serviceable / Not Serviceable) or Applicability (SST GG) Replace / Rework
11. Findings Summary (FOD, MFG design, etc)
12. Conditions found (dimensions vs. spec)
13. Assembly nomenclature / part number
14. Accessories and gearboxes
15. Assembly model (Single Shank), part number and manufacturer
16. Removal date
17. Removal location (installed location)
18. CONCLUSIONS: Removal reason, Summary, Engineering comments
| group: | |
| total_price: | |
| prep_name: | |
| line_item: 0005 | |
| exhibit: A | |
| xtdp: Off | |
| xtm: Off | |
| othercat: QCIC | |
| system: LM2500 Gas Generator | |
| ctr_no: TBD | |
| contr: TBD | |
| remarksb: Intentionally left blank | |
| Page2: | |
| Reset: | |
| 2021-11-03T10:21:50-0400 | |
| MCFETRIDGE.ERIC.M.1245996094 |
| prep_date: |
| app_by: |
| app_date: |
| Page: |
| of_pages: |
| app: Adobe Professional 8.0 |
File details come from the government source that posted it. Updated .