QA Responses 3.7.23 Touch Labor.docx

DOCX document 13 KB Posted

Attached to
NSWCPD Touch Labor Services Federal contract opportunity
Solicitation number
N6449823R4026
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to NSWCPD Touch Labor Services, newest first.
File Type Posted
N6449823R4026 Amendment 0003.pdf PDF
N6449823R4026 Amendment 00002.pdf PDF
QA Responses 2.21.23 Touch Labor.docx DOCX document
M6449823R4026 Amendment 00001.pdf PDF
CDRL A019 - Project Specific QA Plan_MD.pdf PDF
CDRL A016 - Quality Assurance-Quality Control Manuals_MD.pdf PDF
CDRL A017 - Vendor Manuals for Purchased Equipment_MD.pdf PDF
CDRL A012 - Welding Proformance Qualifications (WPQ)_MD.pdf PDF
CDRL A020 - Test Documentation_MD.pdf PDF
CDRL A002 - Contractor Personnel Roster_MD.pdf PDF
CDRL A010 - Welding Procedure Specification (WPS)_MD.pdf PDF
CDRL A024 - Special Support Tools List_MD.pdf PDF
CDRL A032 - Repairable Item Inspection Report_MD.pdf PDF
CDRL A031 - Maintenance Service Report_MD.pdf PDF
CDRL A007 - Final Commissioning Acceptance Test Report_MD.pdf PDF
CDRL A025 - Acceptance Test Report_MD.pdf PDF
CDRL A021 - Certificate of Compliance_MD.pdf PDF
CDRL A003 - GovtPropertyInventoryReport_MD.pdf PDF
CDRL A001 - Contract Status Report_MD.pdf PDF
Attachment 6 - Accounting System Survey.pdf PDF
CDRL A029 - Maintenance Calibration Logs_MD.pdf PDF
CDRL A008 - Material Safety Data Sheet_MD.pdf PDF
CDRL A022 - Test Procedure_MD.pdf PDF
CDRL A030 - Contractor Maintenance Program Plan_MD.pdf PDF
CDRL A026 - Performance Analysis Report_MD.pdf PDF
CDRL A014 - Non-Destructive Test Reports_MD.pdf PDF
CDRL A033 - GFM by NSN_MD.pdf PDF
CDRL A015 - CONTRACTORS SAFETY PLAN_MD.pdf PDF
CDRL A011 - Welding Procedure Qualification Records (PQR)_MD.pdf PDF
CDRL A035 - GFP Inventory Report (Final).pdf PDF
CDRL A004 - Small Business Utilization Report_MD.pdf PDF
Attachment 1- Cost Summary Template.xlsx XLSX spreadsheet
CDRL A027 - Test Plan_MD.pdf PDF
CDRL A018 - Overall CTF QA Program Plan_MD.pdf PDF
CDRL A028 - Operational Report_MD.pdf PDF
CDRL A005 - Test-Inspection Report_MD.pdf PDF
CDRL A009 - Vendor Warranty for Purchased Equipment_MD.pdf PDF
CDRL A023 - Special Support Tools List_MD.pdf PDF
CDRL A013 - Non-Destructive Test Procedures_MD.pdf PDF
CDRL A006 - POAM Schedule_MD.pdf PDF
CDRL A034 - Certification of Competency_MD.pdf PDF
Attachment 4 - GFP.xlsx XLSX spreadsheet
Attachment 2 - DD254.pdf PDF
Attachment 3 - List of Key Personnel.docx DOCX document
Attachment 5 - Supporting Cost Data.xlsx XLSX spreadsheet
N6449823R4026 RFP.pdf PDF
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation N6449823R4026 Q&A

1. Q: The solicitation states, “A pass through rate not exceeding 8% may be proposed.” Can the pass-through fee on subcontracted labor be adjusted to match the current G&A markup used on an ODC CLIN?

A: For further guidance, please refer to RFP Page 5 & 6 Clause B-215-H001 MAXIMUM RATES (NAVSEA) (OCT 2018) and RFP Page 135 Pass Through.

1. Can the hourly fee calculation on pass through subcontracted labor be divided by only the subcontractor proposed costs?

A: The fee/hour is computed by taking the total fee for both Prime Fee on Prime Labor and Prime Fee on Sub Labor then dividing that by the total labor hours of both Prime and Sub. For further guidance, please refer to RFP Page 135 Pass Through.

1. The solicitation lists Engineering Technician VI with an eCraft code of 30082 but should be 30086 (same as current contract). 30082 is Engineering Technician II. Does this need to be corrected?

A: Amendment 00002 has been posted to correct this typo in section 12.3 of the SOW. The value in the table should be eCraft code 30086 for Engineering Technician VI.

1. Can LOE hours be adjusted, i.e.: Rhoads would like to propose converting a portion of the Maintenance Electrician hours to other efforts such as Millwright and Electrician.

A: Yes, LOE hours can be adjusted.

1. Is there a limit to the number of Key Personnel that can be added to a labor category?

A: As long as the existing LOE for that LCAT has sufficient hours to cover multiple key personnel performing the role. In addition, if they wanted to increase the LOE for a particular position, justification would need to be provided.