AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Provide questions and answ ers as a result of the site visit on 28 January 2021.
2 . Add a sentence to the end of SOW Paragraph 1.5 Execution of Work.
3. Closing Date for the receipt of proposals remains unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 19
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Feb-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6449821R4026
X 9B. DATED (SEE ITEM 11)
20-Jan-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Feb-2021
CODE
NAVAL SURFACE WARFARE CENTER PHILA
CODE 0222, LINDA M. DOBBS
267-990-6017, LINDA.M.DOBBS@NAVY.MIL
5001 SOUTH BROAD STREET
PHILADELPHIA PA 19112
N64498 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6449821R4026
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
Q & A FROM 28 JAN SITE VISIT
1. Is it the Government’s intention to eliminate the existing Excess Pressure Pumps for all the existing systems listed in the RFP?
RESPONSE: All excess pressure pumps listed on Table 2.2 in the Statement of Work require removal.
2. Follow up to question #1. If yes! Is it the governments intent to also remove all the existing Excess Pressure switches & to remove the points for the fire alarm program?
RESPONSE: Yes. Removal of excess pressure pumps shall include excess pressure switches and associated alarm points in the Fire Alarm Control Panel. Existing low pressure switches to remain.
3. Follow up to question #2. If Yes! Can the old Modules; from the excess pressure switches, be used to monitor the newly installed Tamper Switches?
RESPONSE: If permitted by NFPA 70 and NFPA 72, reuse of existing monitoring modules in the Fire Alarm Control Panel and field is acceptable to the Government. However, the Contractor shall be responsible for verifying compatibility with new valve tamper switches prior to ordering any material. Additionally, each individual valve tamper switch shall have its own unique point in the fire alarm system and may not be terminated on a common monitoring module with other valve tamper switches.
4. Is it the Government’s intention to install new tamper switches on only newly installed shut-off valves (OS&Y/Butterfly) on the risers listed in the scope, or all newly installed valves & existing OS&Y valves, including valves on risers not listed in the scope? i.e., PNBC Bldg. #4-There are (2) Dry risers that have OS&Y valves without tampers; (1) in North Mech. Rm. & (1) in South Mech. Also, there are (2) riser manifold OS&Y valves; (1) in each Mech. Rm.
RESPONSE: All valves listed in Table 2.2 of the Statement of Work require a tamper switch. Valves not indicated and listed on Table 2.2 do not require tamper switches and are not a part of this work.
5. RE: PNBC Bldg. #77L Riser #41-There is a relatively new Alarm Valve already installed at this location. Is it the governments intention to only remove the excess Pressure Pump & install a new shut-off valve with tamper at this location?
RESPONSE: Per Table 2.2 of the Statement of Work, Riser #41 in Bldg 77L does not require a new alarm check valve.
6. Is it the Government’s intention to maintain Water Motor Gong operations at all risers, listed in scope?
RESPONSE: All water gongs identified in Table 2.2 shall be removed and disposed of in accordance with all requirements detailed in the Statement of Work.
7. Is there a remedy; in the contract or needed; if existing shut-off &/or PIV valves, do not produce a positive shut down to a rise &/or bldg.?
RESPONSE: In the event that shut-off and/or Post Indicating Valve (PIV) does not provide an isolated condition such that riser repairs can begin, an alternative riser shall be repaired to prevent cost and schedule impacts to the Contractor and its subcontractors. The Contractor shall redirect their efforts to the next riser on the Project Schedule until the Government remedies any isolation issues. Any cost and/or schedule impacts due to an issue with isolating a riser must be brought to the attention of the Contracting Officer within 24 hours of identifying the impact.
8. In Bldg. #77L all the Risers have 360-degree loop installed before the alarm valve. Can it be removed & a straight vertical section of pipe be installed in its place, if possible?
RESPONSE: Piping loop configuration consisting of four (4) 90-degree bends (herein called “offset loop”) prior to the alarm check valves in Building 77L (on Risers 41, 42, 43, and 174) can be removed and replaced with straight vertical sections of piping. Historically, these piping offset loops were used to support backflow preventers which are no longer required due to upstream backflow prevention.
Where installed on the offset loop, the OS&Y isolation valves are still required but may be installed in-line with a new straight length of pipe. The contractor shall be responsible for all accessories and components as necessary for a complete and usable installation.
End Questions and Answers
The following sentence (IN RED) has been added to the end of SOW Paragraph 1.5 Execution of Work.
Where work on a riser or fire alarm component requires any utilities or building systems to be de-energized, that work shall be performed off duty hours from 1700-0500 Monday through Friday. This includes, but is not limited to, Heating, Ventilation, and Air Conditioning (HVAC) systems, pressurized piping systems, electrical panels and substations.
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The Issued By organization has changed from
NAVAL SURFACE WARFARE CENTER PHILA
CODE 0222, LINDA M. DOBBS
267-990-6017, LINDA.M.DOBBS@NAVY.MIL
5001 SOUTH BROAD STREET
PHILADELPHIA PA 19112
to
NAVAL SURFACE WARFARE CENTER PHILA
5001 SOUTH BROAD STREET
PHILADELPHIA PA 19112
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
STATEMENT OF WORK
BLDG 4, 77L, 77H, & 756 SPRINKLER RISER REPAIRS
STATEMENT OF WORK
1.0 SECTION 1: GENERAL
1.1 GENERAL DESCRIPTION: This Statement of Work (SOW) defines the requirements for repairs to multiple fire suppression system sprinkler risers located in Bldgs. 4, 77L, 77H, and 756 at the Philadelphia Naval Business Center (PNBC), Philadelphia, PA 19112 which are grouped into two Contract Line Items Numbers (CLINS) as detailed in the CLIN schedule. CLIN 0001 includes eleven (11) risers and OPTION CLIN 0002 includes five (5) risers. All sixteen (16) risers in the scope of this work are wet sprinkler systems. In general, work includes the replacement, installation, reconfiguration, and/or removal of alarm check valves, isolation valves, excess pressure pumps, water gongs and retard chambers, piping, drain lines, low-voltage alarm components, and trim piping components. At the completion of the work, the system shall be inspected and tested for proper operation. The Contractor shall provide all supervision, labor, material, equipment and supplies to perform the work. Refer to SOW Section 2 for a more detailed description of work to be performed.
1.2 SITE LOCATION: The work is located in Bldgs. 4, 77L, 77H, and 756 that are US Navy owned buildings occupied by the Naval Surface Warfare Center, Philadelphia Division (NSWCPD) at PNBC. See Attachment 1 for locations of buildings applicable to the work detailed herein. Building 4 is located at 5001 South Broad Street, Philadelphia, PA 19112. The building was originally constructed circa 1880 and underwent a major renovation circa 1980 that created useable space within the original structure commonly referred to as the “in-fill area.” Building 4 is 210,000 gross square feet and is occupied by about 1,000 personnel. Building 77L is located at 1000 Kitty Hawk Ave, Philadelphia PA 19112. The building was constructed in 1918 and is approximately 140,000 gross square feet. The primary use of the building is office space for research and engineering professionals. Building 77H is physically attached to Bldg. 77L and has a street address of 901 Admiral Peary Way, Philadelphia, PA 19112. The building was also constructed in 1918 with a total footprint of 170,814 gross square feet. The primary use of the building is Research, Development, Testing & Evaluation (RDT&E) laboratories and research and engineering office spaces. Building 756 is a building constructed in 1945 that is physically attached to Bldgs. 77H and 87 while simultaneously acting as a connector building between the two facilities. Building 756 has no separate street address from Bldg. 77H or 87 but is located at approximately 901 Admiral Peary Way, Philadelphia, PA 19112. The building is 13,614 gross square feet and primarily houses RDT&E laboratories and engineering office spaces.
1.3 GOVERNMENT TECHNICAL POINT OF CONTACT (TPOC): The TPOC is a representative of
NSWCPD, Code 02, Contracts Department and provides technical and administrative assistance to NSWCPD Code 02 related to the subject contract and work. All scheduling, coordination, and technical matters shall be through the NSWCPD TPOC.
1.4 GOVERNMENT FURNISHED UTILITIES: The Government shall furnish the following utility services for use as may be required for the work to be performed under the contract: electricity and potable water.
Government-furnished electricity may be used by the contractor unless contractor’s use adversely impacts a building’s electrical distribution system and equipment. Information concerning the location of existing outlets may be obtained from the NSWCPD TPOC. The Contractor shall provide and maintain, at its expense, the necessary service lines from existing Government outlets to the site of the work. Utilities specified above, utilities shall be furnished at no cost to the Contractor. In the event that the Government is unable to provide the required types of utilities, the Contractor shall, at its expense, arrange for the required utilities.
1.5 EXECUTION OF WORK: The Contractor’s and subcontractor(’s) work shall be performed during normal duty hours from 0700 to 1600, Monday through Friday (excluding Federal holidays). Any work requiring field painting of fire protection system components shall be performed outside of normal duty hours unless painting operations are located outside of the building. Off-hour work shall be coordinated with the NSWCPD TPOC.
All work shall be performed such that all risers are operational at the end of each shift. No riser system shall be remain inoperable outside of normal duty hours unless otherwise coordinated with the Government and approved by the TPOC. Work expected to result in a riser remaining offline and out-of-service beyond normal duty hours shall be coordinated with the TPOC a minimum of five (5) business days in advance. Unforeseen conditions that require a riser to remain offline and out-of-service outside of normal duty hours shall be coordinated with the TPOC as soon as possible to ensure a Government fire watch is made available. Where work on a riser or fire alarm component requires any utilities or building systems to be de-energized, that work shall be performed off duty hours from 1700-0500 Monday through Friday. This includes, but is not limited to, Heating, Ventilation, and Air Conditioning (HVAC) systems, pressurized piping systems, electrical panels and substations.
1.6 QUALITY CONTROL (QC) AND DAILY PRODUCTION REPORTS: The Contractor shall submit a
“Contractor Production Report” (Attachment 2) for each day work is performed for review and approval by the NSWCPD TPOC. This is required to account for each calendar day throughout the life of the Contract. The reporting of work shall be identified by terminology consistent with the work schedule. Enter pertinent information including directions received, problems encountered during work, work progress and delays, conflicts or errors in the drawings or specifications, field changes, safety hazards encountered, instructions given and corrective actions taken, a record of visitors to the work site, quality control problem areas, deviations from the QC Plan, work deficiencies encountered, and meetings held. The completed reports shall be submitted to the NSWCPD TPOC by 1000 the following day.
The Contractor shall maintain an adequate inspection system to ensure the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government upon request.
1.7 CLEAN-UP OF SITE: The Contractor shall maintain a clean and safe work site. All scrap materials, waste, and debris shall be removed from the work site on a daily basis. Contractors are not permitted to use Government dumpsters or other Contractor dumpsters for disposal of debris. Do not use building restrooms occupied by NSWCPD personnel for cleaning of equipment. The Contractor shall maintain the work site such that safe ingress and egress to and from, respectively, the building(s) is maintained for building occupants.
1.8 HOT WORK: For all hot work, a hot-work permit is required and a permit shall be obtained through the
Government Fire Inspector. Hot work includes, but is not limited to, burning, welding, cutting, brazing, grinding, using fire or spark-producing tools, or other work that produces a source of ignition. Requests for hot work permits shall be submitted to the NSWCPD TPOC with a 48-hour notice for review. Hot work in electrical- or mechanical-room space shall require a gas-free test prior to the Government fire inspector granting approval. In accordance with the Government fire inspector’s requirements, the Contractor shall perform this test daily. The Government fire inspector shall approve the instrument used. Fire extinguishers shall be provided by the Contractor at ALL locations where hot work is performed.
1.9 CONTRACTOR REQUIREMENTS FOR LIFT OPERATIONS: Contractor shall comply with the requirements of Naval Facilities Command (NAVFAC) P-307, Weight Handling Program Management, and Attachment 3, “Requirements for Contractor Lift Operations” for all work performed with cranes or other machines used to lift equipment or materials. Related to lift and weight-handling operations, contractor shall submit Machinery and Mobile Equipment Check List (Attachment 4) if required. NAVFAC P-307 is available for download at:
<https://www.navfac.navy.mil/navfac_worldwide/specialty_centers/ncc/about_us/resources/p307.html>
1.10 DUST AND ODOR CONTROL: Dust, air-borne particles, and odor resulting from prosecution of any definable feature of the work shall be controlled to prevent the spread of dust and odors to occupied portions of the site and to avoid creation of a nuisance in the surrounding area. Use of water shall not be permitted when it results in, or creates, hazardous or objectionable conditions, such as ice, flooding and pollution.
1.11 SUPERVISION AND CONTRACTOR PERSONNEL: The Contractor shall have at least one qualified supervisor, i.e., Project Superintendent, capable of reading, writing, and conversing fluently in the English language on the work site full-time during all working hours. The Project Superintendent is primarily responsible for managing and coordinating day-to-day production and schedule adherence on the project and shall be on-site anytime work is being performed. The Project Superintendent shall have at least ten (10) years of experience in jobs with similar scope, complexity, size, and cost. The Project Superintendent shall attend (either remotely or in-person) all meetings associated with this project. The Contractor shall provide personnel and subcontractors meeting the minimum requirements or qualifications stated in SOW Section 2, Detailed Description of Work, below. A minimum of two Contractor personnel are required to perform the functions of Project Superintendent, Site Safety and Health Officer (SSHO), and Contractor Quality Control System Manager (CQCSM); the latter two personnel responsibilities are described in Subsections 1.11.1 and 1.11.2 below:
1.11.1 Site Safety and Health Officer (SSHO): The contractor shall provide a Safety oversight team that includes a minimum of one (1) Competent Person at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO shall visit the work site daily, unless specified differently in the contract, to perform safety and occupational health management, surveillance, inspections, and safety enforcement for the Contractor. The SSHO shall review and approve of the Accident Prevention Plan and Activity Hazard Analysis submittals in conjunction with the CQCSM. The SSHO’s training, experience, and qualifications shall meet US Army Corps of Engineers (USACE) EM 385-1-1 Paragraph 01.A.17 and all associated sub-paragraphs. The SSHO shall attend (either remotely or in-person) all meetings associated with this project. The USACE EM 385-1-1 is available for download at:
https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/
1.11.2 Contractor Quality Control System Manager (CQCSM): Provide a CQCSM for the work site to manage and implement the Contractor Quality Control (CQC). The CQCSM shall be responsible for overall management of the Contractor Quality Control program and has the authority to act and give direction in all CQC matters for the Contractor. Duties shall involve oversight of the work ensuring compliance with the contract, submittal development and review prior to submission to the Government, leading quality control and partnering meetings (see SOW Paragraph 1.21), and oversight of inspection and tests associated with the contract work. The CQCSM shall have been regularly engaged in work and repair projects of similar type, size, and complexity that has included the major trades executing the work of this contract. The CQCSM shall be familiar with the requirements of EM 385-1-1 and have experience in the areas of hazard identification, safety compliance, and sustainability. The CQCSM may serve as the SSHO on this project; however, the CQCSM cannot perform the duties of Project Superintendent.
1.12 SUBMITTALS: The Contractor shall submit the pre-work submittals of Section 1.13 below within fourteen
(14) calendar days after award The Contracting Officer or NSWCPD TPOC may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections.
Each submittal shall be legible, well-organized, complete, and in sufficient detail to allow ready determination of compliance with contract requirements. Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only “FIO.”
1.12.1 Submittal Procedures: Both “G” and “FIO” submittals shall be transmitted to NSWCPD using a
Transmittal format. Provide submittals in electronic format, with the exception of material samples.
Compile the submittal file as a single, complete document, to include the ENG FORM 4025-R Transmittal Form available for download at: https://www.publications.usace.army.mil/USACE- Publications/Engineer-Forms/. Note that all instances of the “US Army Corp of Engineers” on the transmittal form shall be interpreted as “Naval Surface Warfare Center Philadelphia Division.” Name the electronic submittal file according to its contents. Use PDF as the electronic format, unless otherwise specified or directed by the Contracting Officer. Provide hard copies of submittals when requested by the Contracting Officer or NSWCPD TPOC. Submittals requiring Government approval shall be scheduled and made prior to the acquisition of the material or equipment covered thereby.
1.13 PRE-WORK SUBMITTALS:
1.13.1 Pre-work submittals marked with a “G” require Government approval prior to the Contractor's mobilization to the work-site location.
1.13.2 SECNAV Form 5512 – G: Prior to the start of work, the Contractor shall identify its personnel who will perform the work on-site and submit a corresponding SECNAV Form 5512 (Department of the Navy Local Population ID Card/Base Access Pass Registration) to the NSWCPD TPOC for submittal to NSWCPD’s Security Division. The contractor personnel on the 5512 forms will be vetted, and those personnel approved will be eligible for a Contractor ID badge. Read SOW Sections 3.6, 3.7, and
3.8 below for more information on access, security, contractor badges
1.13.3 Project Schedule - G: Prior to the start of work, the Contractor shall prepare and submit a work schedule to the NSWCPD TPOC. The schedule shall, at a minimum, show the contract award date, Notice to Proceed (NTP), mobilization, work activities, development and review periods for submittals, security access processing periods, material/equipment delivery, utility and system outages for each riser, on-site work, testing and inspections, closeout activities, demobilization, and the Contract Completion Date. The schedule shall be a time scaled bar chart, generated using scheduling software such as Microsoft Project, and shall have a clear critical path. Show the durations, successors and predecessors for each schedule activity. The schedule shall be kept current during this contract, reflecting actual activity progress and plan for completing the remaining work. Submit schedule updates at least monthly and provide a brief narrative with each update detailing the progress made, activities completed since the last update, upcoming activities in the following month, and any issues encountered.
1.13.4 Activity Hazard Analysis - G: in accordance with EM 385-1-1. See Attachment 5 for blank form and sample. See SOW paragraph 3.5.2 for additional information. The AHA shall cover all aspects of the work.
1.13.5 Accident Prevention Plan (APP) - G: The Contractor shall submit a site-specific abbreviated APP to the NSWCPD TPOC. The site-specific APP shall outline the job-specific hazards associated with the project scope and reflect the Contractor’s overall safety and health program. At a minimum, the plan shall meet the requirements of the abbreviated Accident Prevention Plan identified in the U. S. Army Corps of Engineers Safety and Health Requirements Manual, EM-385-1-1, Appendix A.
1.13.6 List of proposed Subcontractors – FIO: Provide the NSWCPD TPOC a list of all proposed subcontractors including address, telephone number, point of personal contact, qualifications, and certifications for the completion of project tasks stated in Section 2, Detailed Description of Work, below.
1.13.7 Shop Drawings – G: Provide the NSWCPD TPOC a set of shop drawings sized to the 22 in. by 34 in.
ANSI D standard. Shop drawings must conform to the requirements in NFPA 13 for working drawings. Shop drawings must be prepared by an individual that has obtained National Institute for Certification in Engineering Technologies (NICET), Automatic Sprinkler Systems, Level III certification. Drawings must include the following:
1.13.7.1 A descriptive index with drawings listed in sequence by number.
1.13.7.2 A legend sheet identifying device symbols, nomenclature, and conventions used in the package.
1.13.7.3 Plan and elevation views of each riser clearly showing the location and size of all devices and components of the riser including, but not limited to, isolation valves, check valves, trim piping, flow switches, and supervisory tamper switches. Plan and elevation views shall establish the clearances in each space for installation and maintenance of the components.
1.13.7.4 Provide manufacturer’s product data sheets for each new component with the shop drawing submittal. Index the product data sheets and reference the components within the drawings.
1.13.7.5 List model number information for riser system components to remain or be reinstalled (e.g.
flow switches).
1.14 ADDITIONAL SUBMITTALS: Contractor shall make other submittals as required in Sections 2 and 3 of this
Statement of Work, in addition to the pre-work submittals of Section 1.13 above. In general, the additional submittals of Section 2 are material samples, material information or cuts sheets, Safety Data Sheets (SDS), contractor qualifications, technical manuals, test plans, etc. Where otherwise not specified, all submittals other than pre-work submittals shall be submitted by the Contractor a minimum of fourteen (14) calendar days before the start of the particular task or definable feature of work (DFOW) to which the submittal is associated to provide sufficient Government review-and-approval time.
1.14.1 Warranty Information: Contractor shall submit warranty information guaranteeing all products and workmanship furnished hereunder free of defects for a minimum of one year. Submit upon completion of the project and prior to final payment.
1.14.2 Operation and Maintenance (O&M) Manuals: Upon completion of the project and prior to final payment, provide the TPOC with all manuals, technical data sheets, and documentations for new equipment. Provide one hard copy and a digital PDF of the O&M manual. Other manuals shall be provided for training as detailed in SOW Paragraph 2.4.
1.15 CONFINED SPACE: The Contractor shall comply with 29 CFR 1910.146 regarding permit-required confined space entry. The contractor shall provide a competent person to write all confined space permits.
1.16 HAZARDOUS MATERIAL: The Contractor is responsible for the handling, storage, removal, and disposal of hazardous material. Hazardous material waste shall be collected, stored, and disposed of in accordance with Navy, Federal, State, and Local requirements.
1.17 ELECTRICAL SAFETY: The contractor shall comply with Electrical Safety procedures in accordance with
29 CFR 1926. For additional information, refer to Chapter 12, of NAVSSESINST 5100.14G.
1.18 LOCK-OUT, TAG-OUT: The contractor shall comply with NSWCPD Lock-out/Tag-out procedures in accordance with Chapter 11 of NAVSSESINST 5100.14G and 29 CFR 1926. Only authorized NSWCPD personnel shall perform the Lock-Out and Tag-Out of Electrical, Mechanical, Piping, Machinery, or Equipment.
1.19 REFERENCES: The publications listed below form a part of this Statement of Work and are incorporated by reference. Provision and installation of the materials and components comprising this Statement of Work shall be in compliance with all applicable or relevant and appropriate requirements, including the following industry standards and regulations:
ASTM International (ASTM) ASTM E814 (2017) Standard Test Method for Fire Tests of Penetration Firestop Systems
Department of Defense (DoD) DoD Instruction 8500.01 (2019) Cybersecurity (available for download at https://www.esd.whs.mil/Directives/issuances/dodi/) DoD Instruction 8510.01 (2017) Risk Management Framework (RMF) for DoD Information Technology
(IT)
(available for download at https://www.esd.whs.mil/Directives/issuances/dodi/)
National Fire Protection Association (NFPA) NFPA 13 (2019) Standard for the Installation of Sprinkler Systems NFPA 25 (2017) Standard for the Inspection, Testing, and Maintenance of Water-Based Fire
Protection Systems NFPA 70 (2020) National Electric Code
NFPA 72 (2019) National Fire Alarm and Signaling Code
Unified Facilities Criteria (UFC) UFC 1-200-01 (2020) General Building Requirements UFC 3-600-01 (2020) Fire Protection Engineering for Facilities
Underwriters Laboratory (UL) UL 1479 (2015) Standard for Fire Tests of Penetration Firestops
1.20 LIST OF ATTACHMENTS: The following attachments form part of this Statement of Work and are incorporated by reference:
1.20.1 Attachment 1, Site Map –PNBC (1 page);
1.20.2 Attachment 2, Contractor Production Report (1 page);
1.20.3 Attachment 3, Requirements for Contractor Lift Operations (8 pages);
1.20.4 Attachment 4, Mobile Construction Equipment Checklist (2 pages);
1.20.5 Attachment 5, Activity Hazard Analysis (3 pages);
1.20.6 Attachment 6, Floorplans (4 pages);
1.20.7 Attachment 7, Existing Conditions Photographs (1 page) and,
1.20.8 Attachment 8, NSWCPD Entry Screening Assessment (1 page).
1.21 POST-AWARD MEETINGS: The Contractor shall attend post-award meetings including a preconstruction conference and bi-weekly progress meetings. The preconstruction conference shall include the Contractors’ Project Superintendent, Quality Control Manager, Site Safety and Health Officer, and a representative from each subcontractor. The preconstruction conference will be administered by the Government and will cover all aspects of the project including general overview of the scope of work, security and safety requirements, submittal processing, the Contractor’s project schedule, and system testing and final acceptance. Subsequent to the preconstruction conference, bi-weekly progress meetings shall be scheduled with the TPOC and shall be attended by the Contractor’s Project Superintendent, Quality Control Manager, Site Safety and Health Officer and administered by the Contractor’s Quality Control Manager. Topics discussed shall include work completed in the previous week, work planned on each riser for the following three weeks, inspection and testing discussions, safety, security, status updates for all submittals, issues encountered or resolved since the prior meeting, and other topics as necessary. Meetings may be held remotely via teleconference unless onsite attendance is required for a site visit.
2.0 SECTION 2: DETAILED DESCRIPTION
2.1 INTRODUCTION: The fire suppression sprinkler systems in Bldgs. 4, 77L, 77H, and 756 have riser components that are approaching the end of their service life or are no longer required and require replacement or removal, respectively. These components include alarm check valves, Outside Stem & Yolk (OS&Y) indicating valves, drain valves, piping components, excess pressure pumps, fire alarm monitoring and reporting devices, and trim piping associated with the risers. Additionally, components of the system require new fire alarm reporting components when modified to meet current code requirements. The location of each riser where work will be performed is shown on Attachment 6.
Award will be made on the total of CLIN 0001.
The Government reserves the unilateral right to award OPTION CLIN 0002 to the Contractor at the proposed price within 60 calendar days after the contract award or prior to demolition, whichever comes first. Award of OPTION CLIN 0002 extends the contract completion date by 30 calendar days upon award of the option for the work associated with CLIN 0002 only.
2.2 SPRINKLER RISER REPAIRS: The Contractor shall provide all labor, material, tools, equipment, supplies, and supervision to provide, replace, or demolish sprinkler riser components at sixteen (16) locations as detailed in Table 2.2 and below. Photographs representative of existing site conditions are provided in Attachment 7 and represent general conditions referenced in Table 2.2. All new work shall include all associated equipment, fittings, piping, etc., described or normally installed for the type of replacement for a complete and usable installation. All work and material shall comply with UFC 1-200-01, NFPA 13, NFPA 72, and UFC 3-600-01.
Material for valves, piping, fittings, and other components shall be listed and approved in accordance with NFPA 13 Annex A and shall be sized to match existing adjacent pipe work to-remain. Piping must be Schedule 40 black steel. All sprinkler work must be supervised onsite by a Fire Sprinkler Technician with a NICET Level III certification in fire suppression systems, regularly engaged in this type of work, and having completed three previous jobs with a similar complexity. All fire alarm work must be supervised on-site by a technician with a minimum of NICET Level II certification in fire alarm systems. The Contractor shall provide licensed electricians to perform all electrical work that is not exclusively communications hardware or circuits and electrical work shall comply with NFPA 70. The Contractor shall field verify all measurements and dimensions for materials prior to ordering material.
2.2.1 Wet Pipe Sprinklers - The Contractor shall:
2.2.1.1 Notify the TPOC a minimum of two (2) business day prior to draining each riser. Coordinate with TPOC to ensure each riser is isolated by the Government upstream of the riser isolation valve. The Contractor shall preserve and protect all existing structures, furniture, furnishings, equipment, and utilities at or near the work site; the Contractor shall repair any damage to those existing facilities caused in the performance of work in accordance with Federal Acquisition Regulation clause 52.236-9 “Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.”
2.2.1.2 Drain each sprinkler system. Contractor shall provide hoses as necessary to drain the sprinkler system to a suitable infiltration area or paved area where water can evaporate. Do not drain water directly into a storm water inlet. Do not drain water in areas in such a way that creates a hazard for pedestrians walking through common pathways. During weather conditions where freezing is possible, direct water away from pedestrian and vehicle pathways to the extent practical. Where not directed on pavement or gravel, drain onto a splash block or barrier to prevent soil erosion.
2.2.1.3 Provide temporary shoring or supports as necessary to perform all demolition and replacement work.
2.2.1.4 Clean, pretreat, and prime all new piping, fittings, and valves. Paint one coat of red-alkyd gloss enamel paint to all new piping, fittings, and valves. Repaint areas damaged during the performance of work. Painting activities must be performed outside of normal working hours or outside of the facility. Painting activities shall be located away from pedestrian pathways, building entrances, open windows, intake fans, and overhead roll-up doors.
2.2.1.5 Remove and replace alarm check valves, riser isolation valves, and associated trim and piping components for risers as indicated on Table 2.2. Provide trim components with pressure gauges and isolation valves on the upstream and downstream sides of the alarm check valve.
Where present, tie in trim piping to retard chambers and associated pressure switches as required where flow switches are not provided. Where existing flow alarm switches are present, remove retard chambers and provide shotgun check valves. Where existing pressure alarm switches are present, provide alarm check valves. New isolation valves shall be Outside Stem & Yolk (OS&Y) isolation valves.
2.2.1.6 Provide OS&Y valves with supervisory tamper switches. Tamper switches shall be installed and integrated into the existing Fire Alarm Control Panel (FACP). The Contractor shall be responsible for providing a complete installation including all necessary wiring, conduit, modules, programming, and testing to tie in the new tamper switches to the alarm circuit.
Existing alarm circuit may be tapped at the sprinkler riser. Work shall comply with NFPA 70 and NFPA 72. Provide conduit, junction boxes, covers, and couplings with factory applied red paint.
2.2.1.7 Remove and replace drain line valves as indicated on Table 2.2. New drain valve shall be a globe valve.
2.2.1.8 Remove and dispose of the existing riser mounted excess pressure pumps as indicated on Table 2.2.
2.2.1.9 Remove and dispose of water gongs and associated piping where indicated on Table 2.2. Fill wall openings remaining after pipe removal. Fire barriers shall be filled and sealed with an approved fire stop material in accordance with ASTM E814 or UL 1479. Remove retard chambers where flow switches are present and pressure switches are not required.
2.2.1.10 Tamper, flow, and pressure alarm switches shall be reinstalled and tested if removed during the course of work.
2.2.1.11 Refill sprinkler system and bleed all air from the system.
Table 2.2: Schedule of Sprinkler Riser Repairs by Building1
Building Riser
Description of Riser Location
Riser Pipe Diameter
Replace Alarm Check Valve
Remove Excess
Pressure Pump
Replace Isolation
Valve
Replace Drain Valve
Remove Water
Gong &
Provide Supervisory
Tamper Switch
Retard Chamber
4 1452 North Riser Room
4-inch X X X X X
4 1462 North Riser Room
6-inch X X X X X X
4 1472 South Riser Room
4-inch X X X X X
4 1482 South Riser Room
6-inch X X X X X X
4 1492 South Riser Room
4-inch X X X X X X
77L* 412 Southwest Mechanical Room
8-inch X X X X X
77L* 423 Northwest Mechanical Room
8-inch X X X X X X
77L* 432 Northeast Mechanical Room
8-inch X X X X X X
77L* 1743 Southeast Hallway
8-inch X X X X X X
77H 1652
Northeast Portion of Bay (adjacent to Column B-27)
8-inch X X X X X X
77H 1733 East Central Portion of Bay
6-inch X X X X X X
77H 2753 Northwest Portion of Bay
8-inch X X X X X X
77H 2772 Southeast Portion of Bay
8-inch X X X X X X
77H 402
Southwest Portion of Bay (adjacent to Column D-9)
8-inch X X X X X X
77H 1643
Northwest Portion of Bay (adjacent to riser 275)
6-inch X X X X X X
756* 2813 Northwest Hallway Closet
6-inch X X X X X X
Notes for Table 2.2:
(1) Above schedule is indicative of major definable features of work. Cells with an “X” indicate that task is required for the associated riser. Refer to the scope of work for all other work associated with this contract.
(2) Riser is located in an accessible location with minimal obstructions (refer to representative photographs provided in Statement of Work).
(3) Riser is located in an obstructed location (refer to representative photographs provided in Statement of Work).
* OPTION CLIN 0002
2.3 SYSTEM ACCEPTANCE INSPECTION AND TESTING:
2.3.1 Submit detailed test procedures, prepared and signed by the NICET Level III Fire Sprinkler Technician and reviewed by the Qualified Fire Protection Engineer a minimum of 30 calendar days prior to performing systems tests in accordance with NFPA 13. Detailed test procedures must list all components of the installed system. Test procedures must include sequence of testing, time estimate for each test, and sample test data forms. The test data forms must be in a check-off format (pass/fail with space to add data). The test procedures and accompanying test data forms must be used for the pre-Government testing and the Government final testing. Testing shall meet all requirements of NFPA 13 and shall include, but not be limited to, the following tests:
2.3.1.1 Main Drain Test – Each backflow prevention assembly must be tested as specified in NFPA
13. The Contractor must provide all equipment and instruments necessary to conduct a complete main drain test, including 2.5-inch diameter hoses, playpipe nozzles or flow diffusers, calibrated pressure gauges, and pitot tube gauge. The static and residual pressure readings must be recorded on the test certificate and the information placard at the sprinkler system riser.
2.3.1.2 Fire Alarm System Testing – Test each fire alarm component installed under this contract or affected by work in accordance with NFPA 72 Chapter 14. Provide documentation including a test plan and acceptance test results in accordance with NFPA Chapter 7. Test for alarm, supervisory, and trouble signals. Flow switches and pressure switches shall be tested through the flowing of water from the inspectors test valve.
2.3.1.3 Operating Test for Control Valves – All control valves shall be fully opened and fully closed under system water pressure to ensure proper operation.
2.3.2 Upon the successful completion of all work in SOW Paragraph 2.2 and its associated subparagraphs, the Contractor shall inspect and test the system in accordance with NFPA 13 for all replaced or reused components. This shall include, but not be limited to, testing of reused or new tamper switches, testing of flow or pressure alarm switches, and a main drain test. Additives or chemicals intended to stop leaks shall not be permitted. Provide a Material and Test Certificate in accordance with NFPA 13 Chapter 28. Fill out the form’s fields applicable to the work performed. Testing of the system shall be made by a representative of the Contractor and witnessed by the Government. Coordinate testing of the system(s) a minimum of five (5) business days ahead of testing.
2.3.3 Upon completion of preliminary inspection and testing and submission of the material and testing reports, schedule a final acceptance test with the Naval Facilities Engineering Command (NAVFAC) Fire Protection Engineer through the NSWCPD TPOC.
2.4 TRAINING
2.4.1 Once the system is functionally complete and following the final acceptance test, provide two training sessions for responding fire department and operating and maintenance personnel. Each training session shall be four (4) hours. Training sessions must be scheduled on separate days during normal duty hours on dates mutually agreed upon by both the Government and Contractor. Each training session may have up to ten (10) trainees attending the session.
2.4.2 On-site training must cover all of the items contained in the approved Operating and Maintenance Instructions.
2.4.3 Provide each individual attending the training with a hard copy of the O&M manual to reference during training.
2.4.4 Provide a digital scanned copy of the training attendance log to the TPOC no later than 24 hours following the training session. Attendance log shall include the names of each individual, organization, and title along with handwritten initialing indicating they attended the training. Additionally, provide a field for attendees to check and initial indicating if any questions remained unanswered at the completion of the training session.
2.4.5 Questions asked by attendees during that training that are not answered during the session by the instructor or are not addressed in the O&M manual must be documented and answered electronically, using image or video aids as necessary, subsequent to the training and prior to final payment.
2.4.6 Due to COVID-19, training shall utilize techniques to maximize social distancing. Course material may be presented in a large conference room provided by the Government with smaller group sessions in the field at the fire sprinkler risers for visual and hands-on instructions. Training may be scheduled in Bldg. 4 where two separate riser rooms can be utilized for hands-on and visual-based training.
3.0 SECTION 3: ADMINISTRATIVE AND SAFETY REQUIREMENTS
3.1 DIRECTIVES: The Contractor and its employees shall comply with all referenced regulations, directives, and instructions. Applicable Department of Defense (DOD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other directives, instructions, and regulations are available from the Contracting Officer.
3.2 FIRE PROTECTION: The Contractor and its employees shall know where fire alarms are located and how to turn them on. The Contractor shall handle and store all combustible supplies, materials, waste, and trash in a manner that prevents fire or hazards to persons, facilities, and materials. Contractor employees operating critical equipment shall be trained to properly respond during a fire alarm or fire in accordance with activity instructions. Any work that renders any fire protection system inoperable must be requested no less than five (5) business days ahead of the date where work would render the system inoperable. Requests must include the reason, nature of the work, duration of the work, and contact information of all key personnel associated with the work. Requests must be approved by the TPOC prior to performing the work.
3.3 ENVIRONMENTAL PROTECTION: The Contractor shall comply with all federal, state, and local environmental protection laws, regulations, and standards. The Contractor shall coordinate all environmental protection matters with the Contracting Officer. The Activity Environmental Protection Coordinator or other authorized officials may inspect any of the facilities operated or maintained by the Contractor at any time and without prior notice. If a regulatory agency assesses a monetary fine against the Government for violations resulting from Contractor actions, the Contractor shall reimburse the Government for the amount of the fine and related costs. The Contractor shall clean up any oil or chemical spills resulting from its operations at its own expense. The Contractor shall not create a nuisance or hazard to the health of military or civilian personnel.
3.4 DISPOSAL: Debris, rubbish, non-hazardous waste, and non-usable material resulting from the work under this contract shall be disposed of by the Contractor at its own expense off Government property, unless otherwise directed. In either case, the Contractor shall dispose of all hazardous waste in accordance with all applicable environmental law, including but not limited to, the Resource Conservation and Recovery Act and its associated state and local regulations. Prior to disposal of any hazardous waste, the Contractor shall obtain approval from the Contracting Officer.
3.4.1 Segregate and recycle all debris generated by the work and remove off station to a licensed facility.
Debris shall be removed and transported in a manner that prevents spillage on streets or adjacent areas.
Local regulations regarding hauling and disposal shall apply.
3.4.2 Submit a report with invoice that includes the following:
3.4.2.1 Amount (by weight) and type of waste materials disposed of in a landfill or incinerator.
Provide destination and the tip fee per ton.
3.4.2.2 Amount (by weight) and type of materials salvaged for sale, salvaged for reuse, and recycled.
Provide destination and revenue generated for each material.
3.5 SAFETY REQUIREMENTS AND REPORTS
3.5.1 All work shall be conducted in a safe manner and shall comply with all requirements of the U.S. Army
Corps of Engineers Safety and Health Requirements Manual, EM-385-1-1. The Contractor shall be responsible for instructing its employees in appropriate safety measures and shall not permit them to place machines and other equipment in traffic lanes or other locations in such a manner as to create safety hazards. The Contractor shall employ a competent person as defined in EM-385-1-1 to function as the Site Safety and Health Officer (SSHO). The following paragraphs denote minimum safety requirements. Contractor shall consult EM-385-1-1 for additional information or any safety issues not discussed in this specification.
3.5.1.1 Personal Protective Equipment Minimum Requirements
(a) Head Protection: All persons working in or visiting hard-hat areas shall be provided with and required to wear Type I or Type II, Class G meeting the requirements of ANSI Z89.1 Hardhat areas are those areas with potential hazard of head injury.
(b) Clothing: Employees shall wear clothing suitable for the weather and work conditions:
the minimum for work sites shall be short sleeve shirt, long pants (excessively long or baggy pants are prohibited).
(c) Protective Footwear: Employees shall wear safety–toed boots meeting ANSI Z41 while working on work sites.
(d) Eye and Face Protection: All eye and face protection shall meet the requirements of ANSI/ASSE Z87.1, employees shall also use eye side protection.
(e) High visibility vests shall be worn when working around work equipment or when working on highways.
3.5.1.2 Display of Safety Information: Within one calendar day after commencement of work, erect a safety bulletin board at the job site. The following information shall be displayed on the safety bulletin board in clear view of the on-site work personnel, maintained current, and protected against the elements and unauthorized removal.
(a)…