Exhibit_A_-_DD_Form_1423_CDRLs_A001-A012.pdf

PDF 274 KB Posted

Attached to
Production, Testing, and Delivery of Solid Waste (SW) Processing Equipment for Naval Ships Federal contract opportunity
Solicitation number
N64498-18-R-0020
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Exhibit A

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

Form Approved

OMB No. 0704-0188

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP_______

TM_______

OTHER X NDTI

D. SYSTEM/ITEM

SOLID WASTE EQUIPMENT (Mod I LP, Mod I MGS, SP, and Mod 1 PWS)

E. CONTRACT NO.

F. CONTRACTOR

TBD

1.DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

FIRST ARTICLE TEST PLAN

3. SUBTITLE

SUB-ASSEMBLY AND FACTORY

ACCEPTANCE TESTS

4. AUTHORITY

DI-NDTI-80566

5. CONTRACT REF.

Section C SOW

6. REQUIRING OFFICE

NSWCPD CODE 335

7. DD250 REQ

DD

9. DIST

STATEMENT

REQUIRED

10 FREQUENCY

One Time

12. DATE OF FIRST

SUBMISSION

See Block # 16

14DISTRIBUTION

B

8APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

b COPIES

16. REMARKS

a. ADDRESSEE

Draft

Final

Blocks 7 and 12: Approval shall be based upon compliance with the Top Level Assembly Drawing requirements as well as for both technical content and format.

To be done in accordance with DI-NDTI-80566.

Plan to be submitted within 30 days of contract award.

The Government has 15 days for review/approval of the submitted plan.

The contractor will submit a final plan within 10 days of Government comments.

Block 9: Distribution authorized to U.S. Government agencies only (Test and Evaluation)(06/15/2018).

NSWCCD 635

PEO SHIPS AM4

0 0

15. TOTAL------------>

1 1

G. PREPARED BY:

Paul Schwegler

H. DATE

06/15/2018

I. APPROVED BY:

J. DATE

06/15/2018 Matthew Dreby

A002

FIRST ARTICLE TEST PROCEDURE

DI-NDTI-80809B- See Block # 16

As Required

12. DATE OF FIRST

Block 4: Test Procedures shall cover all tests/inspections as identified in Attachment B. To be done in accordance with DI-NDTI-80603.

Approval shall be based upon compliance with the Top Level Assembly Drawing requirements as well as for both technical content and format.

Blocks 12 and 13: Plan to be submitted within 30 days of contract award.

The Government has 15 days for review/approval of the submitted plan.

The contractor will submit a final plan within 10 days of Government

NSWCCD-SSES 635

A003

TEST/INSPECTION REPORTS

DI-NDTI-80809B- See Block # 16

Blocks 12 and 13: Final assembly test reports shall be submitted no later than 3 days after each LP, MGS, SP AND MOD1 PWS is tested. One test report for both subassembly and final assembly shall be submitted for each LP, MGS, SP AND MOD1 PWS to be delivered.

Block 4: To be done in accordance with DI-NDTI-80809A.

Matthew Dreby

OTHER X SESS

COMPETITIVE PROCUREMENT

A004

ENGINEERING CHANGE PROPOSAL

DI-CMAN-80639B

Blocks 10, 12, and 13: Approval shall be based on technical content and compliance with Appendix D of MIL-STD-973. Shall be submitted whenever engineering changes are required.

To be done in accordance with DI-CMAN-80639B.

ECP shall be submitted no later than 15 days after the need is recognized. Supporting data (engineering calculations, drawings, financial analysis, etc) for the ECP shall be included with it. ECP’s shall be prepared in accordance with Appendix D of MIL-STD-973.

(Administrative or Operational Use)(06/15/2018).

OTHER X MGMT

A005

REQUEST FOR DEVIATION

DI-CMAN-80640B

Blocks 12 and 13: Content and format shall be in accordance with Appendix E of MIL-STD-973. Approval shall be based on compliance with Appendix E of MIL-STD-973.

To be done in accordance with DI-NDTI-80640B.

Request for Deviations shall be submitted 15 days after the need for a deviation is known.

Subsequent submissions shall be made within 10 days after the request.

Supporting data such as engineering calculations, drawings, sketches, financial analysis, etc.) that will clarify or justify the request shall be included.

A006

REQUEST FOR WAVIER

DI-CMAN-80641B

Block # 12: Request for Deviations shall be submitted 15 days after the need for a deviation is known.

Block # 13: Subsequent submissions shall be made within 10 days after the request. Supporting data such as engineering calculations, drawings, sketches, financial analysis, etc.) that will clarify or justify the request shall be included.

Content and format shall be in accordance with Appendix E of MIL- STD-973. Approval shall be based on compliance with Appendix E of MIL-STD-973. To be done in accordance with DI-NDTI-80640B.

A007

NOTICE OF REVISION

DI-CMAN-80642B

Blocks 12 and 13: Approval shall be based on technical content and format and compliance with Appendix G of MIL-STD-973. To be done in accordance with DI-NDTI-80642B.

NOR’s shall be submitted within 30 days of approval of ECP.

Subsequent submission shall be made within 10 days after request is made.

SOLID WASTE EQUIPMENT (Mod I

OTHER:QCIC

A008

QUALITY ASSURANCE PROGRAM PLAN

DI-QCIC-81794

See Block #16

One Time

Shall be in accordance with ISO 9002.

Block 12: Plan to be submitted within 30 days of contract award.

The Government has 30 days for review/approval of the submitted plan.

The contractor will submit a final plan within 15 days of Government

OTHER X MGMT

A009

CONTRACTOR’S PROGRESS, STATUS, AND

MANAGEMENT REPORT

DI-MGMT-80227

LT

Block 12: Draft copy to be submitted for Government review of format only 45 days after contract award. The first report is due 60 days after contract award.

Block 13: Government comments will be submitted within 15 days after receipt of draft copy. Subsequent submittals shall be within 10 days of receipt of Government comments.

Block 10: Status reports shall be submitted monthly.

Plan shall cover meaningful milestone events which define contract progress culminating with contract required delivery dates, estimated delivery dates, and actual delivery dates for all software and hardware items.

Shall be in accordance with DI-MGMT-80227 excluding paragraphs 10.3.f, 10.3.g, 10.3.h, and 10.3.i do not apply. Reports shall be submitted monthly until delivery of equipment on first delivery order then quarterly after that.

Report format approval shall be based on the validity and scope of events to be reported.

OTHER X ADMN

A010

CONFERENCE AGENDA

DI-ADMIN-81249A

Blocks 10, 11, 12, and 13: Meetings shall be monthly from date of award through the second delivery.

Meetings shall be every three months after delivery of the second delivery.

Agenda is due 10 days prior to planned conference date. All meetings will occur at the contractor’s facility

OTHER X ADMN

A011

CONFERENCE MINUTES

DI-ADMIN-81250A

Blocks 10, 11, and 12: As required

Block 13: Due no later than 10 days after scheduled conferences.

A012

FIRST ARTICLE TEST NOTIFICATION

DI-NDTI-80566

See Block #16

Blocks 10, 11, 12, and 13: Shall be submitted prior to the first time a Pulper (Large or Small) and Shredder (Plastic or Metal Glass) are tested at the factory.

The Navy shall witness the first unit test only of a Pulper and Shredder.

Shall provide notice of 15 days.

Shall be in accordance with ISO 9002.