Solicitation_LPE_Services_N6449818R0015_Questions_Answers_No3.pdf
PDF 357 KB Posted
- Attached to
- Replace EOG with LPE
- Solicitation number
- N64498-18-R-0015
About this file
Questions and Responses to Solicitation N64498-18-R-0001; Pending Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6449818R00150001.pdf | ||
| Solicitation_LPE_Services_N6449818R0015_Questions_Answers.pdf | ||
| Cost_Summary_Format_Attachement_4.xls | XLS spreadsheet | |
| Labor_Rate_Substantiation_Table_-_Attachment_3.xls | XLS spreadsheet | |
| Solicitation_LPE_Services_N6449818R0015_Questions_Answers.docx | DOCX document | |
| Sect_J_Attach_CDRLs_DD254_GFP.zip | ZIP file | |
| N6449818R0015.pdf | ||
| SYNOPSIS__for_LPE.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation LPE Services N64498-18-R-0015 Questions and Answers
1. Question/Comment: Section C.12.3, page 27 & Section L.2.1, page 94 – Factors I and II combined have a 25 page limit. The three Key Personnel resumes required each have a 2 page maximum. Recommend exclude Key Personnel resumes from the page count.
Response: The Key Personnel resumes are excluded from the 25 page count limitation.
2. Question/Comment: Section L1.4.3.1, page 101 states: "Furnish the cost tables provided as
Attachment X, Cost Summary Format, in Microsoft Excel format and Attachment X, Labor Rate
Substantiation Table. Formulas used in the calculations shall be left in the tables."
Neither the Cost Summary Format nor Labor Rate Substantiation Table were provided. Please advise.
Response: Attachments 4 Labor Rate Substantiation Table, and Attachment 5 Cost Summary Format have been uploaded to the Solicitation FBO posting. Section J of the solicitation will be updated with an upcoming amendment.
3. Question/Comment: Please confirm that the NTE amount in CLIN 0002 of $276,000 exclusive of indirect rates is for one (1) installation.
Response: Solicitation N64498-18-R-0015 shall be amended as follows:
Section B CLIN 0001 FROM:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lot
Design and Engineering Services
CPFF
Design and Engineering Services to upgrade, modernize, improve or reconfigure the Electrolytic Oxygen Generator (EOG), Automated Electrolytic Oxygen Generator (AEOG), Low Pressure Electrolyzer (LPE) and their respective simulators. Design and Engineering Services are to be completed at contractor's facility or any required location as needed.
FOB: Destination
PSC CD: R425
Section B CLIN 0001 TO:
0001 1 Lot
Design and Engineering Services
CPFF
Provide BLUE COLLAR services for the removal of the Electrolytic Oxygen Generator (EOG) and installation of the Low Pressure Electrolyzer (LPE) aboard up to four (4) OHIO
Class Submarines. The removal and installation shall be in accordance with TRID-0615 "Replace EOG with LPE". The services are to be completed at contractor's facility; Kings Bay, GA; Norfolk, VA; Bremerton, WA; and/or Bangor, WA.
Section B CLIN 0002 FROM:
0002 1 Lot
Other Direct Costs (ODCs) and Travel
COST
Other Direct Costs in support of CLIN 0001.
Not to exceed amount of $276,600 EXCLUSIVE of indirect rates.
Section B CLIN 0002 TO:
0002 1 Lot
Other Direct Costs (ODCs) and Travel
COST
Other Direct Costs in support of CLIN 0001.
Not to exceed amount of $1,440,000.00 EXCLUSIVE of indirect rates.
File details come from the government source that posted it.