This document is a NAVSEA technical publication providing general requirements, provisions, and test procedures for the qualification and use of powder bed fusion additive manufacturing (PBF AM) to fabricate metal parts for naval applications.
The key details are:
- The document covers procedure qualification requirements, part verification testing, quality assurance, and process control plans for PBF AM. It specifies essential elements, material acceptance criteria, powder feedstock requirements, heat treatment, and nondestructive and destructive testing.
- Three levels of qualification are defined - level 1 for initial procedure qualification, level 2 for procedure changes, and part level for specific part builds. Requalification is required for certain changes to the procedure or part.
- The document includes requirements for submitting procedures, test plans, test reports, and production conformance documents for review and approval by NAVSEA or its authorized representatives.
- NAVSEA approval is required for critical applications, special parts/applications, and PBF systems with processing capabilities outside the scope of this document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 14_Amendment 1.pdf | ||
| 7_Attachemnt 3-Q and A.pdf | ||
| 7_DI-MISC-80711A.pdf | ||
| N6426724Q0235 - Combined Synopsis.pdf | ||
| 7_CDRL A001 (Scientific and Technical Reports).pdf | ||
| 9_WAGE DETERMINATION.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S9074-A2-GIB-010/AM-PBF
REVISION 1
NAVSEA TECHNICAL PUBLICATION
REQUIREMENTS FOR METAL POWDER BED FUSION
ADDITIVE MANUFACTURING
Supersedure Notice: This revision supersedes S9074-A2-GIB-010/AM-PBF dated 21 January 2020.
DISTRIBUTION STATEMENT A: APPROVED FOR PUBLIC RELEASE: DISTRIBUTION IS UNLIMITED.
PUBLISHED BY DIRECTION OF COMMANDER, NAVAL SEA SYSTEMS COMMAND
19 JANUARY 2024
S9074-A2-GIB-010/AM-PBF, Rev 1
RECORD OF REVISIONS-1/(RECORD OF REVISIONS-2 Blank)
RECORD OF REVISIONS
REVISION
NO. DATE TITLE OR BRIEF DESCRIPTION/PREPARING ACTIVITY
0 21 JAN 2020 Initial issue.
1 19 JAN 2024 This revision streamlines the qualification process for Powder Bed Fusion (PBF) Additive Manufacturing procedures and components and added allowances for additional PBF technologies. The requirement for approval of the PBF Procedure prior to execution of procedure qualification builds has been removed. The requirement to perform nondestructive testing for procedure qualification has been rescinded, and nondestructive testing requirements have been revised for other areas.
Destructive testing requirements have been streamlined for procedure qualification and part verification. Electron beam PBF requirements have been added. Other clarifications to requirements have been made throughout the document.
FOREWORD-1/(FOREWORD-2 Blank)
FOREWORD
This document covers general requirements, provisions for quality assurance and process control plans, test procedures, and instructions for preparation for delivery for powder bed fusion-produced parts.
TECHNICAL MANUAL FEEDBACKS
Ships, training activities, supply points, depots, Naval Shipyards and Supervisors of Shipbuilding are requested to arrange for the maximum practical use and evaluation of NAVSEA technical manuals. All errors, omissions, discrepancies and suggestions for improvement to NAVSEA technical manuals shall be submitted via one of the following methods:
1. The preferred method is to submit the Feedback directly into MBPS at https://mbps.navseaplm.navy.mil/Windchill/. MBPS is an unclassified system, do not include U-NNPI or Classified data as attachments to a feedback. See option 5 for classified data. To request a MBPS account submit a ticket to the National Help Desk Service Management (NHDSM) at https://nhdsm.navair.navy.mil/ (DoD PKI Certificate required).
2. Submit a ticket via NHDSM. When submitting the ticket, include a completed copy of NAVSEA 4160/1 (TMDER Form). All data submitted via NHDSM shall be unclassified only.
3. Email a completed copy of NAVSEA 4160/1 to nav_helpdesk.fct@navy.mil. All data submitted shall be unclassified only.
4. For non-Help Desk account holders, submit the feedback via the following link (CAC or ECA Cert Required):
https://nhdsm.navair.navy.mil/HEAT/alp.aspx?Scope=SelfService&CommandId=NewServiceRequ estByOfferingId&Tab=ServiceCatalog&Template=1DE99338DBF9480D9CD3F6EE57B08124 When submitting the ticket, include a completed copy of NAVSEA 4160/1. All data submitted shall be unclassified only.
5. For NNPI and Classified data, continue to use the paper copy of NAVSEA 4160/1 and submit using the current process.
All feedback comments shall be thoroughly investigated, and originators will be advised of action resulting therefrom. One copy of NAVSEA form 4160/1 is at the end of each separately bound technical manual 8-1/2 x 11 inches or larger.
i
TABLE OF CONTENTS
Chapter/Paragraph Page
Chapter 1 Scope and Applicability ............................................................................................................ 1-1 1-1 Scope. ........................................................................................................................................... 1-1 1-2 Non-Applicability. ....................................................................................................................... 1-1
1-2.1 Naval Nuclear Propulsion. .................................................................................................. 1-1 1-2.2 Strategic Systems Programs. .............................................................................................. 1-1 1-2.3 Non-Critical Applications. .................................................................................................. 1-1
1-3 Requirements Subject to NAVSEA Approval ............................................................................. 1-1 1-4 Referenced Documents. ............................................................................................................... 1-1
1-4.1 Government Documents. .................................................................................................... 1-1 1-4.1.1 Standards. .................................................................................................................. 1-1 1-4.1.2 Other Government Documents. ................................................................................ 1-2
1-4.2 Non-Government Documents. ............................................................................................ 1-2 1-4.3 Order of Precedence. .......................................................................................................... 1-4
1-5 Definitions. ................................................................................................................................... 1-4 1-5.1 Acceptable. ......................................................................................................................... 1-4 1-5.2 Activity. .............................................................................................................................. 1-4 1-5.3 Additive Manufacturing (AM). .......................................................................................... 1-4 1-5.4 AM Authorized Representative. ......................................................................................... 1-4 1-5.5 Approval (Approved). ........................................................................................................ 1-4 1-5.6 As-Built. ............................................................................................................................. 1-4 1-5.7 Build. .................................................................................................................................. 1-4 1-5.8 Coupon. .............................................................................................................................. 1-4 1-5.9 Digital Files. ....................................................................................................................... 1-4 1-5.10 Electron Beam Powder Bed Fusion. ................................................................................. 1-4 1-5.11 Energy Source................................................................................................................... 1-4 1-5.12 Essential Elements. ........................................................................................................... 1-5 1-5.13 Fabrication Document. ..................................................................................................... 1-5 1-5.14 Family of Parts.................................................................................................................. 1-5 1-5.15 Fusion. .............................................................................................................................. 1-5 1-5.16 Heat Treatment. ................................................................................................................ 1-5 1-5.17 Inspector. .......................................................................................................................... 1-5 1-5.18 Laser Powder Bed Fusion. ................................................................................................ 1-5 1-5.19 Layer Height. .................................................................................................................... 1-5 1-5.20 Machine. ........................................................................................................................... 1-5 1-5.21 Manufacturing Lot. ........................................................................................................... 1-5 1-5.22 Operator. ........................................................................................................................... 1-5 1-5.23 Part. ................................................................................................................................... 1-5 ii
Chapter/Paragraph Page
1-5.24 Part Verification. .............................................................................................................. 1-5 1-5.25 Part Verification Build. ..................................................................................................... 1-5 1-5.26 Post-Heat. ......................................................................................................................... 1-5 1-5.27 Powder Bed Fusion (PBF). ............................................................................................... 1-5 1-5.28 Powder Blend. .................................................................................................................. 1-5 1-5.29 Powder Lot. ...................................................................................................................... 1-6 1-5.30 Powder Removal System. ................................................................................................. 1-6 1-5.31 Preheat. ............................................................................................................................. 1-6 1-5.32 Presinter. ........................................................................................................................... 1-6 1-5.33 Procedure. ......................................................................................................................... 1-6 1-5.34 Procedure Qualification. ................................................................................................... 1-6 1-5.35 Procedure Qualification Build. ......................................................................................... 1-6 1-5.36 Production Lot. ................................................................................................................. 1-6 1-5.37 Recoater. ........................................................................................................................... 1-6 1-5.38 Recycled Powder. ............................................................................................................. 1-6 1-5.39 Review for Adequacy. ...................................................................................................... 1-6 1-5.40 Scan Strategy. ................................................................................................................... 1-6 1-5.41 Special PBF Applications/Parts. ....................................................................................... 1-6 1-5.42 System. ............................................................................................................................. 1-6 1-5.43 TP 248 Authorized Representative. .................................................................................. 1-7 1-5.44 Used Powder. .................................................................................................................... 1-7 1-5.45 Virgin Powder................................................................................................................... 1-7 1-5.46 Waiver. ............................................................................................................................. 1-7 1-5.47 Witness Coupon. ............................................................................................................... 1-7
1-6 Classification. ............................................................................................................................... 1-7 1-6.1 Included Classification. ...................................................................................................... 1-7 1-6.2 Other Classifications. .......................................................................................................... 1-9
Chapter 2 General Requirements and Test Reports ................................................................................... 2-1 2-1 Scope. ........................................................................................................................................... 2-1 2-2 General Requirements and Test Reports. ..................................................................................... 2-1
2-2.1 Responsibility. .................................................................................................................... 2-1 2-2.1.1 Qualification Builds. ................................................................................................. 2-1
2-2.2 Certification of Qualification Testing. ................................................................................ 2-1 2-2.2.1 Approval of Other Procedure Qualifications. ........................................................... 2-1
2-2.3 Submittal of Procedures, Test Plans, and Test Reports. ..................................................... 2-2 2-2.3.1 Review for Adequacy. ............................................................................................... 2-2 2-2.3.2 Procedure Approval. ................................................................................................. 2-2 2-2.3.3 Part Acceptance. ........................................................................................................ 2-2 2-2.3.4 Approval by Audit. ................................................................................................... 2-2 iii
Chapter/Paragraph Page
2-2.3.5 AM Authorized Representative Advance Notification. ............................................ 2-3 2-2.4 Vendor Procedure Qualification. ........................................................................................ 2-3 2-2.5 Waiver of Qualification. ..................................................................................................... 2-3 2-2.6 Approval of Critical Applications. ..................................................................................... 2-3 2-2.7 Approval of Special Parts and Applications. ...................................................................... 2-3
2-2.7.1 Approval of Special PBF Systems. ........................................................................... 2-3 2-2.8 Qualification Level. ............................................................................................................ 2-3
2-2.8.1 Level 1....................................................................................................................... 2-3 2-2.8.2 Level 2....................................................................................................................... 2-3 2-2.8.3 Part Level. ................................................................................................................. 2-3
2-2.9 Repair of Procedure Qualification Builds and Part Verification Builds. ............................ 2-4 2-2.9.1 Insufficient Procedure Qualification and Part Verification. ...................................... 2-4
2-2.10 Transfer of Procedure Qualification. ................................................................................ 2-4 2-2.10.1 Transfer of Qualified Procedures Between Sites of an Activity. ............................ 2-4
Chapter 3 Powder Bed Fusion Procedure Qualification ............................................................................ 3-1 3-1 Scope. ........................................................................................................................................... 3-1 3-2 PBF Procedure. ............................................................................................................................ 3-1
3-2.1 Scope. ................................................................................................................................. 3-1 3-2.2 Essential Elements. ............................................................................................................. 3-1 3-2.3 Material Acceptance Criteria. ............................................................................................. 3-1
3-2.3.1 Existing Acceptance Criteria..................................................................................... 3-1 3-2.3.2 Original Equipment Manufacturer (OEM) Properties. ............................................. 3-1 3-2.3.3 New Acceptance Criteria. ......................................................................................... 3-1
3-2.4 Powder Feedstock. .............................................................................................................. 3-2 3-2.5 Heat Treatment. .................................................................................................................. 3-2 3-2.6 Review for Adequacy. ........................................................................................................ 3-2
3-3 PBF Test Plan. .............................................................................................................................. 3-2 3-3.1 Scope. ................................................................................................................................. 3-2 3-3.2 Procedure Qualification Builds........................................................................................... 3-2
3-3.2.1 Procedure Qualification Powder Feedstock. ............................................................. 3-2 3-3.2.1.1 Procedure Qualification Powder Feedstock Condition. ................................... 3-2
3-3.2.2 Procedure Qualification Build Quantities. ................................................................ 3-2 3-3.2.3 Procedure Qualification Build Specimen and Coupon Locations. ............................ 3-2 3-3.2.4 Procedure Qualification Build Metallographic Specimens. ...................................... 3-3 3-3.2.5 Build Layout. ............................................................................................................ 3-3 3-3.2.6 Procedure Qualification Build Interruptions. ............................................................ 3-3
3-3.2.6.1 Process Interruption Build Metallographic Specimens. .................................. 3-3 3-3.2.7 Procedure Qualification Post-Processing. ................................................................. 3-3
3-3.2.7.1 Surface Finish. ................................................................................................. 3-3 iv
Chapter/Paragraph Page
3-3.2.7.2 Heat Treatment. ............................................................................................... 3-3 3-3.3 Nondestructive Testing (NDT). .......................................................................................... 3-3 3-3.4 Destructive Testing. ............................................................................................................ 3-3
3-3.4.1 Metallographic Specimens. ....................................................................................... 3-3 3-4 Procedure Qualification Test Report. ........................................................................................... 3-4 3-5 Changes Requiring Level 1 Requalification of Procedure. .......................................................... 3-4
3-5.1 Powder Feedstock. .............................................................................................................. 3-4 3-5.2 Powder Feedstock Production Process. .............................................................................. 3-4 3-5.3 Build Plate. ......................................................................................................................... 3-4 3-5.4 Machine. ............................................................................................................................. 3-4 3-5.5 Recoater. ............................................................................................................................. 3-4 3-5.6 Preheat Temperature. .......................................................................................................... 3-4 3-5.7 Energy Source Parameters (Laser). .................................................................................... 3-5 3-5.8 Energy Source Parameters (Electron Beam). ..................................................................... 3-5 3-5.9 Shielding. ............................................................................................................................ 3-5 3-5.10 Post-Build Processing. ...................................................................................................... 3-5 3-5.11 Contour Scan Parameters. ................................................................................................. 3-5 3-5.12 Fill Scan Parameters. ........................................................................................................ 3-6 3-5.13 Scan Parameters (Electron Beam). ................................................................................... 3-6 3-5.14 Layer Height. .................................................................................................................... 3-6
3-6 Changes Requiring Level 2 Requalification of Procedure. .......................................................... 3-6 3-6.1 Powder Feedstock. .............................................................................................................. 3-6 3-6.2 Build Plate. ......................................................................................................................... 3-6 3-6.3 Recoater. ............................................................................................................................. 3-6 3-6.4 Powder Deposition. ............................................................................................................ 3-6 3-6.5 Fill Scan Parameters. .......................................................................................................... 3-6 3-6.6 Energy Source Parameters (Laser). .................................................................................... 3-6 3-6.7 Scan Parameters (Electron Beam). ..................................................................................... 3-6 3-6.8 Post Processing. .................................................................................................................. 3-6
Chapter 4 Part Verification ........................................................................................................................ 4-1 4-1 Scope. ........................................................................................................................................... 4-1 4-2 Part Manufacturing Plan. ............................................................................................................. 4-1
4-2.1 Essential Elements. ............................................................................................................. 4-1 4-2.1.1 Presintering Parameters. ............................................................................................ 4-1
4-2.2 Material Acceptance Criteria. ............................................................................................. 4-1 4-2.3 Build Layout Figures. ......................................................................................................... 4-1
4-2.3.1 Witness Coupons. ...................................................................................................... 4-1 4-2.3.2 Post-Processing. ........................................................................................................ 4-1 4-2.3.3 Process Interruptions. ................................................................................................ 4-2 v
Chapter/Paragraph Page
4-2.3.4 Family of Parts Changes Not Requiring Part Requalification. ................................. 4-2 4-2.3.5 Part Manufacturing Plans Containing Multiple Parts. .............................................. 4-2
4-2.4 Review for Adequacy. ........................................................................................................ 4-2 4-3 Part Verification Test Plan. .......................................................................................................... 4-2
4-3.1 NDT. ................................................................................................................................... 4-2 4-3.2 Destructive Testing. ............................................................................................................ 4-2
4-3.2.1 Metallographic Specimens. ....................................................................................... 4-2 4-3.3 Application-Specific Requirements. ................................................................................... 4-2
4-4 Part Verification Test Report. ...................................................................................................... 4-3 4-4.1 Work Instructions. .............................................................................................................. 4-3 4-4.2 Powder Feedstock Testing. ................................................................................................. 4-3
4-5 Changes Requiring Part Requalification. ..................................................................................... 4-3 4-5.1 Level 1 Qualification Changes. .......................................................................................... 4-3 4-5.2 Digital Files. ....................................................................................................................... 4-3 4-5.3 Energy Source Parameters (Electron Beam). ..................................................................... 4-3 4-5.4 Post-Processing. .................................................................................................................. 4-3
Chapter 5 Production Conformance Evaluation Plan ................................................................................ 5-1 5-1 Scope. ........................................................................................................................................... 5-1 5-2 General Requirements. ................................................................................................................. 5-1
5-2.1 Production Builds. .............................................................................................................. 5-1 5-2.2 Production Conformance Testing. ...................................................................................... 5-1 5-2.3 Build Layout Figures. ......................................................................................................... 5-1 5-2.4 Part Verification Material Change. ..................................................................................... 5-1 5-2.5 Witness Coupons. ............................................................................................................... 5-1 5-2.6 Process Interruptions. ......................................................................................................... 5-1 5-2.7 Use of Part Verification Test Plan as Production Conformance Evaluation Plan. ............. 5-1
5-3 Powder Feedstock Testing. .......................................................................................................... 5-2 5-4 NDT and Repairs. ........................................................................................................................ 5-2
5-4.1 Non-Pressurized Machinery. .............................................................................................. 5-2 5-4.2 Pressurized Machinery and Pressure Vessels. .................................................................... 5-2 5-4.3 Piping. ................................................................................................................................. 5-2 5-4.4 Other parts. ......................................................................................................................... 5-2 5-4.5 Acceptance Criteria. ........................................................................................................... 5-2 5-4.6 Repair of Production Builds. .............................................................................................. 5-3
5-4.6.1 Post-Build Repair. ..................................................................................................... 5-3 5-4.6.1.1 Post-Build Repair NDT Records. .................................................................... 5-3
5-5 Destructive Testing. ..................................................................................................................... 5-3 5-6 Production Conformance Test Report. ......................................................................................... 5-3 5-7 Responsibility for Production Conformance. ............................................................................... 5-3 vi
Chapter/Paragraph Page
5-7.1 Certificate of Production Conformance. ............................................................................. 5-3 Chapter 6 Quality Assurance and Process Control Plan ............................................................................ 6-1
6-1 Scope. ........................................................................................................................................... 6-1 6-2 Quality Assurance Plan. ............................................................................................................... 6-1
6-2.1 Material Control. ................................................................................................................ 6-1 6-2.1.1 Identification System. ............................................................................................... 6-1 6-2.1.2 Visual Verification of Materials Prior to Use. .......................................................... 6-1
6-2.2 Records. .............................................................................................................................. 6-1 6-2.2.1 Record Form. ............................................................................................................ 6-1 6-2.2.2 Maintenance of Records. ........................................................................................... 6-1 6-2.2.3 Maintenance of Procedure Test Reports. .................................................................. 6-1
6-2.3 Nonconformance. ............................................................................................................... 6-2 6-3 Process Control Plan. ................................................................................................................... 6-2
6-3.1 Change Control Plan. .......................................................................................................... 6-2 6-3.2 Personnel Training Plan. ..................................................................................................... 6-2 6-3.3 Vision Test Requirements. ................................................................................................. 6-3 6-3.4 Maintenance Control Plan. ................................................................................................. 6-3 6-3.5 Digital File Handling Plan. ................................................................................................. 6-3 6-3.6 Powder Feedstock Plan. ...................................................................................................... 6-4 6-3.7 Build Procedure. ................................................................................................................. 6-4 6-3.8 Post-Processing Procedure.................................................................................................. 6-4 6-3.9 In-Process Monitoring Plan. ............................................................................................... 6-4 6-3.10 Data Collection System. ................................................................................................... 6-4
Chapter 7 Evaluation .................................................................................................................................. 7-1 7-1 Scope. ........................................................................................................................................... 7-1 7-2 General Evaluation Requirements. ............................................................................................... 7-1
7-2.1 Rejection and Retests. ......................................................................................................... 7-1 7-2.2 Reheat Treatment. ............................................................................................................... 7-1 7-2.3 Defective Specimen/Replacement of Test Specimens. ....................................................... 7-1
7-3 Powder Feedstock Testing. .......................................................................................................... 7-1 7-3.1 Sampling. ............................................................................................................................ 7-1 7-3.2 Chemistry. .......................................................................................................................... 7-1 7-3.3 Size Distribution. ................................................................................................................ 7-2 7-3.4 Apparent Density. ............................................................................................................... 7-2 7-3.5 Tap Density......................................................................................................................... 7-2
7-4 NDT. ............................................................................................................................................ 7-2 7-4.1 Visual Testing (VT). ........................................................................................................... 7-2
7-4.1.1 Titanium and Titanium Alloys. ................................................................................. 7-2 7-4.2 Dimensional Examination. ................................................................................................. 7-2 vii
Chapter/Paragraph Page
7-4.3 Magnetic Particle Testing (MT) and Liquid Penetrant Testing (PT). ................................. 7-2 7-4.3.1 MT and PT Suitability. .............................................................................................. 7-2
7-4.4 Radiographic Testing (RT) and Inspection. ........................................................................ 7-2 7-4.4.1 Radiographic Shooting Sketch. ................................................................................. 7-2
7-4.5 Ultrasonic Testing (UT). ..................................................................................................... 7-3 7-4.5.1 Calibration Reference Standard Acoustic Similarity. ............................................... 7-3
7-4.6 Alternate NDT Methods. .................................................................................................... 7-3 7-4.6.1 X-Ray Computed Tomography (XCT). .................................................................... 7-3
7-5 Destructive Testing. ..................................................................................................................... 7-3 7-5.1 Tension Tests. ..................................................................................................................... 7-3 7-5.2 Charpy V-Notch (CVN). .................................................................................................... 7-3 7-5.3 Fracture Toughness. ............................................................................................................ 7-3 7-5.4 Metallographic Specimens.................................................................................................. 7-4
7-5.4.1 Metallographic Features. ........................................................................................... 7-4 7-5.5 Hardness Test. .................................................................................................................... 7-4 7-5.6 Chemistry. .......................................................................................................................... 7-4 7-5.7 Special Tests. ...................................................................................................................... 7-4
Chapter 8 Acquisition ................................................................................................................................ 8-1 8-1 Scope. ........................................................................................................................................... 8-1 8-2 Acquisition Requirements. ........................................................................................................... 8-1 8-3 Part Verification. .......................................................................................................................... 8-1
8-3.1 New Vendors. ..................................................................................................................... 8-1 8-4 Preparation for Packaging and Packing. ...................................................................................... 8-1
8-4.1 Packaging, Packing, and Marking for Shipment. ............................................................... 8-1 8-4.2 Packaging by DoD Personnel. ............................................................................................ 8-1
Appendix A Associated Tables ................................................................................................................. A-1 Appendix B Associated Illustrations......................................................................................................... B-1 viii
LIST OF TABLES
Table Title Page
Table A-1. Essential Elements of the PBF Procedure .............................................................................. A-1 Table A-2. Powder Testing for PBF Procedure Qualification ................................................................. A-3 Table A-3. Destructive Testing for PBF Procedure Qualification ........................................................... A-3 Table A-4. Destructive Testing Figure Reference ................................................................................... A-3 Table A-5. Non-Pressure Containing Parts in Machinery ....................................................................... A-4 Table A-6. Inspection for Pressurized Machinery and Pressure Vessels ................................................. A-6 Table A-7. Class P Piping Part Inspection Requirements ........................................................................ A-9 Table A-8. Production Conformance Testing ........................................................................................ A-13 Table A-9. Sample Form: PBF Procedure ............................................................................................ A-14 Table A-10. Sample Form: Powder Size Distribution and Morphology Results .................................. A-24 Table A-11. Sample Form: Powder Density Testing Results ............................................................... A-24 Table A-12. Sample Form: Tensile Test Results .................................................................................. A-25 Table A-13. Sample Form: Charpy V-Notch Test Results ................................................................... A-25 Table A-14. Sample Form: Metallographic Test Results ...................................................................... A-26 Table A-15. Sample Form: Hardness Test Results ............................................................................... A-26
LIST OF ILLUSTRATIONS
Figure Title Page
Figure B-1. Tensile Specimen Orientations and Extraction for Machining (Examples) ......................... B-1 Figure B-2. Charpy V-Notch Specimen Orientations and Extraction for Machining (Examples) .......... B-2 Figure B-3. Example of Destructive Testing Orientations in Build Interruption (Example) ................... B-2 Figure B-4. Witness Coupon Locations on Part Verification Builds (Examples) ................................... B-3
1-1
CHAPTER 1
SCOPE AND APPLICABILITY
1-1 SCOPE.
This document provides the minimum qualification requirements, part verification requirements, and performance requirements for fabricating metal parts using powder bed fusion (PBF) additive manufacturing (AM). This document also covers general requirements, provisions for quality assurance and process control plans, test procedures, and instructions for preparation for delivery of PBF-produced parts. Procedure qualification, part verification, and operator qualification requirements, as well as completion of all assessments and requirements for NAVSEA’s use of AM shall be met prior to any production fabrication. The requirements in this document are devised to demonstrate that sound PBF parts can be produced. This document does not purport to address all the safety concerns, if any, associated with the use of PBF. It is the responsibility of the user of this document to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
1-2 NON-APPLICABILITY.
1-2.1 NAVAL NUCLEAR PROPULSION. This document does not apply to naval nuclear propulsion plant systems, equipment, and facilities under the cognizance of the Deputy Commander, Naval Nuclear Propulsion Directorate (SEA 08). As outlined in EO 12344, the SEA 08 Deputy Commander has responsibilities and authorities over all facilities and activities which comprise the Naval Nuclear Propulsion Program, which is a joint Department of Energy and Navy organization. These responsibilities and authorities include all technical and logistical matters related to naval nuclear propulsion. Accordingly, nothing in this document supersedes or changes those authorities, and SEA 08 shall be consulted concerning all matters related to naval nuclear propulsion.
1-2.2 STRATEGIC SYSTEMS PROGRAMS. This document does not apply to Strategic Weapons Systems, Attack Weapons Systems, and associated spare and repair parts under the cognizance of Strategic Systems Programs.
1-2.3 NON-CRITICAL APPLICATIONS. This document does not apply to applications covered by NAVSEA ltr Ser 05Z/191 or applications with service condition level severities of level 7 and N/A in accordance with NAVSEA’s Guidance on the Use of AM.
1-3 REQUIREMENTS SUBJECT TO NAVSEA APPROVAL
Any items contained in this document specifically requiring NAVSEA approval shall be forwarded to Naval Sea Systems Command, SEA 05T1, 1333 Isaac Hull Ave, SE, Stop 5142, Washington Navy Yard, DC 20376-5142 via the AM authorized representative. Subcontractors shall submit such items to the contracting activity in accordance with the contract or purchase order. Contracting activities and authorized representatives shall thoroughly review and make recommendations as to the acceptability of the item submitted.
1-4 REFERENCED DOCUMENTS.
1-4.1 GOVERNMENT DOCUMENTS.
1-4.1.1 Standards. The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited in the solicitation or contract.
1-2
DEPARTMENT OF DEFENSE STANDARDS
MIL-STD-2035 - Nondestructive Testing Acceptance Criteria
(Copies of this document are available online at https://quicksearch.dla.mil.)
1-4.1.2 Other Government Documents. The following other Government documents form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited in the solicitation or contract.
NAVAL SEA SYSTEMS COMMAND (NAVSEA) LETTERS
4870 Ser 05T/2018-024 - Guidance on the Use of Additive Manufacturing
9070 Ser 05Z/191 - Guidance on Identification and Installation of Low Risk Additively Manufactured Metal Components
(Copies of these documents are available by request from Command Standards at usn.ncr.comnavseasyscomdc.mbx.command-standards@us.navy.mil.)
NAVSEA TECHNICAL PUBLICATIONS
S9074-AQ-GIB-010/248 - Requirements for Welding and Brazing Procedure and Performance Qualification
S9074-AR-GIB-010/278 - Requirements for Fabrication Welding and Inspection, and Casting Inspection and Repair for Machinery, Piping, and Pressure Vessels
T9074-AS-GIB-010/271 - Requirements for Nondestructive Testing Methods
(Copies of these documents are available online via Model Based Product Support (MBPS) at https://mbps.navseaplm.navy.mil/Windchill/app/. To gain access to MBPS, obtain an account with National Help Desk Service Management (NHDSM) at https://nhdsm.navair.navy.mil (a valid CAC is required to access this website) and submit a SAAR-N Request. Refer questions, inquiries, or problems to
(888) 292-5919. These documents are available for ordering (hard copy) via the Naval Logistics Library (NLL) at https://nll.navsup.navy.mil. For questions regarding the NLL, contact the NLL Customer Service at nllhelpdesk@navy.mil, (866) 817-3130, or (215) 697-2626/DSN 442-2626.)
1-4.2 NON-GOVERNMENT DOCUMENTS. The following documents form a part of this document to the extent specified. Unless otherwise specified, the issues of the documents are those cited in the solicitation or contract.
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
Boiler Pressure and Vessel Code (BPVC), Section V, Nondestructive Examination
(Copies of this document are available online at www.asme.org.)
AMERICAN WELDING SOCIETY (AWS)
AWS A2.4 - Standard Symbols for Welding, Brazing, and Nondestructive Examination
(Copies of this document are available online at www.aws.org.)
1-3
ASTM INTERNATIONAL
ASTM B214 - Standard Test Method for Sieve Analysis of Metal Powders
ASTM B215 - Standard Practices for Sampling Metal Powders
ASTM B243 - Standard Terminology of Powder Metallurgy
ASTM B822 - Standard Test Method for Particle Size Distribution of Metal Powders and Related Compounds by Light Scattering
ASTM E3 - Standard Guide for Preparation of Metallographic Specimens
ASTM E8/E8M - Standard Methods for Tension Testing of Metallic Materials
ASTM E10 - Standard Test Method for Brinell Hardness of Metallic Materials
ASTM E18 - Standard Test Methods for Rockwell Hardness of Metallic Materials
ASTM E23 - Standard Test Methods for Notched Bar Impact Testing of Metallic Materials
ASTM E92 - Standard Test Methods for Vickers Hardness and Knoop Hardness of Metallic Materials
ASTM E112 - Standard Test Methods for Determining Average Grain Size
ASTM E407 - Standard Practice for Microetching Metals and Alloys
ASTM E1820 - Standard Test Method for Measurement of Fracture Toughness
ASTM E2651 - Standard Guide for Powder Particle Size Analysis
ASTM F3049 - Standard Guide for Characterizing Properties of Metal Powders Used for Additive Manufacturing Processes
(Copies of these documents are available online at www.astm.org.)
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)
ISO/ASTM 52900 - Additive manufacturing – General principles – Fundamentals and vocabulary
ISO/ASTM 52921 - Additive manufacturing – General principles – Part positioning, coordinates and orientation
(Copies of these documents are available online at www.iso.org.)
SAE INTERNATIONAL
SAE AMS2772 - Heat Treatment of Aluminum Alloy Raw Materials
SAE AMS-H-6875 - Heat Treatment of Steel Raw Materials
SAE AMS-H-81200 - Heat Treatment of Titanium and Titanium Alloys
(Copies of these documents are available online at www.sae.org.)
1-4
1-4.3 ORDER OF PRECEDENCE. In the event of a conflict between the text of this document and the references cited herein, the text of this document shall take precedence. In the event of a conflict between the base document and the appendix, the appendix takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been made.
1-5 DEFINITIONS.
a. Except as noted herein, terms related to AM shall be as specified in ISO/ASTM 52900.
b. Except as noted herein, terms related to powder shall be as specified in ASTM B243.
c. Except as noted herein, nondestructive testing (NDT) nomenclature and definitions shall be as specified in T9074-AS-GIB-010/271, Requirements for Nondestructive Testing Methods.
d. Except as noted herein, terms related to coordinate systems for AM shall be as specified in
ISO/ASTM 52921.
1-5.1 ACCEPTABLE. An item is acceptable when it complies with or conforms to the applicable standard or specification.
1-5.2 ACTIVITY. All sites of an organization under the same quality assurance management and using the same quality assurance and Process Control Plans performing work to which this document is applicable.
1-5.3 ADDITIVE MANUFACTURING (AM). The process of joining materials to make parts from 3D model data, usually layer upon layer, as opposed to subtractive manufacturing and formative manufacturing methodologies (in accordance with ISO/ASTM 52900).
1-5.4 AM AUTHORIZED REPRESENTATIVE. An AM authorized representative is specifically authorized to approve equipment, material, or procedures within the scope of this document for NAVSEA.