N6426721Q5273_QA_AMEND P0001.pdf
PDF 296 KB Posted
- Attached to
- Maritime Training
- Solicitation number
- N6426721Q5273
View the file
Other files
| File | Type | Posted |
|---|---|---|
| COMBINED SYNOPSIS _RFQ_N6426721Q5273 P0001.docx | DOCX document | |
| Attachment F - QASP.pdf | ||
| N6426721Q5273_SF30_AMEND P0001.pdf | ||
| ATTACHMENT D - CDRL A0005 STUDENT STATUS AND TESTING REPORT FILL-IN_SAMPLE.xls | XLS spreadsheet | |
| ATTACHMENT B - COURSE DESCRIPTION.docx | DOCX document | |
| ATTACHMENT E - CONTRACT DATA REQUIREMENT LISTS _CDRLs.pdf | ||
| COMBINED SYNOPSIS _RFQ_N6426721Q5273.docx | DOCX document | |
| ATTACHMENT C - CDRL A0003 CONTRACTOR PROGRESS_STATUS REPORT_FILL-IN _SAMPLE.xls | XLS spreadsheet | |
| COMBINED SYNOPSIS _INFORMATION SHEET.pdf | ||
| ATTACHMENT A - PRICE WORKSHEET.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
No. Reference Question Response Action
1 N/A
Will there be a phase-in period, from date of award to first class convening, for industry to set-up contractor facilities?
The Contractor shall be ready to receive the first student after the post award conference.
None
2 C 4.2
"Provide required classroom/course materials on the first day of each course:”
Does industry have discretion to establish a classroom/course materials design and development period during the base year prior to class scheduling in order to provide required materials on the first day of each course?
Courses shall meet the
International Maritime
Organization’s regulations in the
Standards of Training
Certification and Watchkeeping
(STCW) of 1978 for the standard of competence.
3 N/A
What is the anticipated number of students per class convening?
There is no anticipated number of students per class convening as it varies per course
Add C 3.6
The number of students will vary based on each course. Students may be seated with other / general population students; it is the discretion of the Contractor, if the
Contractor chooses to establish a cohort of students of same origin.
4 C 4.2
“Employ maximum use of bridge simulation devices to support the requested training and to enhance the fidelity of training provided.” Please clarify bridge simulation devices. Is Government requiring an actual bridge simulator or can this be CBT software on a PC?
See added information in section
C.4.2
Add: C.4.2
Bridge simulation devices to include a replication of major hardware items normally included on the
Bridge of a typical commercial ship and augmented with computer-based training/ testing (CBT) software on a computer
5 N/A
Are there any required lab equipment for training delivery or does industry have discretion to provide lab equipment that best suites our delivery approach?
The Contractor shall provide the lab equipment that best suites the delivery approach and adheres to the requirement of the contract.
6 N/A
Is there an incumbent contractor?
This is a new requirement.
7 L2 None
None Remove reference to hard copy submission
8 NA None
Add:
Section I:
52.204-19
52.204-20
Section K:
52.209-11
Section L:
L-209-H009
52.204-16
52.204-17
Remove
Section I:
52.212-4 (duplication)
9 J None None
Add:
Attachment F – QASP
Attachment G – Wage
Determination (location TBD)
File details come from the government source that posted it. Updated .