N6426721Q0058
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to update Section C, add attachments, provide answ ers to the questions from industry and to extend the solicitation date. All other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Mar-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6426721Q0058
X 9B. DATED (SEE ITEM 11)
28-Jan-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Mar-2021
CODE
NAVAL SURFACE WARFARE CENTER CORONA DIV.
1999 FOURTH STREET BLDG 510
NORCO CA 92860
N64267 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
2 | 11
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 22-Feb-2021 04:00 PM to 02-Apr-2021 10:00 AM.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
SCOPE OF WORK
SALES TAX EXEMPTION
The contractor is hereby advised that the United States Government and Agencies thereof are exempt from State and Local Government tax by virtue of Article 6 of the United States Constitution. No exemption certificate is required.
1.0 INTRODUCTION
The Naval Surface Warfare Center (NSWC), Corona Division has a requirement to clean and inspect B575 mechanical equipment associated to Air Handler 3 (AH3). This work includes repair damaged/missing insulation, changing filters, cleaning coils, supply registers and ductwork.
2.0 BACKGROUND
AH3 is located on the second floor of B544. AH3 covers the east and south side of the building spanning across multiple rooms. The ductwork is located approximately 10 above finished floor in the interstitial space between the ceiling tiles and corrugated roof deck. There is approximately 800 linear feet of ductwork of various sizes ranging from 34”x34” to 10”x10”.
Building occupants within AH3 Zones have reported organic fiber and particulates dispersing through the supply registers.
AH3 mechanical system includes interconnecting ductwork and the following components:
AH-3: 2nd Floor Mechanical Room 2307 FP-11: Hallway Room 2300 FP-23: Room 2301 FP-22: Room 2301 FP-21: Hallway Room 2400 FP-20: Hallway Room 2400 FP-19: Hallway Room 2400 Forty-five 2’ x 2’ Supply Registers
3.0 SCOPE
AH3 HVAC system shall be cleaned using mechanical cleaning methods designed to extract contaminants from within the HVAC system and safely removed from the facility. The HVAC system shall be visibly clean and capable of passing cleanliness verification methods in accordance with applicable industry standards.
The HVAC system includes any interior surface of the facilities air distribution system for conditioned spaces and/or occupied zones. This includes all heating, ventilation and Air Conditioning systems from the points where the air enters the system to the points where the air is discharged from the system. The return air grilles, return air ducts to the air handling unit, interior surfaces of the air handling unit, coil section, condensate drain pans, supply air ducts, fans, fan housing, fan blades, turning vanes, filters, filter housings, reheat coils, and supply diffusers are all considered part of the HVAC system.
3 | 11
4.0 APPLICABLE CODES AND STANDARDS
Work, materials, and equipment shall comply with the most restrictive of local, state, and federal authorities’ codes and ordinances or these plans and specifications. As a minimum, the installation shall comply with the current editions in effect 30 days prior to the receipt of bids of the following codes:
Document Type/No.
Title Date
29 CFR 1910 Occupational Safety and Health Standards for General Industry Current 29 CFR 1926 Safety and Health Regulations for Construction Current
ACR 2013 Assessment, Cleaning, and Restoration of HVAC Systems 2013
SMACNA Sheet Metal and Air Conditioning Contractors’ National Association: HVAC Duct Construction Standards – Metal and Flexible
Current
UFGS
01 14 00
Work Restrictions Current
EM 385-1-1 United States Army Corps of Engineers Safety and Health Requirements Manual
Current
5.0 REQUIREMENTS
5.1 The primary components of this project are, but not limited to:
5.1.1 HVAC System Cleaning & Restoration
5.1.2 HVAC System Inspection
5.2 Site Visit: A site visit shall be held at the location indicated in the SOW prior to close of the solicitation. The contractor shall field verify project constraints and ensure the quote accurately reflects the total costs of the project. The contractor is responsible for installing a complete system and all necessary actions to accomplish the requirements of the project as stated in section 5. Floor plans, maps and other drawings provided in this SOW are for general information and project orientation only and should be field verified before beginning work. Drawings provided by the Government may not be up to date and should not be considered to be as-built drawings.
5.3 Security: Reference attached UFGS Specs 01 14 00 – Work Restrictions.
5.4 Safety:
5.4.1 Contractor shall perform all work in accordance with the United States Army Corps of Engineers Safety and Health Requirements Manual (EM-385-1-1) and 29 CFR 1926 Safety and Health Regulations for Construction. Where more stringent safety and occupational health standards are set forth in these requirements and regulations, the more stringent standards shall apply. The contractor is required to keep the work site neat and in presentable conditions at all times. Contractor shall continuously maintain a safe working area. All debris shall be removed from the work site on a continual and daily basis, and at project completion. The contractor shall take special care to protect Government property. Any damage by contractor shall be returned to original condition.
5.4.2 The contractor is responsible for ensuring that all work under contract meets Federal OSHA standards.
The contractor is responsible for ensuring safe work performance of employees and subcontractors and bears sole responsibility for the safety of its employees. The contractor is expected to take all steps necessary to establish, administer, and enforce safety rules that will meet the current requirements of Federal Occupational Safety and Health Administration (OSHA).
5.4.3 The contractor is responsible for ensuring that all work under contract meets state OSHA standards and local requirements. These standards will apply for the contractor activity on federal property within the respected state.
5.5 Environmental
5.5.1 The Contractor shall perform work under this contract consistent with the policy and objectives identified in the installation’s Environmental Management System (EMS). The Contractor shall
4 | 11 perform work in a manner that conforms to objectives and targets, environmental programs and operational controls identified by the EMS. The Contractor will provide monitoring and measurement information as necessary to address environmental performance relative to environmental, energy, and transportation management goals. In the event an EMS nonconformance or environmental noncompliance associated with the contracted services, tasks, or actions occurs, the Contractor shall take corrective and/or preventative actions. In addition, the Contractor shall ensure that its employees are aware of their roles and responsibilities under the EMS and how these EMS roles and responsibilities affect work performed under the contract.
5.5.2 The Contractor is responsible for ensuring that their employees receive applicable environmental and occupational health and safety training, and keep up to date on regulatory required specific training for the type of work to be conducted onsite. All on-site Contractor personnel, and their subcontractor personnel, performing tasks that have the potential to cause a significant environmental impact shall be competent on the basis of appropriate education, training or experience. Upon contract award, the Contracting Officer’s Representative will notify the installation’s EMS coordinator to arrange EMS training. The installation’s EMS coordinator shall identify training needs associated with environmental aspects and the EMS coordinator shall identify training needs associated with environmental aspects and the EMS, and arrange training or take other action to meet these needs. The Contractor shall provide training documentation to the contracting Officer. The installations EMS coordinator shall retain associated records.
5 | 11
5.6 Work Hours:
5.6.1 Hours of operation are Saturday and Sunday, 0730-1600 (not including all Federal or State Holidays).
Noise shall be kept to a minimum since the unaffected spaces within the facility will continue to be occupied during construction.
5.6.2 Badges must be picked up Monday-Friday, 0730 - 1130, as the Badging Office is not open on the weekends.
5.6.3 All work that secures HVAC, electrical, voice and data shall be coordinated with NSWC building representative or PM. The contractor is responsible for submitting a work schedule that shall be reviewed and approved by the contracting office.
5.6.4 In the event construction work interferes with onsite-scheduled work, contractor may be required to work evenings to complete the installation. The final schedule shall be approved by the Contracting Officer.
5.7 Execution
5.7.1 HVAC System Inspection: Prior to the commencement of any cleaning work, the HVAC system cleaning contractor shall perform a visual inspection of the HVAC system to determine appropriate methods, tools, and equipment required to satisfactorily complete the project. The cleanliness inspection should include air handling units and representative areas of the HVAC system components and ductwork.
5.7.2 Site Evaluation and Preparations: Contractor shall conduct a site evaluation, and establish a specific coordinated plan, which details how each area of the building will be protected during the various phases of the project.
5.7.3 Cleaning and Restoration Procedures: All cleaning and restoration procedures shall achieve the minimum level of visibly clean or the specified level of cleanliness verification as defined in the contractual documents for the components within the project scope.
5.7.4 Containment: Debris removed during cleaning shall be collected and precautions must be taken to ensure that debris is not otherwise dispersed outside the HVAC system during the cleaning process.
5.7.5 Service Openings:
5.7.5.1 The contractor shall utilize service openings as required for proper cleaning of the HVAC system for physical and mechanical entry and inspection.
5.7.5.2 Service openings may be needed to perform assessment, cleaning and restoration procedures.
5.7.5.3 Service openings installed into the system shall not degrade the structural, thermal, or functional integrity of the system.
5.7.5.4 Service openings shall be created in a manner that allows for proper closure.
5.7.5.5 Service openings shall not hinder, restrict or alter the airflow within the air duct.
5.7.5.6 Service opening construction materials and methods shall comply with industry standards and local codes, using materials acceptable under those standards and codes.
5.7.5.7 Materials used in the fabrication of duct access doors and permanent panels shall be those classified for flammability and smoke spread if the material is exposed to the internal airstream.
These materials are classified as having flame-spread rating of not over 25 without evidence of continued progressive combustion and a smoke-developed rating of not over 50, as determined by UL723.
5.7.5.8 All tapes used in the installation and closure of service openings shall meet the requirements of
UL181A.
5.7.5.9 All service openings shall comply with applicable UL, SMACNA and NFPA standards, as well as local, regional, and state codes.
5.7.6 Service Panels:
5.7.6.1 Service panels used for closing service openings in the HVAC system shall be of an equivalent gauge or heavier so as to not compromise the structural integrity of the duct.
5.7.6.2 Service panels used for closing service openings shall be mechanically fastened (screwed or riveted) at minimum every 4” on center. The panel shall overlap the ductwork surfaces by a minimum of 1” on all sides.
5.7.6.3 Service panels used for closing service openings shall be sealed with gaskets, duct sealants, mastic or tape.
6 | 11
5.7.7 Fibrous Glass System Service Openings
5.7.7.1 Access and closure of service openings installed in fibrous glass shall be created and closed in such a manner that there are no exposed fibrous glass edges within the system common to the airstream.
5.7.7.2 Any fibrous glass removed during the installation of a service opening shall be repaired or replaced with like materials of the same thickness so that there are no breaks or openings that would degrade the R-value, service rating or vapor/air barrier characteristics.
5.7.8 Cleaning and Restoration of HVAC Systems: HVAC systems shall be cleaned by using a suitable agitation device to dislodge contaminants from the HVAC component surface and then capturing the contaminants with a vacuum collection device.
5.7.9 Wet Cleaning, Power Washing, and Steam Cleaning: Wet cleaning, power washing, steam cleaning and any other form of wet process cleaning of HVAC system components shall not damage or result in subsequent damage to the components. Cleaning agents or water shall never be applied to electrical, fibrous glass or other porous HVAC system components.
5.7.10 Vacuum Collection Equipment: Vacuum collection equipment shall be operated continuously during cleaning. The collection equipment shall be used in conjunction with agitation tools and other equipment to convey and collect debris and prevent cross-contamination of dislodged particulate during the mechanical cleaning process.
5.7.11 Air-Handling Unit (AHU) Cleaning: AHU coils, fans, condensate pans, drains and similar non-porous surfaces shall be wet cleaned in conjunction with mechanical methods.
5.7.12 Air Duct Cleaning: Air ducts shall be cleaned to remove all non-adhered substances.
5.7.12.1 Air ducts shall be accessed through service openings in the system that are large enough to accommodate mechanical cleaning procedures and allow for verification.
5.7.12.2 Air ducts shall be cleaned using mechanical agitation methods to remove particulate, debris, and surface contamination.
5.7.12.3 Dislodged substances shall be captured with a vacuum collection device.
5.7.12.4 Cleaning activities shall not damage any HVAC components.
5.7.13 Supply Registers: Registers, grilles, diffusers and other air distribution devices shall be removed if possible, properly cleaned, and shall be restored to their previous position.
5.7.14 Coil Surface Cleaning: When coil cleaning is performed, both upstream and downstream sides of each coil section shall be accessed for cleaning.
5.7.15 Dampers: Dampers and any air-directional mechanical devices shall have their position marked prior to cleaning and shall be restored to their marked position after cleaning.
5.7.16 Resurfacing Fibrous Glass Surfaces: Resurfacing shall be performed when thermal acoustic fibrous glass components, including air duct liner or duct board in the HVAC system, are considered friable, or exhibit visual signs of abrasion, degradation, or other undesirable conditions.
5.7.17 Thermal-Acoustic HVAC Insulation Replacement: All metal surfaces of the duct system that have undergone removal of degraded thermal-acoustic material shall have the base surface scraped clean and be free of loose, visible debris prior to installation of new insulation.
5.7.17.1 All materials used for insulation replacement within the HVAC system shall meet or exceed the specifications of the original materials or current applicable codes. Installation of the replacement materials shall be in accordance with the manufacturer’s written instructions.
5.7.17.2 Installation of thermal-acoustic HVAC insulation common to the air stream shall comply with current SMACNA, NAIMA and other applicable codes and standards.
5.7.18 Cleanliness Verification: The HVAC system shall be inspected visually to ensure that no visible contaminants are present.
5.7.18.1 If no contaminants are evident through visual inspection, the HVAC system shall be considered clean.
5.7.18.2 If visible contaminants are evident through visual inspection, those portions of the system where contaminants are visible shall be re-cleaned and subject to re-inspection for cleanliness; the owner reserves the right to further verify system cleanliness through Surface Comparison Testing.
5.7.19 HVAC System Repair: HVAC components found to have pre-existing damage during the cleaning process shall be documented and brought to the attention of the building owner or representative.
7 | 11
5.7.20 Post-Project Documentation: At the conclusion of the project, the contractor shall provide a report to the owner indicating the following:
5.7.20.1 Success of the cleaning project, as verified through visual inspection.
5.7.20.2 Areas of the system found to be damaged and/or in need of repair.
5.7.21 Administrative Requirements
5.7.21.1.1 Schedule: Within 15 calendar days after contract award, submit the Project Schedule. The
Project Schedule shall define the planned operations for approval.
5.7.21.1.2 Contractor Personnel Roster
5.7.21.1.3 Schedule of Values: Provide a detailed breakdown of the contract price, giving quantities for each of the various kinds of work, unit prices and extended prices. Within 15 calendar days from notice of award, prepare and deliver to the Contracting Officer a Schedule of Values. Payments will not be made until the Schedule of Values has been submitted to and accepted by the Contracting Officer.
5.7.21.1.4 Test Reports
5.7.21.1.5 Certificates
5.7.22 Minimum Insurance Requirements: Provide the minimum insurance coverage required by FAR 28.307- 2 Liability during the entire period of performance under this contract. Provide other insurance coverage as required by California State law.
5.7.23 Kick-Off Meeting: After contract award and before any of the work commences, Contractor shall coordinate a Kick-Off Meeting. All major players, Contractor, Subcontractors, Government personnel shall attend the Kick-Off Meeting. The purpose of the Kick Off meeting is to orient the Contractor with NSWC Corona Policies and Requirements and to discuss the details of the project.
6.0 GOVERNMENT FURNISHED PROPERTY
6.1 Government Furnished Material
N/A
6.2 Government Furnished Equipment
N/A
6.3 Government Furnished Information
N/A
7.0 DELIVERABLES
NUMBER NAME
A001 List of Contractor Personnel A002 Weekly Meeting Agenda and Minutes A003 Post Project Verification Test Report A004 Construction Schedule A005 Schedule of Values A006 HVAC Ductwork Drawings
SECTION 01 14 00
WORK RESTRICTIONS
11/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred
8 | 11 to within the text by the basic designation only.
U.S. Code (USC)
8 USC 1101 Definitions
10 USC 6011 Navy Regulations
1.2 SUBMITTALS
Submit the following:
List of Contact Personnel
1.3 SPECIAL SCHEDULING REQUIREMENTS
a. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.
b. The building will remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.
c. The work under this contract requires special attention to the scheduling and conduct of the work in connection with existing operations. Identify on the construction schedule each factor which constitutes a potential interruption to operations.
1.4 CONTRACTOR ACCESS AND USE OF PREMISES
1.4.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.
1.4.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.4.1.2 Installation Access
Obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/om/dbids.html. No fees are associated with obtaining a DBIDS credential.
Participation in the DBIDS is mandatory. Requests shall be submitted a minimum of 14 days in advance.
1.4.1.2.1 Registration for DBIDS Registration for
DBIDS is available at:
https://www.cnic.navy.mil/om/dbids.html. Procedure includes:
a. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.
b. Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/om/dbids.html.
c. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, finger prints, base restriction and several other assessments. Complete background check duration is 14 calendar days from completion of SECNAV 5512/1.
d. Upon successful completion of the enrollment process, the Contractor employee will be issued a
DBIDS credential, and will be allowed to proceed to worksite.
1.4.1.2.2 DBIDS Eligibility Requirements
Throughout the length of the contract, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.
An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification. The Government is the final authority.
1.4.1.2.3 DBIDS Notification Requirements
a. Immediately report instances of lost or stolen badges to the Contracting Officer.
b. Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:
(1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials.
(2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.
1.4.1.2.4 Visitor Notifications
If work is being performed in the inner compound, completion of SECNAV 5530/11 is required at least 7 days prior to needing access to the inner compound.
After the Personnel has been vetted and found favorable, the Contractor shall fill out a Visitor Notification Form (NSWCCORDIV 5530/11).
a. Completed forms shall be submitted to Construction Manager a minimum of 7 days before access to base is needed.
b. Visitor Notifications shall be done per Company/Trade.
1.4.1.2.4.1 On the Spot Vetting
Personnel applying for On the Spot Vetting at the Base Visitor Control Office are subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred. This process can take a minimum of 2 hours. Advance notice to Contracting Officer Representative is required.
1.4.1.3 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas.
This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines.
The Contracting Officer will identify designated smoking areas.
1.4.2 Working Hours
Working hours must consist of a 10 hour period, between 7:00 a.m. and 5:00 p.m., Saturdays and Sundays.
1.4.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval. Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.
1.4.4 Occupied Buildings
The Contractor shall be working around existing buildings which are occupied. Do not enter the buildings without prior approval of the Contracting Officer.
1.4.5 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and
Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR
HOURS.
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air are considered utility cutovers pursuant to the paragraph WORK
OUTSIDE REGULAR HOURS.
d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services.
The Government will operate the control devices as required for normal conduct of the work.
The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
ATTACHMENTS
The following document(s), exhibit(s), and other attachment(s) form a part of this contract:
Attachment: 1 Davis-Bacon Act Wage Determination - CA20210017 (1/22/2021)
Appendix:Appendix 1 Bldg 544 Duct Cleaning Drawings
Contract Data Requirements List, DD Form 1423 – Exhibit
NUMBER NAME
A001 List of Contractor Personnel A002 Weekly Meeting Agenda and Minutes A003 Post Project Verification Test Report A004 Construction Schedule A005 Schedule of Values A006 HVAC Ductwork Drawings