26-SIMACQ-E30-0034_Cell_Phone_Repeater_Questions_Answers_V2_8072026.pdf

PDF 64 KB Posted

Attached to
26-SIMACQ-E30-0034 Cell Phone Repeater Removal and Replacement
Solicitation number
N6339426Q4056
Issued by

About this file

This is a Questions and Answers document from a federal contracting solicitation addressing cellular repeater system installation requirements for two buildings.

Building 522 requires coverage across 2 floors totaling approximately 24,400 square feet and currently uses a NODE A repeater system. Building 523 requires coverage across 1 floor of approximately 12,100 square feet and currently uses a SureCall Force5 repeater system. Both buildings feature cinder block construction. Complete cellular coverage is required in all spaces within both buildings, with sufficient 4G/5G signal to provide consistent and reliable voice and data service for AT&T, Verizon, T-Mobile, and all other carrier services. Prospective offerors are permitted to conduct site visits and RF site surveys before submitting quotations, with instructions provided in solicitation Section L. Post-installation functional testing is required, and the completed system must meet specified coverage and performance requirements. Cyber Maturity Model Certification (CMMC) is required for this contract; detailed requirements are located in Section M of the Solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building Information: What are the approximate square footage and number of floors for each building?

Answer: Bldg. 522 – 2 Floors, approx. 12,200 SF each, 24,400 SF total Bldg. 523 – 1 Floor, approx. 12,100 SF

Existing Repeater Systems: Can the Government provide any available information regarding the existing repeater systems, including the equipment currently installed, system configuration, and any available documentation?

Answer: Bldg. 522 uses a NODE A; Bldgs. 523 uses SureCall Force5

Site Visit and RF Site Survey: Will prospective oƯerors be permitted to visit the site to inspect the existing repeater systems and conduct an RF site survey before submitting quotations? If so, please provide the registration process and any site-access requirements.

Answer: Site visit instructions are already included in the solicitation section L.

Coverage and Acceptance Requirements: Beyond the post-installation functional test described in the Statement of Work, are there specific coverage or performance requirements that the completed system must meet? If so, please identify the required commercial cellular carriers and any applicable signal-strength, coverage, testing, or acceptance criteria.

Answer: AT&T, Verizon, T-Mobile and support all other carrier services. Require suƯicient signal to provide consistent and reliable voice and data service.

How many floors are in each building?

Answer: See answer to question 9.

What are the building types and primary construction materials that may aƯect cellular signal propagation?

Answer: Cinder block construction

Which areas within Buildings 522 and 523 are required to receive cellular coverage?

Answer: Complete coverage in all spaces.

Are there any specific acceptance criteria or RF coverage performance requirements that the completed system must meet?

Answer: Require suƯicient 4G/5G signal to provide consistent and reliable voice and data service for the following Cellular carriers. AT&T, Verizon, T-Mobile and support all other carrier services.

Is Cyber Maturity Model Certification (CMMC) required?

Answer: Yes. See Section M of the Solicitation for details.