This is a Questions and Answers document for RHIB Training Solicitation N6339426Q4020, a federal training contract opportunity. The document addresses vendor inquiries regarding contract requirements and clarifies ambiguities in the underlying solicitation documents.
The solicitation involves providing Rigid-Hull Inflatable Boat (RHIB) training courses, specifically SUW13 and SUW22 training programs. Each SUW13 class requires one MK3 and one MK4 RHIB, while fuel costs must be included in contractor proposals based on receipt of equipment. Curriculum development for both courses—120 instructional hours for SUW13 and 40 instructional hours for SUW22—should be primarily instructor-led training (ILT) and must be priced separately when bidding CLINs 0001 and 0013, as these CLINs cover only training execution. Instructor Planning Documents must be submitted within one calendar week of CLIN activation when less than 100 days of advance notice is provided. No Interactive Multimedia Instruction (IMI) is required. The government will not provide CAC cards or government laptops to instructors, and no reimbursable CLIN exists for emergent repairs; all parts and materials will be provided via a tool kit. Clearance eligibility to SECRET level is required. Technical capability evaluation is based solely on the vendor's ability to provide a quote meeting Statement of Work requirements, with no separate technical response needed. The solicitation page limit is 10 pages for technical, price, and past performance sections combined. Government does not track contractor fuel usage or work hours, and no separate fuel CLIN will be added at this time. The small business set-aside applies to NAICS 611519, and the Form 1440 is not applicable to this solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question and Answers for RHIB Training Solicitation N6339426Q4020
• PWS.6.2 Clarify clearance requirements - 6.2 states no requirement, 4.1 states SECRET Rqd.
o Section 4.1 does not state anything regarding clearance o Section 4.2 only indicates: “Eligible for, or hold a valid SECRET clearance.”
• PWS.8.1 Clarify SUW 13 if 4 total boats?
o Per SOW 8.1.1: “Each SUW13 class will be provided with one (1) MK3 and one (1) MK4 RHIB.”
• PWS 8.2 Clarify operating hours and expected fuel burn for FFP quote please provide historic fuel usage.
o Government does not track contractor fuel usage. As per 8.2.2, fuel costs shall be included in contractor’s prorposal and should be based upon:
Receipt of RHIB.
• Will there be a reimbursable CLIN for emergent repairs to cover parts and materials?
o Any parts or materials for emergent repairs will be provided via a tool kit.
SOW 8.3
• What are the historic work hours and overtime hours?
o The government does not track the work hours/overtime hours of the contractor as each course is a flat fee.
• Section L - what are the page limits for the solicitation technical, price and past performance?
o 10 Pages
• Section M states that no Past Performance is required, and that past performance will be sourced from web-based sources IAW DRAFS 213-106-2 -however this clause does not address PP in any way, only Risk IAW 204.7603.
Can the government clarify how a proposal will be evaluated as a Pass/Fail?
o During quote reviews we will consider risk factor in – PIEE/ SPRS
• Technical capability IAW Section M states it is "based on vendor providing a quote based o the statement of work. Clarify that the ability to provide a quote = "acceptable" and that no technical response is required?
• Vendors must meet requirement of Statement of work
• Will INSTs be provided CAC cards and government laptops?’’ o No
• Small business set aside for 611519 is $21M, the Form 1440 states $1M for the size standard - plese clarify?
o 1440 Form is not applied N/A
• SOW 3.1 Instructor Planning Docs , A.1 Requirements Request confirm that all development of curriculum materials (Instructor Planning Documents, CDRLs A001-A006) for Part A SUW13 should be included, and priced, with CLIN 0001 SUW13 Course?
o CLIN 0001 only include the execution of the training. Curriculum development effort should be included when pricing out CLINs.
• SOW 3.1 Instructor Planning Docs , B.1 Requirements Request confirm that all development of curriculum materials (Instructor Planning Documents, CDRLs A001-A006) for Part B SUW22 should be included, and priced, with CLIN 0013 SUW22 Course?
o CLIN 0013 only include the execution of the training. Curriculum development effort should be included when pricing out CLINs.
• SOW 3.1 Instructor Planning Docs In order to accurately price CDRLs A001- A006, request confirm that all 120 instructional hours of SUW13 curriculum, and all 40 instructional hours of SUW22 curriculum, are to be developed as Instructor Led Training (ILT) and not Interactive Multimedia Instruction (IMI)?
o Curriculum development should be primarily ILT, but fall underneath the requirements listed in Part A A.1 and Part B B.1
• SOW 2.13 NAVEDTRA 136 What Level of Interactivity (Level 1-4), as shown in NAVEDTRA 136, is required for the SUW22 curriculum and SUW13 curriculum?
o Interactive Multimedia Instruction was not expected as part of the curriculum.
• SOW 3.1, B.2 Training Dates SOW 3.1 requires that Instructor Planning Documents (for SUW22) are to be reviewed and approved 100 days prior to B2 (SUW22) Training Dates. However, SOW B.2 states that “SUW22 training requests will be provided to the contractor NLT 35 days prior to expect(ed) training start for acceptance.” How will contractor deliver, and USG approve, SUW22 Instructor Planning Documents 100 days prior to SUW22 course start date if only 35 days of prior notice of award/exercise of the supporting Part B Option CLIN is provided?
o The intent was to have the instructor planning documents in hand well before convene of first course. In the event that the requirement does not have a 100 day lead, contractor shall submit within one calendar week from notification and acceptance of CLIN activation.
• SOW 8.2 FUEL What is the historical total fuel use for each SUW13 and SUW22 course convening?
o Government does not track contractor fuel usage. As per 8.2.2, fuel costs shall be included in contractor’s proposal.
• SOW 8.2 FUEL Is the historical usage of the RHIBs within each course convening in line with the new SOW requirements; two RHIBs for SUW13 and one RHIB for SUW22?
o Government does not track contractor fuel usage. As per 8.2.2, fuel costs shall be included in contractor’s proposal.
• SOW 8.2 FUEL Would the government consider adding a CLIN for SUW13 and SUW22 that is an ODC Not To Exceed government plug number for fuel costs?
o No plan to add fuel CLIN at this time.