N6339418R0011-0004.pdf
PDF 154 KB Posted
- Attached to
- Common Processing System (CPS) Federal contract opportunity
- Solicitation number
- N6339418R0011
About this file
N6339418R0011-0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N6339418R0011-0006.pdf | ||
| N6339418R0011-0005.pdf | ||
| J-S-2_-_Price-Cost_Template_-_REV_N6339418R0011-0005.xlsx | XLSX spreadsheet | |
| N6339418R0011-0003.pdf | ||
| N6339418R0011-0002.pdf | ||
| N6339418R0011-0001.pdf | ||
| J-3_-_GFP_Attachment.xlsx | XLSX spreadsheet | |
| J-S-2_-_Price-Cost_Template.xlsx | XLSX spreadsheet | |
| J-S-1_-_Past_Performance_Questionnaire.doc | DOC document | |
| J-1_-_Contract_Data_Requirements_List,_DD_Form_1423__A001_through_A066.pdf | ||
| N6339418R0011.pdf | ||
| J-2_-_Contract_Security_Classification_Specification,_DD_Form_254.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to provide responses to all industry questions received to date.
1. CONTRACT ID CODE PAGE OF PAGES
S 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Nov-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6339418R0011
X 9B. DATED (SEE ITEM 11)
14-Sep-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Nov-2018
CODE
N63394
PORT HUENEME DIVISION 4363 MISSLE WAY
PORT HUENEME CA 93043-4307
N63394 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6339418R0011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
Q&A - AMENDMENT 0004
1. QUESTION: Section 7 of the SOW identifies "estimated" travel requirements for Engineering Services and ORDALT Kit Installation Services, though Section B Supplies or Services and Prices, requires offerors to propose these services on a FFP basis. However, in Section 7 the government did not provide a direct correlation as to which travel requirements are applicable to which Item No. in Section B for pricing purposes. Because there is no direct correlation provided, each offeror must submit a FFP for these services for each Item No. based on assumptions. Therefore, request that the government provide the required correlation between Section 7 and Section B to ensure that offerors are proposing to the same scope.
RESPONSE: Travel costs incurred in support of the Engineering Services and ORDALT Kit Installation Services CLINs will be reimbursed under the associated ODC CLINs. Actual travel requirements will be directed by technical instruction as required after contract award. As stated in Section L, paragraph 10.2(b)(iii): “For travel and ODCs – CLINs 0102 through 0106: Offerors shall use the Government estimated burdened maximum amount delineated in the attachment in Section J of the solicitation. Insert the burdened maximum prices into Section B of the submitted SF 33.” The prices required for the FFP services CLINs are inclusive of all labor and associated burdens, including profit, and do not include travel costs or ODCs associated with these services. Again, the travel costs will be reimbursed under the applicable ODC CLIN for the period in which the services are performed. For example, if the Government exercises one of the FFP option CLINs for ORDALT Kit Installation Services during the base period, any allowable, allocable travel costs incurred in support of those services would be billed against the ODC CLIN for the base period (i.e., CLIN 0102). Similarly, if the Government exercises one of the FFP CLINs for ORDALT Kit Installation Services during Option Period 1, any allowable, allocable travel costs would be billed against the ODC CLIN for Option Period 1 (i.e., CLIN 0103).
2. QUESTION: Offerors are required to submit a Cover Letter in Volume 4 Price/Cost. However, the information required to be contained within the letter is not germane just to Volume 4 but to all the volumes. Request that the Cover Letter be removed from the required submittals in Volume 4 and be submitted as a stand-alone document outside all of the volumes.
RESPONSE: Offerors are required to submit one Cover Letter in accordance with Section L, paragraph 2.4(a)(i)-(xiv). Additionally, each volume shall include the information listed in Section L, paragraph 3.3(a) – (h).
(End of Summary of Changes)