RFP_N63394-16-R-0008_Amendment_03_QA's_1-14-2016.pdf

PDF 198 KB Posted

Attached to
Tactical Tomahawk Weapons Control System (TTWCS) Parts Manufacturing
Solicitation number
N63394-16-R-0008
Issued by

About this file

Additional RFP Questions and Answers

View the file

Other files

File Type Posted
Attachment_2_-_Pricing_Matrix_Rev_D_01-28-2016.xlsx XLSX spreadsheet
RFP_N63394-16-R-0008_Amendment_05_QA's_1-29-2016.docx DOCX document
N63394-16-R-0008_TTWCS_Manufacturing_Amendment_5_Summary_1-29-2016.docx DOCX document
20534261(G).pdf PDF
8554696(C).pdf PDF
PL20534296(D).pdf PDF
8501808(A).pdf PDF
PL20534657(B).pdf PDF
RFP_N63394-16-R-0008_Amendment_04_QA's_1-21-2016.pdf PDF
N63394-16-R-0008_TTWCS_Manufacturing_Amendment_4_Summary_1-21-2016.pdf PDF
N63394-16-R-0008_TTWCS_Manufacturing_Amendment_3_Summary_1-14-2016.pdf PDF
PL20534664(B).pdf PDF
Attachment_2_-_Pricing_Matrix_Rev_C_01-14-2016.xlsx XLSX spreadsheet
TTWCS_Manufacturing_Drawings_Additional_2016-01-05.zip ZIP file
N63394-16-R-0008_TTWCS_Manufacturing_Amendment_2_Summary_1-8-2016.pdf PDF
8605468(A).pdf PDF
70803(A).pdf PDF
N63394-16-R-0008_TTWCS_Manufacturing_Amendment_1_Conforming_12-22-2015.docx DOCX document
RFP_N63394-16-R-0008_QA's_12-22-2015.docx DOCX document
70802(D).pdf PDF
N63394-16-R-0008_TTWCS_Manufacturing_Amendment_1_Summary_2-22-2015.docx DOCX document
Attachment_2_-_Pricing_Matrix_Rev.A_12-22-2015.xlsx XLSX spreadsheet
TTWCS_Manufacturing_Drawings_1_of_12.zip ZIP file
TTWCS_Manufacturing_Drawings_11_of_12.zip ZIP file
N63394-16-R-0008_RFP.pdf PDF
Attachment_3_-_Past_Performance_Questionnaire.doc DOC document
TTWCS_Manufacturing_Drawings_7_of_12.zip ZIP file
TTWCS_Manufacturing_Drawings_4_of_12.zip ZIP file
Attachment_2_-_Pricing_Matrix.xlsx XLSX spreadsheet
TTWCS_Manufacturing_Drawings_3_of_12.zip ZIP file
TTWCS_Manufacturing_Drawings_12_of_12.zip ZIP file
TTWCS_Manufacturing_Drawings_2_of_12.zip ZIP file
TTWCS_Manufacturing_Drawings_9_of_12.zip ZIP file
TTWCS_Manufacturing_Drawings_6_of_12.zip ZIP file
TTWCS_Manufacturing_Drawings_5_of_12.zip ZIP file
TTWCS_Manufacturing_Drawings_8_of_12.zip ZIP file
TTWCS_Manufacturing_Drawings_10_of_12.zip ZIP file
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP N63394-16-R-0008 POTENTIAL OFFEROR’S QUESTIONS AND ANSWERS PROVIDED

BY REQUIRING ACTIVITY:

No. Questions Answers

1. Pricing Matrix Index #278, 20534297G01, BRACKET, SLIDE MOUNTING quantity is listed as 888. The solicitation lists the quantity as 908. Please clarify and correct whichever quantity is erroneous.

Index #278 should have MAX quantity of 908.

The excel worksheet is updated to show 908.

2. Pricing Matrix Index #266, 20534143G01, CABLE ASSEMBLY (W11) quantity is listed as 58. The solicitation lists the quantity as 66. Please clarify and correct whichever quantity is erroneous.

Index #266 should have MAX quantity of 66.

The excel worksheet is updated to show 66.

3. The Drawing number for Index #288 on the Pricing Matrix appears to be wrong. Should this be 20534628?

The excel worksheet is updated to show 20534628.

4. Drawing 8554696, V2 ATDC FRAME PROCUREMENT KIT provided as part of the technical data package is Revision B.

Revision C is the Government’s latest version of this drawing.

Will the Government provide and buy in accordance with Revision C? Or, is outdated Revision B being purchased?

8554696 Revision C is the latest and shall be used for this contract. The excel worksheet is updated to show Revision C.

5. Drawing 20534657, STANDOFF, MODIFIED, states: “SEE SEPARATE PARTS LIST”. This parts list is not provided as part of the technical data package. Please provide.

The parts list drawing was missing and is now being provided.

6. Drawing 7110988, EXTRUSION, T-SLOT PROFILE, Note 1 states that overall length tolerance will be within + or - 0.2mm of specified length. These extrusions are made to be cut to length by the supplier. The suppliers only guarantee + or – 1.0mm. Is the 0.2mm tolerance required or can it be changed to 1.0mm?

No, the Contractor cannot change any Government drawing requirements. The Government drawing requirements shall be used. "Proposal Estimate Qty" is the quantity the offeror will use to propose for evaluation.

Government provided the proposal estimate quantity in order to help the offeror to get an idea of the quantity of a CLIN should that CLIN item is ordered in a delivery order.

7. On the revised Attachment 2 - Pricing Matrix Rev A 12-22- 2015, the column "Proposal Estimate Quantity" was added.

Is this estimated quantity cover the life of the contract or individual orders or annual demand?

“Proposal Estimate Qty” is the quantity the offeror will use to propose for evaluation purposes.

Government provided the proposal estimate quantity in order to help the offeror to get an idea of the quantity of a CLIN should that CLIN item is ordered in a delivery order.

8. When reviewing the Parts list for Drawing # 8554696 “v2 ATDC Frame Kit”. We want to clarify that our Navy expects this complete kit per the parts list, including all fabricated metal pcs. These frame pcs are listed separately in the CLIN Deliverables? Just checking because, the frame itself is pretty pricy.

For CLIN 0254, the Government expects the entire kit to be manufactured, assembled and delivered as defined by drawing 8554696.

Certain manufactured pieces are listed separately in other CLINs, and may be independently ordered as separate deliverables. Note that drawing 8554696 references drawing 8501850 only as a diagram on what the assembled kit will look like.

Contractors shall NOT include electronics parts shown on drawing 8501850 in their quote, drawing 8501850 is for reference only.

9 The provided Price matrix distributed in attachment 2. The cell calculations are multiplying cells [K] Estimated qty.

multiplied by [L] estimated unit price equaling [M] Proposal Contract Amount (Max. Qty x Prop. Est. Unit Price). K*L=M.

As the equation in cell includes minimum yet the title in column states maximum.

Cell formula is revised to calculate maximum quantity multiplied by proposal estimate unit price. (I*L=M)

10 We are not sure if you want the price for the Maximum or Minimum quantities.

Solicitation Amendment 1 already states: " The Government does not guarantee the award of the maximum quantities or “Proposal Estimate Quantity” in Attachment # 2, and the unit price should be proposed accordingly. Quantities for each order also cannot be guaranteed."

Government provided the proposal estimate quantity in order to help the offeror to get an idea of the quantity of a CLIN should that CLIN item is ordered in a delivery order.

No further questions.