Q&A.docx
DOCX document 13 KB Posted
- Solicitation number
- N6279319R0027
About this file
Questions and Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q&A_11.5.19.docx | DOCX document | |
| N6279319R0027_Change_Closing_Date.docx | DOCX document | |
| Supply_Deck_Matrix.xlsx | XLSX spreadsheet | |
| N6279319R0027_REV_1.docx | DOCX document | |
| N6279319R0027_SOLICITATION.docx | DOCX document | |
| NSWC_SFC-2_WhatMakesNavy.pdf | ||
| OPNAVINST_9640.1B_Shipboard_Habitability_Program.pdf | ||
| NSWC_SFC-2_FurnReq.pdf | ||
| NNS_ACCESS_VISIT_REQUEST_INST.doc | DOC document | |
| N6279319R0027_SOLICITATION.docx | DOCX document | |
| NSWC_SFC-2_Instructions.pdf | ||
| GSO_Hab_Excerpts.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers
Q1: Paragraph 23.2 states "Cabinetry should be fabricated from aluminum extrusion, aluminum sheeting or stainless steel." Paragraph 23.6 states "All work performed must be in accordance with Shipboard Navy Standards. In multiple paragraphs throughout the statement of work, there are references for use of "fine wood". Is it the intent of the Government to issue a Deviation From Specification for use of non-Shipboard Navy Standard material for this Solicitation?
A: YES
Q2: There will be multiple pickups and deliveries needed during this contract. Will drive in passes to the Newport News Shipyard be provided to the Contractor?
A: No; S/F will coordinate material delivery utilizing organic methods.
Q3. Can HII-NNS or CVN 73 provide an On-site office for the Contractor?
A: YES
Q4: Will the contractor be given space on the main deck to set up a lockable caged area for material and tool staging?
A: YES
File details come from the government source that posted it.