Blank BOQ_N6274224R6711.xlsx

XLSX spreadsheet 48 KB Posted

Attached to
D/B UFC Vehicle Maintenance & Parking Bays and Training Area Facility, FMSS, Philippines
Solicitation number
N6274224R6711
Issued by

About this file

This document appears to be a Bill of Quantities (BOQ) related to a federal contract opportunity. The BOQ provides a detailed breakdown of the estimated quantities, unit costs, and total costs for the design and construction of three facilities at Fort Magsaysay (FMSS) in the Philippines: a Maintenance Parking Bay Facility, a Concrete Access Road, and a Covered Training Area Facility.

The associated federal contract opportunity is Solicitation Number N6274224R6711, which is for the "D/B UFC Vehicle Maintenance & Parking Bays and Training Area Facility, FMSS, Philippines". This is a design-build project with an estimated magnitude between $500,000 and $1,000,000 for the Maintenance Parking Bay Facility, between $250,000 and $500,000 for the Concrete Access Road, and between $250,000 and $500,000 for the Covered Training Area Facility. The projects must be designed and constructed in accordance with Unified Facilities Criteria (UFC), International Building Codes (IBC), or Philippine Codes. A pre-proposal site visit is tentatively scheduled for June-July 2024, and interested contractors are required to submit a Base Access Request by May 21, 2024.

View the file

Other files

File Type Posted
AMD2_6711_Host Nation Requirements.pdf PDF
RELEASED AMD1_6711.pdf PDF
RELEASED_RFP_N6274224R6711.pdf PDF
Exhibit A_PPI_Fillable.docx DOCX document
DRAFT SOL N6274224R6711 Complete Package.pdf PDF
PHIL_BAR_Base Access Request Form.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BOQ

DATE PREPARED:
BILL OF QUANTITIES31-May-24
ACTIVITY AND LOCATION:CONSTRUCTION CONTRACT NUMBER:
ROICC Site ThailandN62742R246711
PROJECT TITLE:PREPARED BY:
D/B UFC FMSS SF CTA, VMF and BCT VMFTHANH NGUYEN
QUANTITYMATERIAL COSTLABOR/EQUIPMENT COSTENGINEERING ESTIMATE
NUMBERUNITUNIT, USDTOTALUNIT, USDTOTALUNIT, USDTOTAL, USD
CLIN 0001DESIGN AND CONSTRUCTION OF SPECIAL FORCES MAINTENANCE PARKING BAY FACILITY
A10FOUNDATIONS- 0
Special Foundations
Pedestal Columns and Foundation for Maintenance BayEA- 0
Slab on Grade (cast-in-place slab-on-grade reinforced concrete slab with breathable water-resistant concrete sealer), 10.5x40
Slab on GradeSM- 0
Compacted base course 30 cm. thickCM- 0
Geotextile CoverSM- 0
floor moisture barrierSM- 0
B10SUPERSTRUCTURE- 0
Structural steel (columns and roof frame) including purlins and bracingsEA- 0
Maintenance RampLot- 0
Water Tank Tower (4M High)Lot- 0
B20EXTERIOR CLOSURE- 0
Exterior Walls
CHB Walls for Office with toilet, NCO Sleeping Quarters with attached toilet and bath, and office tools room (incl. rebars, mortar & plaster)SM- 0
Exterior Windows
Window, including hardware for Office and QuartersEA- 0
Window, including hardware for ToiletsEA- 0
Exterior Doors
Solid Core Door, including Hardware for officeEA- 0
B30ROOFING- 0
Roof Coverings & Roof Drains
Steel Roof covering (Kliplock type) incl. accessories, gutters, downspouts and Rockwool insulation and wire mesh for maintenance and parking baysSM- 0
Roof Truss incl. purlins for enclosed area (office, quarters, latrines)SM- 0
Steel Roof covering (Kliplock type) incl. accessories, gutters, downspouts and Rockwool insulation and wire mesh for enclosed areaSM- 0
C10INTERIOR CONSTRUCTION- 0
Specialties
Concrete -filled bollardsEA- 0
Cabinet for ToolsEA- 0
C30INTERIOR FINISHES- 0
Floor finishes for office, quarters, toilets and storage room - smooth concrete finishSM- 0
Floor finishes for Parking and Maintenance/Repair Bays - trowel finishSM- 0
PaintingSM- 0
Ceiling: Ficem Boards on Metal Furring (For Office, Quarters, Toilets and Tools Room)SM- 0
Ceiling: Spandrel on Metal Furring (For Exterior ceiling eaves)SM- 0
Interior Doors
Solid Core Door, including Hardware for office, Quarters & storage roomEA- 0
Solid Core Door, including Hardware for toiletEA- 0
D20PLUMBING- 0
PLUMBING FIXTURES
Through Type Lavatory (Stainless)EA- 0
Water Closet with BidetEA- 0
Toilet Paper HolderEA- 0
LavatoriesEA- 0
UrinalsEA- 0
Shower assemblyEA- 0
MirrorsEA- 0
Slop SinkEA- 0
Service Faucets with Hose Bibbs at maintenance baysEA- 0
Oil SeparatorEA- 0
WATER SUPPLY
Elevated Water Tank (5000 Li)Lot- 0
Water CisternLot- 0
Pump to lift water from cistern tank to elevated tankLot- 0
Pressure Tank (500 Liters)Lot- 0
SANITARY SYSTEM
Sanitary PipesLot- 0
Septic Tank & Leech FieldLot- 0
RAINWATER COLLECTION
Rainwater PipesLot- 0
D30HVAC & Mechanical- 0
Compressed Air SystemLot- 0
Cooling Generating Systems
Industrial FansEA- 0
Oscillating fansEA- 0
Split Type Air-Conditioning Unit - 2 HPEA- 0
D40FIRE PROTECTION- 0
Fire Alarm and Detection
Fire Alarm and DetectionLot- 0
Other Fire Protection Systems
Portable fire extinguisher with cabinetEA- 0
D50ELECTRICAL- 0
Electrical service and distribution system including lightning protection system, and testing and commissioning
Rough‐insSM- 0
WiringLot- 0
Panel boards and circuit breakersLot- 0
Manual Transfer SwitchEA- 0
Electrical OutletsLot- 0
Lightning ProtectionLS- 0
Lighting & Branch Wiring
Lights, fixtures and wiring devices - include perimeter lightingLot- 0
E10EQUIPMENT- 0
Working bay:
Provide and install 2-post 12,000 lbs liftEA- 0
Provide welding machineEA- 0
Provide 4,500 lbs engine hoistEA- 0
Provide and install parts washerEA- 0
Provide tool cabinetEA- 0
Provide foldable work benchEA- 0
Provide and instal heavy-duty truck tire changerEA- 0
Common comfort room:
Provide and install stainless steel combination shower with hand operated eye washEA- 0
Provide and install 50kVA backup generatorEA- 0
E20FURNISHINGS- 0
a. Movable Furnishings
Working bay:
Provide and install 2.5mx1.5m white boardEA- 0
Provide and install 2m benchEA- 0
Tool storage:
Provide and install heavy-duty 5-tier shelfEA- 0
Office area:
Provide and install office working table with chairEA- 0
Provide and install ceiling-high filing cabinetEA- 0
Provide and install coffee table and chairs for six peopleEA- 0
Common comfort room:
Provide and install wall-hung cabinetEA- 0
NCO's toilet:
Provide and install wall-hung cabinetEA- 0
Provide room key tagsEA- 0
Provide wall-mounted locable key cabinetEA- 0
G10SITE PREPARATION- 0
Clearing, grubbing, tree cuttingSM- 0
Excavation of Footing trenches and grid beamsCM- 0
Backfilling, levelling, CompactionCM- 0
G20SITE IMPROVEMENT- 0
Gravel Cover for Open Area (50mx24m less bldg. footprint)
Gravel Cover (4" of 3/4" thick crushed gravel)SM- 0
Compacted based course, 200 cm. thickCM- 0
GeotextileSM- 0
Gravel Access Road 5 m. wide, approx 250 m. long (with 30 cm. compacted base course and geotextile fabric)
Gravel Cover (6" of 3/4" thick crushed gravel)SM- 0
Compacted based course, 30 cm. thickCM- 0
GeotextileSM- 0
G30SITE CIVIL/ MECHANICAL UTILITIES- 0
Site Water Supply System
Water Lines from existing water mainsLot- 0
Site Storm Drainage System
Site Storm Drainage SystemLot- 0
G40SITE ELECTRICAL UTILITIES- 0
Electrical connection to base including posts, electrical cables and required transformers
Transformer (25KVa)EA- 0
Electrical Posts & AccessoriesEA- 0
CablingLM- 0
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X10Field Requirements- 0
MobilizationLS- 0
DemobilizationLS- 0
Project Management & Supervision, QC, SafetyMonths- 0
Design, Construction Plans incl RenderingLS- 0
Topographic & Geotech SurveyLS- 0
Closeout RequirementsLS- 0
X20Office Overhead- 0
TempFacil, permits, Utilities, Field Office, Environment Protection, Clean-UpMonths- 0
SUBTOTAL FOR CLIN 0001- 0
CLIN 0002DESIGN AND CONSTRUCTION OF SPECIAL FORCES COVERED TRAINING AREA FACILITY
A10FOUNDATIONS- 0- 078,000.00
A1010Special Foundations18,000.00
Pedestal Columns and Foundation for Open Area /Baskdtball CourtEA- 0350,000.00
Pedestal Columns and Foundation for BleachersEA- 0350,000.00
A1030Slab on Grade (cast-in-place slab-on-grade reinforced concrete slab with breathable water-resistant concrete sealer), 10.5x40- 032,000.00
Slab on Grade (including temperature bars)SM- 011,500.00
Compacted base course 30 cm. thickCM- 0
Geotextile CoverSM- 0
Floor moisture barrierSM- 036,500.00
B10SUPERSTRUCTURE- 08,000.00
Structural steel for open area/basketball court (columns and roof frame) including purlins and bracingsEA- 035,000.00
Structural stee for bleachers (columns and roof frame) including purlins and bracingsEA- 018,500.00
Tie Beams for open area and bleachersLM- 0
Bleachers 4 levels, 0.80m. Thread, 0.50m rise (concrete & rebar)SM- 0
Stone Fill below bleachersCM- 0
Perimeter railings at the back of the bleachersLM- 0
15 cm. thick walls at ends of bleachersSM- 0
Railings (hot dip galvanized)EA- 0
B20EXTERIOR CLOSURE- 0
Exterior Walls- 0
CMU Walls for bleachers (incl. rebars, mortar & plaster)SM- 0ERROR:#REF!
B30ROOFING- 0
Roof Coverings & Roof Drains
Steel Roof covering (Kliplock type) incl. accessories, gutters, downspouts and Rockwool insulation and wire mesh - Open Area/Basketball CourtSM- 0
Steel Roof covering (Kliplock type) incl. accessories, gutters, downspouts and Rockwool insulation and wire mesh - BleachersSM- 0
C30INTERIOR FINISHES- 0
Floor finishes (for Basketball Court) - smooth concrete painted with polyurethane based paintSM- 0
D50ELECTRICAL- 0
Electrical service and distribution system including lightning protection system, and testing and commissioning
Rough‐insSM- 0
WiringLot- 0
Panel boards and circuit breakersLot- 0
Manual Transfer SwitchEA- 0
Electrical OutletsLot- 0
Lightning ProtectionLS- 0
Lighting & Branch Wiring- 0
Lights, fixtures and wiring devices - include perimeter lightingLot- 0
G10SITE PREPARATION- 0
Clearing, grubbing, tree cuttingSM- 0
Excavation of Footing trenches and grid beamsCM- 0
Backfilling, levelling, CompactionCM- 0
G20SITE IMPROVEMENT- 0
Gravel Cover for open area (Open Area = 38m. X 38m. Less bldg footprint)
Gravel Cover (4" of 3/4" thick crushed gravel)SM- 0
Compacted based course, 20 cm. thickCM- 0
GeotextileSM- 0
G30SITE CIVIL/ MECHANICAL UTILITIES- 0
Site Water Supply System
Water Lines for the hose bibb for cleaning & maintenance of basketball coourt from existing water mainsLot- 0
Site Storm Drainage System
Site Storm Drainage SystemLot- 0
G40SITE ELECTRICAL UTILITIES (Included in Vehicle Maintenance Bay Facility)- 0- 0
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT (Included in Vehicle Maintenance Bay Facility)- 0- 0
SUBTOTAL FOR CLIN 0002- 0
CLIN 0003DESIGN AND CONSTRUCTION OF 1st BCT MAINTENANCE PARKING BAY FACILITY
A10FOUNDATIONS- 0
Special Foundations
Pedestal Columns and Foundation for Maintenance BayEA- 0
Slab on Grade (cast-in-place slab-on-grade reinforced concrete slab with breathable water-resistant concrete sealer), 10.5x40
Slab on GradeSM- 0
Compacted base course 30 cm. thickCM- 0
Geotextile CoverSM- 0
floor moisture barrierSM- 0
B10SUPERSTRUCTURE- 0
Structural steel (columns and roof frame) including purlins and bracingsEA- 0
Maintenance RampLot- 0
Water Tank Tower (4M High)Lot- 0
B20EXTERIOR CLOSURE- 0
Exterior Walls
CHB Walls for Office with toilet, NCO Sleeping Quarters with attached toilet and bath, and office tools room (incl. rebars, mortar & plaster)SM- 0
Exterior Windows
Window, including hardware for Office and QuartersEA- 0
Window, including hardware for ToiletsEA- 0
Exterior Doors
Solid Core Door, including Hardware for officeEA- 0
B30ROOFING- 0
Roof Coverings & Roof Drains
Steel Roof covering (Kliplock type) incl. accessories, gutters, downspouts and Rockwool insulation and wire mesh for maintenance and parking baysSM- 0
Roof Truss incl. purlins for enclosed area (office, quarters, latrines)SM- 0
Steel Roof covering (Kliplock type) incl. accessories, gutters, downspouts and Rockwool insulation and wire mesh for enclosed areaSM- 0
C10INTERIOR CONSTRUCTION- 0
Specialties
Concrete -filled bollardsEA- 0
Cabinet for ToolsEA- 0
C30INTERIOR FINISHES- 0
Floor finishes for office, quarters, toilets and storage room - smooth concrete finishSM- 0
Floor finishes for Parking and Maintenance/Repair Bays - trowel finishSM- 0
PaintingSM- 0
Ceiling: Ficem Boards on Metal Furring (For Office, Quarters, Toilets and Tools Room)SM- 0
Ceiling: Spandrel on Metal Furring (For Exterior ceiling eaves)SM- 0
Interior Doors
Solid Core Door, including Hardware for office, Quarters & storage roomEA- 0
Solid Core Door, including Hardware for toiletEA- 0
D20PLUMBING- 0
PLUMBING FIXTURES
Through Type Lavatory (Stainless)EA- 0
Water Closet with BidetEA- 0
Toilet Paper HolderEA- 0
LavatoriesEA- 0
UrinalsEA- 0
Shower assemblyEA- 0
MirrorsEA- 0
Slop SinkEA- 0
Service Faucets with Hose Bibbs at maintenance baysEA- 0
Oil SeparatorEA- 0
WATER SUPPLY
Elevated Water Tank (5000 Li)Lot- 0
Water CisternLot- 0
Pump to lift water from cistern tank to elevated tankLot- 0
Pressure Tank (500 Liters)Lot- 0
SANITARY SYSTEM
Sanitary PipesLot- 0
Septic Tank & Leech FieldLot- 0
RAINWATER COLLECTION
Rainwater PipesLot- 0
D30HVAC & Mechanical- 0
Compressed Air SystemLot- 0
Cooling Generating Systems
Industrial FansEA- 0
Oscillating fansEA- 0
Split Type Air-Conditioning Unit - 2 HPEA- 0
D40FIRE PROTECTION- 0
Fire Alarm and Detection
Fire Alarm and DetectionLot- 0
Other Fire Protection Systems
Portable fire extinguisher with cabinetEA- 0
D50ELECTRICAL- 0
Electrical service and distribution system including lightning protection system, and testing and commissioning
Rough‐insSM- 0
WiringLot- 0
Panel boards and circuit breakersLot- 0
Manual Transfer SwitchEA- 0
Electrical OutletsLot- 0
Lightning ProtectionLS- 0
Lighting & Branch Wiring
Lights, fixtures and wiring devices - include perimeter lightingLot- 0
E10EQUIPMENT- 0
Working bay:
Provide and install 2-post 12,000 lbs liftEA- 0
Provide welding machineEA- 0
Provide 4,500 lbs engine hoistEA- 0
Provide and install parts washerEA- 0
Provide tool cabinetEA- 0
Provide foldable work benchEA- 0
Provide and instal heavy-duty truck tire changerEA- 0
Common comfort room:
Provide and install stainless steel combination shower with hand operated eye washEA- 0
Provide and install 30kVA backup generatorEA- 0
E20FURNISHINGS- 0
a. Movable Furnishings
Working bay:
Provide and install 2.5mx1.5m white boardEA- 0
Provide and install 2m benchEA- 0
Tool storage:
Provide and install heavy-duty 5-tier shelfEA- 0
Office area:
Provide and install office working table with chairEA- 0
Provide and install ceiling-high filing cabinetEA- 0
Provide and install coffee table and chairs for six peopleEA- 0
Common comfort room:
Provide and install wall-hung cabinetEA- 0
NCO's toilet:
Provide and install wall-hung cabinetEA- 0
Provide room key tagsEA- 0
Provide wall-mounted locable key cabinetEA- 0
G10SITE PREPARATION- 0
Clearing, grubbing, tree cuttingSM- 0
Excavation of Footing trenches and grid beamsCM- 0
Backfilling, levelling, CompactionCM- 0
G20SITE IMPROVEMENT- 0
Gravel Cover for Open Area (50mx24m less bldg. footprint)
Gravel Cover (4" of 3/4" thick crushed gravel)SM- 0
Compacted based course, 200 cm. thickCM- 0
GeotextileSM- 0
Gravel Access Road 5 m. wide, approx 250 m. long (with 30 cm. compacted base course and geotextile fabric)
Gravel Cover (6" of 3/4" thick crushed gravel)SM- 0
Compacted based course, 30 cm. thickCM- 0
GeotextileSM- 0
G30SITE CIVIL/ MECHANICAL UTILITIES- 0
Site Water Supply System
Water Lines from existing water mainsLot- 0
Site Storm Drainage System
Site Storm Drainage SystemLot- 0
G40SITE ELECTRICAL UTILITIES- 0
Electrical connection to base including posts, electrical cables and required transformers
Transformer (25KVa)EA- 0
Electrical Posts & AccessoriesEA- 0
CablingLM- 0
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X10Field Requirements- 0
MobilizationLS- 0
DemobilizationLS- 0
Project Management & Supervision, QC, SafetyMonths- 0
Design, Construction Plans incl RenderingLS- 0
Topographic & Geotech SurveyLS- 0
Closeout RequirementsLS- 0
X20Office Overhead- 0
TempFacil, permits, Utilities, Field Office, Environment Protection, Clean-UpMonths- 0
SUBTOTAL FOR CLIN 0003- 0
TOTAL ESTIMATED COST- 0

NOTE:

Prepared by:

&F

FOR OFFICIAL USE ONLY

File details come from the government source that posted it. Updated .