Blank BOQ_N6274224R6711.xlsx
XLSX spreadsheet 48 KB Posted
- Attached to
- D/B UFC Vehicle Maintenance & Parking Bays and Training Area Facility, FMSS, Philippines
- Solicitation number
- N6274224R6711
About this file
This document appears to be a Bill of Quantities (BOQ) related to a federal contract opportunity. The BOQ provides a detailed breakdown of the estimated quantities, unit costs, and total costs for the design and construction of three facilities at Fort Magsaysay (FMSS) in the Philippines: a Maintenance Parking Bay Facility, a Concrete Access Road, and a Covered Training Area Facility.
The associated federal contract opportunity is Solicitation Number N6274224R6711, which is for the "D/B UFC Vehicle Maintenance & Parking Bays and Training Area Facility, FMSS, Philippines". This is a design-build project with an estimated magnitude between $500,000 and $1,000,000 for the Maintenance Parking Bay Facility, between $250,000 and $500,000 for the Concrete Access Road, and between $250,000 and $500,000 for the Covered Training Area Facility. The projects must be designed and constructed in accordance with Unified Facilities Criteria (UFC), International Building Codes (IBC), or Philippine Codes. A pre-proposal site visit is tentatively scheduled for June-July 2024, and interested contractors are required to submit a Base Access Request by May 21, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMD2_6711_Host Nation Requirements.pdf | ||
| RELEASED AMD1_6711.pdf | ||
| RELEASED_RFP_N6274224R6711.pdf | ||
| Exhibit A_PPI_Fillable.docx | DOCX document | |
| DRAFT SOL N6274224R6711 Complete Package.pdf | ||
| PHIL_BAR_Base Access Request Form.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BOQ
| DATE PREPARED: | |||
| BILL OF QUANTITIES | 31-May-24 | ||
| ACTIVITY AND LOCATION: | CONSTRUCTION CONTRACT NUMBER: | ||
| ROICC Site Thailand | N62742R | 246711 |
| PROJECT TITLE: | PREPARED BY: | ||||||||||
| D/B UFC FMSS SF CTA, VMF and BCT VMF | THANH NGUYEN | ||||||||||
| QUANTITY | MATERIAL COST | LABOR/EQUIPMENT COST | ENGINEERING ESTIMATE | ||||||||
| NUMBER | UNIT | UNIT, USD | TOTAL | UNIT, USD | TOTAL | UNIT, USD | TOTAL, USD | ||||
| CLIN 0001 | DESIGN AND CONSTRUCTION OF SPECIAL FORCES MAINTENANCE PARKING BAY FACILITY | ||||||||||
| A10 | FOUNDATIONS | - 0 | |||||||||
| Special Foundations | |||||||||||
| Pedestal Columns and Foundation for Maintenance Bay | EA | - 0 | |||||||||
| Slab on Grade (cast-in-place slab-on-grade reinforced concrete slab with breathable water-resistant concrete sealer), 10.5x40 | |||||||||||
| Slab on Grade | SM | - 0 | |||||||||
| Compacted base course 30 cm. thick | CM | - 0 | |||||||||
| Geotextile Cover | SM | - 0 | |||||||||
| floor moisture barrier | SM | - 0 | |||||||||
| B10 | SUPERSTRUCTURE | - 0 | |||||||||
| Structural steel (columns and roof frame) including purlins and bracings | EA | - 0 | |||||||||
| Maintenance Ramp | Lot | - 0 | |||||||||
| Water Tank Tower (4M High) | Lot | - 0 | |||||||||
| B20 | EXTERIOR CLOSURE | - 0 | |||||||||
| Exterior Walls | |||||||||||
| CHB Walls for Office with toilet, NCO Sleeping Quarters with attached toilet and bath, and office tools room (incl. rebars, mortar & plaster) | SM | - 0 | |||||||||
| Exterior Windows | |||||||||||
| Window, including hardware for Office and Quarters | EA | - 0 | |||||||||
| Window, including hardware for Toilets | EA | - 0 | |||||||||
| Exterior Doors | |||||||||||
| Solid Core Door, including Hardware for office | EA | - 0 | |||||||||
| B30 | ROOFING | - 0 | |||||||||
| Roof Coverings & Roof Drains | |||||||||||
| Steel Roof covering (Kliplock type) incl. accessories, gutters, downspouts and Rockwool insulation and wire mesh for maintenance and parking bays | SM | - 0 | |||||||||
| Roof Truss incl. purlins for enclosed area (office, quarters, latrines) | SM | - 0 | |||||||||
| Steel Roof covering (Kliplock type) incl. accessories, gutters, downspouts and Rockwool insulation and wire mesh for enclosed area | SM | - 0 | |||||||||
| C10 | INTERIOR CONSTRUCTION | - 0 | |||||||||
| Specialties | |||||||||||
| Concrete -filled bollards | EA | - 0 | |||||||||
| Cabinet for Tools | EA | - 0 | |||||||||
| C30 | INTERIOR FINISHES | - 0 | |||||||||
| Floor finishes for office, quarters, toilets and storage room - smooth concrete finish | SM | - 0 | |||||||||
| Floor finishes for Parking and Maintenance/Repair Bays - trowel finish | SM | - 0 | |||||||||
| Painting | SM | - 0 | |||||||||
| Ceiling: Ficem Boards on Metal Furring (For Office, Quarters, Toilets and Tools Room) | SM | - 0 | |||||||||
| Ceiling: Spandrel on Metal Furring (For Exterior ceiling eaves) | SM | - 0 | |||||||||
| Interior Doors | |||||||||||
| Solid Core Door, including Hardware for office, Quarters & storage room | EA | - 0 | |||||||||
| Solid Core Door, including Hardware for toilet | EA | - 0 | |||||||||
| D20 | PLUMBING | - 0 | |||||||||
| PLUMBING FIXTURES | |||||||||||
| Through Type Lavatory (Stainless) | EA | - 0 | |||||||||
| Water Closet with Bidet | EA | - 0 | |||||||||
| Toilet Paper Holder | EA | - 0 | |||||||||
| Lavatories | EA | - 0 | |||||||||
| Urinals | EA | - 0 | |||||||||
| Shower assembly | EA | - 0 | |||||||||
| Mirrors | EA | - 0 | |||||||||
| Slop Sink | EA | - 0 | |||||||||
| Service Faucets with Hose Bibbs at maintenance bays | EA | - 0 | |||||||||
| Oil Separator | EA | - 0 | |||||||||
| WATER SUPPLY | |||||||||||
| Elevated Water Tank (5000 Li) | Lot | - 0 | |||||||||
| Water Cistern | Lot | - 0 | |||||||||
| Pump to lift water from cistern tank to elevated tank | Lot | - 0 | |||||||||
| Pressure Tank (500 Liters) | Lot | - 0 | |||||||||
| SANITARY SYSTEM | |||||||||||
| Sanitary Pipes | Lot | - 0 | |||||||||
| Septic Tank & Leech Field | Lot | - 0 | |||||||||
| RAINWATER COLLECTION | |||||||||||
| Rainwater Pipes | Lot | - 0 | |||||||||
| D30 | HVAC & Mechanical | - 0 | |||||||||
| Compressed Air System | Lot | - 0 | |||||||||
| Cooling Generating Systems | |||||||||||
| Industrial Fans | EA | - 0 | |||||||||
| Oscillating fans | EA | - 0 | |||||||||
| Split Type Air-Conditioning Unit - 2 HP | EA | - 0 | |||||||||
| D40 | FIRE PROTECTION | - 0 | |||||||||
| Fire Alarm and Detection | |||||||||||
| Fire Alarm and Detection | Lot | - 0 | |||||||||
| Other Fire Protection Systems | |||||||||||
| Portable fire extinguisher with cabinet | EA | - 0 | |||||||||
| D50 | ELECTRICAL | - 0 | |||||||||
| Electrical service and distribution system including lightning protection system, and testing and commissioning | |||||||||||
| Rough‐ins | SM | - 0 | |||||||||
| Wiring | Lot | - 0 | |||||||||
| Panel boards and circuit breakers | Lot | - 0 | |||||||||
| Manual Transfer Switch | EA | - 0 | |||||||||
| Electrical Outlets | Lot | - 0 | |||||||||
| Lightning Protection | LS | - 0 | |||||||||
| Lighting & Branch Wiring | |||||||||||
| Lights, fixtures and wiring devices - include perimeter lighting | Lot | - 0 | |||||||||
| E10 | EQUIPMENT | - 0 | |||||||||
| Working bay: | |||||||||||
| Provide and install 2-post 12,000 lbs lift | EA | - 0 | |||||||||
| Provide welding machine | EA | - 0 | |||||||||
| Provide 4,500 lbs engine hoist | EA | - 0 | |||||||||
| Provide and install parts washer | EA | - 0 | |||||||||
| Provide tool cabinet | EA | - 0 | |||||||||
| Provide foldable work bench | EA | - 0 | |||||||||
| Provide and instal heavy-duty truck tire changer | EA | - 0 | |||||||||
| Common comfort room: | |||||||||||
| Provide and install stainless steel combination shower with hand operated eye wash | EA | - 0 | |||||||||
| Provide and install 50kVA backup generator | EA | - 0 | |||||||||
| E20 | FURNISHINGS | - 0 | |||||||||
| a. Movable Furnishings | |||||||||||
| Working bay: | |||||||||||
| Provide and install 2.5mx1.5m white board | EA | - 0 | |||||||||
| Provide and install 2m bench | EA | - 0 | |||||||||
| Tool storage: | |||||||||||
| Provide and install heavy-duty 5-tier shelf | EA | - 0 | |||||||||
| Office area: | |||||||||||
| Provide and install office working table with chair | EA | - 0 | |||||||||
| Provide and install ceiling-high filing cabinet | EA | - 0 | |||||||||
| Provide and install coffee table and chairs for six people | EA | - 0 | |||||||||
| Common comfort room: | |||||||||||
| Provide and install wall-hung cabinet | EA | - 0 | |||||||||
| NCO's toilet: | |||||||||||
| Provide and install wall-hung cabinet | EA | - 0 | |||||||||
| Provide room key tags | EA | - 0 | |||||||||
| Provide wall-mounted locable key cabinet | EA | - 0 | |||||||||
| G10 | SITE PREPARATION | - 0 | |||||||||
| Clearing, grubbing, tree cutting | SM | - 0 | |||||||||
| Excavation of Footing trenches and grid beams | CM | - 0 | |||||||||
| Backfilling, levelling, Compaction | CM | - 0 | |||||||||
| G20 | SITE IMPROVEMENT | - 0 | |||||||||
| Gravel Cover for Open Area (50mx24m less bldg. footprint) | |||||||||||
| Gravel Cover (4" of 3/4" thick crushed gravel) | SM | - 0 | |||||||||
| Compacted based course, 200 cm. thick | CM | - 0 | |||||||||
| Geotextile | SM | - 0 | |||||||||
| Gravel Access Road 5 m. wide, approx 250 m. long (with 30 cm. compacted base course and geotextile fabric) | |||||||||||
| Gravel Cover (6" of 3/4" thick crushed gravel) | SM | - 0 | |||||||||
| Compacted based course, 30 cm. thick | CM | - 0 | |||||||||
| Geotextile | SM | - 0 | |||||||||
| G30 | SITE CIVIL/ MECHANICAL UTILITIES | - 0 | |||||||||
| Site Water Supply System | |||||||||||
| Water Lines from existing water mains | Lot | - 0 | |||||||||
| Site Storm Drainage System | |||||||||||
| Site Storm Drainage System | Lot | - 0 | |||||||||
| G40 | SITE ELECTRICAL UTILITIES | - 0 | |||||||||
| Electrical connection to base including posts, electrical cables and required transformers | |||||||||||
| Transformer (25KVa) | EA | - 0 | |||||||||
| Electrical Posts & Accessories | EA | - 0 | |||||||||
| Cabling | LM | - 0 | |||||||||
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT | ||||||||||
| X10 | Field Requirements | - 0 | |||||||||
| Mobilization | LS | - 0 | |||||||||
| Demobilization | LS | - 0 | |||||||||
| Project Management & Supervision, QC, Safety | Months | - 0 | |||||||||
| Design, Construction Plans incl Rendering | LS | - 0 | |||||||||
| Topographic & Geotech Survey | LS | - 0 | |||||||||
| Closeout Requirements | LS | - 0 | |||||||||
| X20 | Office Overhead | - 0 | |||||||||
| TempFacil, permits, Utilities, Field Office, Environment Protection, Clean-Up | Months | - 0 | |||||||||
| SUBTOTAL FOR CLIN 0001 | - 0 | ||||||||||
| CLIN 0002 | DESIGN AND CONSTRUCTION OF SPECIAL FORCES COVERED TRAINING AREA FACILITY | ||||||||||
| A10 | FOUNDATIONS | - 0 | - 0 | 78,000.00 | |||||||
| A1010 | Special Foundations | 18,000.00 | |||||||||
| Pedestal Columns and Foundation for Open Area /Baskdtball Court | EA | - 0 | 350,000.00 | ||||||||
| Pedestal Columns and Foundation for Bleachers | EA | - 0 | 350,000.00 | ||||||||
| A1030 | Slab on Grade (cast-in-place slab-on-grade reinforced concrete slab with breathable water-resistant concrete sealer), 10.5x40 | - 0 | 32,000.00 | ||||||||
| Slab on Grade (including temperature bars) | SM | - 0 | 11,500.00 | ||||||||
| Compacted base course 30 cm. thick | CM | - 0 | |||||||||
| Geotextile Cover | SM | - 0 | |||||||||
| Floor moisture barrier | SM | - 0 | 36,500.00 | ||||||||
| B10 | SUPERSTRUCTURE | - 0 | 8,000.00 | ||||||||
| Structural steel for open area/basketball court (columns and roof frame) including purlins and bracings | EA | - 0 | 35,000.00 | ||||||||
| Structural stee for bleachers (columns and roof frame) including purlins and bracings | EA | - 0 | 18,500.00 | ||||||||
| Tie Beams for open area and bleachers | LM | - 0 | |||||||||
| Bleachers 4 levels, 0.80m. Thread, 0.50m rise (concrete & rebar) | SM | - 0 | |||||||||
| Stone Fill below bleachers | CM | - 0 | |||||||||
| Perimeter railings at the back of the bleachers | LM | - 0 | |||||||||
| 15 cm. thick walls at ends of bleachers | SM | - 0 | |||||||||
| Railings (hot dip galvanized) | EA | - 0 | |||||||||
| B20 | EXTERIOR CLOSURE | - 0 | |||||||||
| Exterior Walls | - 0 | ||||||||||
| CMU Walls for bleachers (incl. rebars, mortar & plaster) | SM | - 0 | ERROR:#REF! | ||||||||
| B30 | ROOFING | - 0 | |||||||||
| Roof Coverings & Roof Drains | |||||||||||
| Steel Roof covering (Kliplock type) incl. accessories, gutters, downspouts and Rockwool insulation and wire mesh - Open Area/Basketball Court | SM | - 0 | |||||||||
| Steel Roof covering (Kliplock type) incl. accessories, gutters, downspouts and Rockwool insulation and wire mesh - Bleachers | SM | - 0 | |||||||||
| C30 | INTERIOR FINISHES | - 0 | |||||||||
| Floor finishes (for Basketball Court) - smooth concrete painted with polyurethane based paint | SM | - 0 | |||||||||
| D50 | ELECTRICAL | - 0 | |||||||||
| Electrical service and distribution system including lightning protection system, and testing and commissioning | |||||||||||
| Rough‐ins | SM | - 0 | |||||||||
| Wiring | Lot | - 0 | |||||||||
| Panel boards and circuit breakers | Lot | - 0 | |||||||||
| Manual Transfer Switch | EA | - 0 | |||||||||
| Electrical Outlets | Lot | - 0 | |||||||||
| Lightning Protection | LS | - 0 | |||||||||
| Lighting & Branch Wiring | - 0 | ||||||||||
| Lights, fixtures and wiring devices - include perimeter lighting | Lot | - 0 | |||||||||
| G10 | SITE PREPARATION | - 0 | |||||||||
| Clearing, grubbing, tree cutting | SM | - 0 | |||||||||
| Excavation of Footing trenches and grid beams | CM | - 0 | |||||||||
| Backfilling, levelling, Compaction | CM | - 0 | |||||||||
| G20 | SITE IMPROVEMENT | - 0 | |||||||||
| Gravel Cover for open area (Open Area = 38m. X 38m. Less bldg footprint) | |||||||||||
| Gravel Cover (4" of 3/4" thick crushed gravel) | SM | - 0 | |||||||||
| Compacted based course, 20 cm. thick | CM | - 0 | |||||||||
| Geotextile | SM | - 0 | |||||||||
| G30 | SITE CIVIL/ MECHANICAL UTILITIES | - 0 | |||||||||
| Site Water Supply System | |||||||||||
| Water Lines for the hose bibb for cleaning & maintenance of basketball coourt from existing water mains | Lot | - 0 | |||||||||
| Site Storm Drainage System | |||||||||||
| Site Storm Drainage System | Lot | - 0 | |||||||||
| G40 | SITE ELECTRICAL UTILITIES (Included in Vehicle Maintenance Bay Facility) | - 0 | - 0 | ||||||||
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT (Included in Vehicle Maintenance Bay Facility) | - 0 | - 0 | ||||||||
| SUBTOTAL FOR CLIN 0002 | - 0 | ||||||||||
| CLIN 0003 | DESIGN AND CONSTRUCTION OF 1st BCT MAINTENANCE PARKING BAY FACILITY | ||||||||||
| A10 | FOUNDATIONS | - 0 | |||||||||
| Special Foundations | |||||||||||
| Pedestal Columns and Foundation for Maintenance Bay | EA | - 0 | |||||||||
| Slab on Grade (cast-in-place slab-on-grade reinforced concrete slab with breathable water-resistant concrete sealer), 10.5x40 | |||||||||||
| Slab on Grade | SM | - 0 | |||||||||
| Compacted base course 30 cm. thick | CM | - 0 | |||||||||
| Geotextile Cover | SM | - 0 | |||||||||
| floor moisture barrier | SM | - 0 | |||||||||
| B10 | SUPERSTRUCTURE | - 0 | |||||||||
| Structural steel (columns and roof frame) including purlins and bracings | EA | - 0 | |||||||||
| Maintenance Ramp | Lot | - 0 | |||||||||
| Water Tank Tower (4M High) | Lot | - 0 | |||||||||
| B20 | EXTERIOR CLOSURE | - 0 | |||||||||
| Exterior Walls | |||||||||||
| CHB Walls for Office with toilet, NCO Sleeping Quarters with attached toilet and bath, and office tools room (incl. rebars, mortar & plaster) | SM | - 0 | |||||||||
| Exterior Windows | |||||||||||
| Window, including hardware for Office and Quarters | EA | - 0 | |||||||||
| Window, including hardware for Toilets | EA | - 0 | |||||||||
| Exterior Doors | |||||||||||
| Solid Core Door, including Hardware for office | EA | - 0 | |||||||||
| B30 | ROOFING | - 0 | |||||||||
| Roof Coverings & Roof Drains | |||||||||||
| Steel Roof covering (Kliplock type) incl. accessories, gutters, downspouts and Rockwool insulation and wire mesh for maintenance and parking bays | SM | - 0 | |||||||||
| Roof Truss incl. purlins for enclosed area (office, quarters, latrines) | SM | - 0 | |||||||||
| Steel Roof covering (Kliplock type) incl. accessories, gutters, downspouts and Rockwool insulation and wire mesh for enclosed area | SM | - 0 | |||||||||
| C10 | INTERIOR CONSTRUCTION | - 0 | |||||||||
| Specialties | |||||||||||
| Concrete -filled bollards | EA | - 0 | |||||||||
| Cabinet for Tools | EA | - 0 | |||||||||
| C30 | INTERIOR FINISHES | - 0 | |||||||||
| Floor finishes for office, quarters, toilets and storage room - smooth concrete finish | SM | - 0 | |||||||||
| Floor finishes for Parking and Maintenance/Repair Bays - trowel finish | SM | - 0 | |||||||||
| Painting | SM | - 0 | |||||||||
| Ceiling: Ficem Boards on Metal Furring (For Office, Quarters, Toilets and Tools Room) | SM | - 0 | |||||||||
| Ceiling: Spandrel on Metal Furring (For Exterior ceiling eaves) | SM | - 0 | |||||||||
| Interior Doors | |||||||||||
| Solid Core Door, including Hardware for office, Quarters & storage room | EA | - 0 | |||||||||
| Solid Core Door, including Hardware for toilet | EA | - 0 | |||||||||
| D20 | PLUMBING | - 0 | |||||||||
| PLUMBING FIXTURES | |||||||||||
| Through Type Lavatory (Stainless) | EA | - 0 | |||||||||
| Water Closet with Bidet | EA | - 0 | |||||||||
| Toilet Paper Holder | EA | - 0 | |||||||||
| Lavatories | EA | - 0 | |||||||||
| Urinals | EA | - 0 | |||||||||
| Shower assembly | EA | - 0 | |||||||||
| Mirrors | EA | - 0 | |||||||||
| Slop Sink | EA | - 0 | |||||||||
| Service Faucets with Hose Bibbs at maintenance bays | EA | - 0 | |||||||||
| Oil Separator | EA | - 0 | |||||||||
| WATER SUPPLY | |||||||||||
| Elevated Water Tank (5000 Li) | Lot | - 0 | |||||||||
| Water Cistern | Lot | - 0 | |||||||||
| Pump to lift water from cistern tank to elevated tank | Lot | - 0 | |||||||||
| Pressure Tank (500 Liters) | Lot | - 0 | |||||||||
| SANITARY SYSTEM | |||||||||||
| Sanitary Pipes | Lot | - 0 | |||||||||
| Septic Tank & Leech Field | Lot | - 0 | |||||||||
| RAINWATER COLLECTION | |||||||||||
| Rainwater Pipes | Lot | - 0 | |||||||||
| D30 | HVAC & Mechanical | - 0 | |||||||||
| Compressed Air System | Lot | - 0 | |||||||||
| Cooling Generating Systems | |||||||||||
| Industrial Fans | EA | - 0 | |||||||||
| Oscillating fans | EA | - 0 | |||||||||
| Split Type Air-Conditioning Unit - 2 HP | EA | - 0 | |||||||||
| D40 | FIRE PROTECTION | - 0 | |||||||||
| Fire Alarm and Detection | |||||||||||
| Fire Alarm and Detection | Lot | - 0 | |||||||||
| Other Fire Protection Systems | |||||||||||
| Portable fire extinguisher with cabinet | EA | - 0 | |||||||||
| D50 | ELECTRICAL | - 0 | |||||||||
| Electrical service and distribution system including lightning protection system, and testing and commissioning | |||||||||||
| Rough‐ins | SM | - 0 | |||||||||
| Wiring | Lot | - 0 | |||||||||
| Panel boards and circuit breakers | Lot | - 0 | |||||||||
| Manual Transfer Switch | EA | - 0 | |||||||||
| Electrical Outlets | Lot | - 0 | |||||||||
| Lightning Protection | LS | - 0 | |||||||||
| Lighting & Branch Wiring | |||||||||||
| Lights, fixtures and wiring devices - include perimeter lighting | Lot | - 0 | |||||||||
| E10 | EQUIPMENT | - 0 | |||||||||
| Working bay: | |||||||||||
| Provide and install 2-post 12,000 lbs lift | EA | - 0 | |||||||||
| Provide welding machine | EA | - 0 | |||||||||
| Provide 4,500 lbs engine hoist | EA | - 0 | |||||||||
| Provide and install parts washer | EA | - 0 | |||||||||
| Provide tool cabinet | EA | - 0 | |||||||||
| Provide foldable work bench | EA | - 0 | |||||||||
| Provide and instal heavy-duty truck tire changer | EA | - 0 | |||||||||
| Common comfort room: | |||||||||||
| Provide and install stainless steel combination shower with hand operated eye wash | EA | - 0 | |||||||||
| Provide and install 30kVA backup generator | EA | - 0 | |||||||||
| E20 | FURNISHINGS | - 0 | |||||||||
| a. Movable Furnishings | |||||||||||
| Working bay: | |||||||||||
| Provide and install 2.5mx1.5m white board | EA | - 0 | |||||||||
| Provide and install 2m bench | EA | - 0 | |||||||||
| Tool storage: | |||||||||||
| Provide and install heavy-duty 5-tier shelf | EA | - 0 | |||||||||
| Office area: | |||||||||||
| Provide and install office working table with chair | EA | - 0 | |||||||||
| Provide and install ceiling-high filing cabinet | EA | - 0 | |||||||||
| Provide and install coffee table and chairs for six people | EA | - 0 | |||||||||
| Common comfort room: | |||||||||||
| Provide and install wall-hung cabinet | EA | - 0 | |||||||||
| NCO's toilet: | |||||||||||
| Provide and install wall-hung cabinet | EA | - 0 | |||||||||
| Provide room key tags | EA | - 0 | |||||||||
| Provide wall-mounted locable key cabinet | EA | - 0 | |||||||||
| G10 | SITE PREPARATION | - 0 | |||||||||
| Clearing, grubbing, tree cutting | SM | - 0 | |||||||||
| Excavation of Footing trenches and grid beams | CM | - 0 | |||||||||
| Backfilling, levelling, Compaction | CM | - 0 | |||||||||
| G20 | SITE IMPROVEMENT | - 0 | |||||||||
| Gravel Cover for Open Area (50mx24m less bldg. footprint) | |||||||||||
| Gravel Cover (4" of 3/4" thick crushed gravel) | SM | - 0 | |||||||||
| Compacted based course, 200 cm. thick | CM | - 0 | |||||||||
| Geotextile | SM | - 0 | |||||||||
| Gravel Access Road 5 m. wide, approx 250 m. long (with 30 cm. compacted base course and geotextile fabric) | |||||||||||
| Gravel Cover (6" of 3/4" thick crushed gravel) | SM | - 0 | |||||||||
| Compacted based course, 30 cm. thick | CM | - 0 | |||||||||
| Geotextile | SM | - 0 | |||||||||
| G30 | SITE CIVIL/ MECHANICAL UTILITIES | - 0 | |||||||||
| Site Water Supply System | |||||||||||
| Water Lines from existing water mains | Lot | - 0 | |||||||||
| Site Storm Drainage System | |||||||||||
| Site Storm Drainage System | Lot | - 0 | |||||||||
| G40 | SITE ELECTRICAL UTILITIES | - 0 | |||||||||
| Electrical connection to base including posts, electrical cables and required transformers | |||||||||||
| Transformer (25KVa) | EA | - 0 | |||||||||
| Electrical Posts & Accessories | EA | - 0 | |||||||||
| Cabling | LM | - 0 | |||||||||
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT | ||||||||||
| X10 | Field Requirements | - 0 | |||||||||
| Mobilization | LS | - 0 | |||||||||
| Demobilization | LS | - 0 | |||||||||
| Project Management & Supervision, QC, Safety | Months | - 0 | |||||||||
| Design, Construction Plans incl Rendering | LS | - 0 | |||||||||
| Topographic & Geotech Survey | LS | - 0 | |||||||||
| Closeout Requirements | LS | - 0 | |||||||||
| X20 | Office Overhead | - 0 | |||||||||
| TempFacil, permits, Utilities, Field Office, Environment Protection, Clean-Up | Months | - 0 | |||||||||
| SUBTOTAL FOR CLIN 0003 | - 0 | ||||||||||
| TOTAL ESTIMATED COST | - 0 |
NOTE:
Prepared by:
&F
FOR OFFICIAL USE ONLY
File details come from the government source that posted it. Updated .