Exhibit D Blank BOQ - 24R6709.xlsx

XLSX spreadsheet 31 KB Posted

Attached to
D/B UFC Multi Domain Task Force (MDTF) Intermediate Staging Area at Fort Magsaysay (FMSS), Nueva Ecija, Philippines.
Solicitation number
N6274224R6709
Issued by

About this file

This document appears to be an Exhibit D Blank Bill of Quantities (BOQ) for a federal contract opportunity related to the construction of an Intermediate Staging Area at Fort Magsaysay in the Philippines.

The key details are: The contract opportunity is a Design-Build project for new construction valued between $1,000,000 and $5,000,000. The project involves constructing a Multi Domain Task Force (MDTF) Intermediate Staging Area, including Joint Reception, Staging, Onward Movement, and Integration (RSOI) facilities. A pre-proposal site visit is tentatively scheduled for June-July 2024, and interested contractors must submit a Base Access Request by May 21, 2024. The federal agency issuing the solicitation is the Department of the Navy, Naval Facilities Engineering Command. The BOQ template provides detailed cost estimates for the construction activities, materials, labor, and overhead.

View the file

Other files

File Type Posted
N6274224R6709-0002 CNX the RFP.pdf PDF
N6274224R6709-0001_Released.pdf PDF
Exhibit A Pre Proposal Inquiry Form.xlsx XLSX spreadsheet
Exhibit A-D.pdf PDF
N6274224R6709 Released.pdf PDF
PHIL_BAR_Base Access Request Form.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

BILL OF QUANTITIES DATE PREPARED

ACTIVITY AND LOCATION:CONSTRUCTION CONTRACT NO.ID NO.
Fort Magsaysay, Nuevo Ecija, PhilippinesN6274224R6709
ESTIMATED BYCATEGORY CODE
PROJECT TITLE:NO
UFC D/B Construction of MDTF Intermediate Staging AreaSTATUS OF DESIGNJOB ORDER NO.
CLIN 0001 Construction of Billeting AreaQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
NUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
A10-B10FOUNDATION AND SUPERSTRUCTURE
Excavationcu.m
Leveling, final grading and compactionsq.m
Geotextilesq.m
Concrete Pedestalunit
B10SUPERSTRUCTURE
Steel frame stucture (column,rafter, and bracing)sq.m
Slab-on-Gradesq.m
B1020ROOF COVERING
Roof sheet with insulationsq.m
D20PLUMBING
D2020Drainage systemls
D50ELECTRICAL
D5010Electrical Service and Distributionls
Lightning protection systemls
Perimeter lightingunit
D5020Branch Wiringls
F10SPECIAL CONSTRUCTION
Dedication plaqueunit
Training and signagels
XOFFICE OVERHEAD & PROFIT
X20Office Overhead
X30Profit
Total
Table 2: SITEWORK
CLIN 0001 Construction of Billeting AreaQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
NUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
G10SITE PREPARATION
G1010Site Clearing and grubbing1ls
G1030Mobilization1ls
De-mobilization1ls
Soil investigation and test1ls
Design and drawing1ls
Construction of temporary facilities1ls
G30SITE CIVIL/ MECHANICAL UTILITIES
Water supply connection
Electricity connection
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X20Office Overhead
X30Profit
Total
Total CLIN 001
CLIN 0002 Construction of HeliportQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
NUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
A10-B10FOUNDATION AND SUPERSTRUCTURE
Excavationcu.m
Leveling, final grading and compactionsq.m
Geotextile fabricsq.m
Concrete Type II 28 Mpa include formworkcu.m
Reinforcement DB16 A615 Grade 60kg
Dowel and construction jointls
D20PLUMBING
D2020Drainage systemls
D50ELECTRICAL
Lightning protection system - Grounding pointls
F10SPECIAL CONSTRUCTION
Markerls
Tie downls
Training and signagels
XOFFICE OVERHEAD & PROFIT
X20Office Overhead
X30Profit
Total
Table 2: SITEWORK
CLIN 0002 Construction of HeliportQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
NUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
G10SITE PREPARATION
G1010Site Clearing and grubbingls
G1030Mobilizationls
De-mobilizationls
Soil investigation and testls
Design and drawingls
Construction of temporary facilitiesls
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X20Office Overhead
X30Profit
Total
Total CLIN 002
CLIN 0003 Construction of Concrete Road NetworkQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
NUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
A10-B10FOUNDATION AND SUPERSTRUCTURE
Excavation and soil fillingcu.m
Leveling, final grading and compactionsq.m
Compacted base coursecu.m
Concrete with dowel jointl.m
G20SITE IMPROVEMENT
Drainage trenchl.m
Gravel roadl.m
XOFFICE OVERHEAD & PROFIT
X20Office Overhead
X30Profit
Total
Table 2: SITEWORK
CLIN 0003 Construction of Concrete Road NetworkQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
NUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
G10SITE PREPARATION
G1010Site Clearing and grubbingls
G1030Mobilizationls
De-mobilizationls
Soil investigation and testls
Design and drawingls
Construction of temporary facilitiesls
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X20Office Overhead
X30Profit
Total
Total CLIN 003
TOTAL ALL CLINs

&1#&"Times New Roman"&10&K000000SBU - CONTRACTING AND ACQUISITIONS

Sheet2

&1#&"Times New Roman"&10&K000000SBU - CONTRACTING AND ACQUISITIONS

Sheet3

&1#&"Times New Roman"&10&K000000SBU - CONTRACTING AND ACQUISITIONS

File details come from the government source that posted it. Updated .