N6274224R6706_0002 Restructure CLINs.pdf

PDF 2 MB Posted

Attached to
D/B UFC Renovation of C2 Fusion Center, Basa Air Base, Floridablanca, Pampanga, Philippines
Solicitation number
N6274224R6706
Issued by

About this file

This document appears to be an amendment to solicitation N6274224R6706 for a design-build contract to renovate the C2 Fusion Center at Basa Air Base in the Philippines. The key details are:

The solicitation has been amended to restructure the contract line items (CLINs). CLIN 0001 is for the base bid item to restore the existing building. CLIN 0002 is an option item for constructing a new guard shack, security fence, gate, and covered walkway. CLIN 0003 is an option item for providing an exterior CCTV system, and CLIN 0004 is an option item for providing an interior CCTV system and window furnishings. The performance period has been increased from 210 to 270 calendar days for all CLINs. Specific details on the scope of work for each CLIN are provided. The proposal due date has been extended to 30 August 2024. Offerors who previously submitted a proposal may only submit a revised price proposal at this time. The solicitation is issued by the Department of the Navy, Naval Facilities Engineering Command.

View the file

Other files

File Type Posted
24R6706_0001 w Attachments.pdf PDF
Exhibits A - D.pdf PDF
N6274224R6706 Released w Attachments.pdf PDF
PPSV Site Access Request.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR6045620

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

N6274224R6706 D/B UFC Renovation of C2 Fusion Center, Basa Air Base Floridablanca, Pampanga, Philippines.

Detail of Amendment 0002 begins on the follow ing page

1. CONTRACT ID CODE PAGE OF PAGES

J 1 17

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 27-Aug-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6274224R6706

X 9B. DATED (SEE ITEM 11)

10-May-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-Aug-2024

CODE

NAVFAC ROICC THAILAND (US EMBASSY)

7 SATHORN TAI ROAD

BANGKOK THAILAND 10120

N62742 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6274224R6706

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMD 0002 RESTRUCTURE CLINS

The following changes will be considered part of this solicitation:

A. Proposal due date is hereby changed to 30 August 2024, no later than 11:00 a.m. Thailand time.

B. Due to the US Government’s limited funding for this project, CLINs have been restructured as outlined in this amendment. Contractors that submitted a proposal in response to Solicitation N6274224R6706 on 2 July 2024 are permitted to submit only a revised price proposal at this time.

C. The following changes are hereby incorporated to this solicitation: Parts 1, 3 and 6 under this solicitation.

AMENDMENT 0002

SUMMARY OF CHANGES

PART 1

PROPOSAL FORMS AND DOCUMENTS

1. CLINs have been restructured as follows:

CLIN 0001: Base Bid Item 0001 – Building Restoration.

CLIN 0002: Option Item 0001 – Construction Of Guard Shack, Security Fence, Gate, and Covered

Walkway.

CLIN 0003: Option Item 0002 – Provide Exterior CCTV System.

CLIN 0004: Option Item 0003 – Provide Interior CCTV System And Window Furnishing.

2. Section 002100, add 52.232-19 AVAILABILITY OF FUNDS FOR THE NEXT FISCAL YEAR (APR

1984) in full text.

3. Section 002200, add 52.217-5 EVALUATION OF OPTIONS (JUL 1990) in full text

4. Section 007000, 52.236-7 Permits and Responsibilities. (Nov 1991) is updated in full text.

5. Section 007000, add 52.217 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989) in full text.

6. Section 007000, add 52.232-18 AVAILABILITY OF FUNDS (APR 1984) in full text.

7. Section 007000, 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) is updated.

8. Section 007000, 52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000) is updated.

9. Section 007300, add Host Nation Requirements.

PART 3

STATEMENT OF WORK

10. Page 5, Section 4, CLIN 0001. PoP is increased from 210 days to 270 days and bulleted list items have been revised as follows:

CLIN 0001: BASE BID ITEM 1 – BUILDING RESTORATION AND SECURITY UPGRADE

PoP: 210 270 calendar days.

Interior renovation to include minimal architectural enhancements. Secure ceiling/awning space to prevent unauthorized access and improve interior climate control.

Furnish and installation of a custom raised floor system, including associated electrical work.

Renovation activities are limited to areas designated as Open Bay/Watch Floor, Offices 1, 2, and

3, CEIS Room, and Conference Room, as depicted in RFP Part 6, Attachment 1, Figure 4.

Renovation of the rooms on the east side of the building designated as broom room, electrical room, and latrines are excluded from this project.

Provision of interior CCTV system.

11. Page 5, Section 4, CLIN 0002, description has been changed from BASE BID ITEM 2 to OPTION ITEM 1.

CLIN 0002: BASE BID ITEM 2 OPTION ITEM 1 – CONSTRUCTION OF GUARD SHACK,

SECURITY FENCE, GATE, AND COVERED WALKWAY. AND EXTERIOR SECURITY

UPGRADE

PoP: 210 270 calendar days.

Construction of a new guard shack (minimum of 14 sq. m interior space) with climate control, internet connectivity, and electrical/HVAC utilities.

Design and construction of approximately 270M of perimeter security fencing with integrated lighting.

Construct a sentry gate for authorized visitors and a separate security gate for new visitor processing, including a sliding car gate and a pedestrian turnstile.

Construction of a covered walkway with lighting.

Provision of exterior CCTV system.

12. Page 5, Section 4. CLIN 0003 and CLIN 0004 are added as follows:

CLIN 0003: OPTION ITEM 2 – PROVIDE EXTERIOR CCTV SYSTEM

PoP: 270 calendar days.

Provide closed-circuit television (CCTV) system integrated with the perimeter fence and guard shack. Refer to layout shown in Part 6, Attachment 2, Figure 5.

CLIN 0004: OPTION ITEM 3 – PROVIDE INTERIOR CCTV SYSTEM and WINDOW

FURNISHING.

PoP: 270 calendar days.

Provide interior building CCTV system Provide window blinds at Office 2, Office 3, and Conference Room

13. Page 7, Section 4.2 DESIGN REQUIREMENTS. Table of deliverables has been revised to change due dates for each required design deliverable:

R Duration

After Award

Deliverable

ROICC

KO

ROICC

COR

ROICC User

X 10 days 20 days

Basis Design & Concept Design (15%) X X

N/A 40 days

35% Design X X

X 60 days 65% 50% Design X X

X 80 days 100% Pre-Final Design X X

X 100 days Final Design X X

Refer to FC 1-300-09N Navy and Marine Corps Design Procedures for requirements and description of each deliverable.

* N/A - Not Applicable ** R - Required Deliverable *** X under reviewers is equals 1 copy, any other number is that many copies **** General guidance for preparation of design submittals is provided in FC 1-300-09N. Chapter 1, Paragraph 1-7 Facility Design of UFC 1-201-01

14. Page 7, Section 4.3 PROJECT RENDERING. Project rendering is no longer required.

Provide Google Earth KMZ/KML file of project rendering. File shall be properly geocoded and easily opened with Google Earth to show 3D model at the correct location.

Provide one (1) full color 3-D rendering (24in. x 30in. Minimum inside mat dimension of 16in. x 20in.) of the proposed facility by a company that regularly does this type of work as a major component of their normal business. Use the final rendering to produce the image and digital file for the signboard and the framed photographic copies provided to the Contracting Officer. Not required.

15. Page 7, Section 5.1 Civil work. List items a. and c. and d. and f. have been deleted and the remaining list items renumbered.

a. A topographic survey of the construction area is required. A registered surveyor’s endorsed drawing showing existing ground profile with contours and spot elevations, drainage ditches, existing utilities, and other existing topographic features of the site shall be submitted upon completion of the site survey works. The results of this topographic and siting survey shall be used by the contractor to plan and eventually construct suitable external facility works as well as specific exterior landscaping works for the areas surveyed. The survey must show the most economical and suitable locations for rainwater flow and discharge points for drainage around the new facility.

b. The Contractor is required to retain a Geotechnical Engineer experienced and licensed in the geographic region of the project to develop geotechnical perform necessary survey and investigation that the contractor’s DOR requires requirements to support design and construction.

The Contractor's Geotechnical Engineer must perform subsurface investigation/testing as required to adequately determine all applicable geotechnical factors related to type and capacity of the project foundations which are provided by the contractor’s DOR.

c. Site clearance/cutting: Vegetation shall be cleared around construction area. Contractor shall submit site clearance plan for COR approval before start cutting trees.

d. Construction of external work shall include slope improvement, re-grading of slopes, pre-cast concrete drains so the site will drain, and general landscaping over areas disturbed by the construction work.

f. Prevent erosion from occurring by providing erosion control measures as required.

16. Page 8, Section 5.2. C2 Fusion Center Facility. Scope and table have been revised to read as follows.

5.2 C2 Fusion Center Facility

5.2.1 Watch Floor and Office Rooms, CEIS, and Conference Room

Uniformat Section#

Description Specific Requirements Qty

C302011 Raised access floor system

Provide raised access floor system at the Watch Floor/Open Bay area only. Refer to illustration in Part 6, Attachment 2, Figure 3. Scope includes associated electrical work, involving rewiring and relocation of outlets onto the raised floor system, ensuring seamless integration and functionality.

(CLIN 0001)

sqm

D503005 Security Systems

Provide CCTV cameras to support the security system.

Coordinate requirements with UFC-4-022-01, UFC-4- 021-02, and Part 3 Section 6 (CLIN 0004). Refer to Part 6, Attachment 2, Figure 4 for location of cameras.

E2010 Fixed furnishings, window treatments

Provide combi blinds or zebra blinds at Office 2, Office 3 and Conference Room. (CLIN 0004)

17. Page 8, Section 5.3. Guard Shack. List item b. has been revised as follows.

5.3 Guard Shack. D305002, HVAC has been revised to read as follows:

D305002 HVAC

Provide a minimum of one (1) inverter-type window air conditioning conditioner system unit (ACU) with minimum cooling capacity of 2.5 HP. andProvide a minimum of two (2) oscillating ceiling fans.

18. Page 8, Section 5.3. Work item D503001 Telecommunication System has been removed.

D503001 Telecommunication Systems

Provide phone outlet and data outlet. Integrate system with existing facility.

19. Page 9, Section 5.4 Covered Walkway has been revised to add minimum required width of walkway.

5.4 Covered Walkway.

Provide a covered concrete walkway from the existing C2 Fusion Center to the Guard Shack and perimeter fence. Walkway shall have suitable weatherproof lighting fixtures. Walkway shall be a minimum 1.5 meters wide.

20. Page 9, Section 6. Description of CLIN 0001 is revised as follows:

CLIN 0001, BASE BID ITEM 1 - BUILDING RESTORATION AND SECURITY UPGRADE

21. Page 9, Section 6. CLIN 0001, B2010 EXTERIOR WALLS. List items a. and c. have been revised to read:

a. Weatherproof all wall sleeves and door improvements for enhanced air conditioning efficiency and security of the Watch Floor, offices, CEIS room, and Conference Room. Seal all barrier penetrations such as conduits, pipes, electric boxes, and fixtures.

b. Provide rubber bushing or grommets to existing wall penetrations to safeguard existing cable wires. Photos of existing penetration in the C2 Fusion are shown in Part 6.

c. No other structural or architectural work is required on the exterior wall.

22. Page 9, Section 6, CLIN 0001, B201007 EXTERIOR SOFFITS. List item a. has been revised to add estimated quantity of exterior soffit coverage as follows.

a. Security at C2 Fusion Center Soffit: Secure the open space between the wall and ceiling throughout the facility using welded steel mesh. Provide hot dip galvanized welded wire steel mesh or aluminum expanded metal sheets above the wall mounted in such a way as to prevent people and animals from entering the building through the roof canopy. Welded wire mesh shall be no less than 3.76mm (9 gauge) thick mesh with a maximum opening of 25mm (1 inch). If using expanded metal sheets, they shall be minimum of 4.5mm (7 gauge) mesh with a maximum opening of 12.7mm (1/2 inch). The estimated area needing soffit coverage is approximately 100 square meters.

23. Page 9, Section 6, CLIN 0001, B2020 EXTERIOR WINDOWS has been revised to read:

a. North and west sides of C2 Fusion Center (windows at Office 2, Office 3, and Conference Room).

All interior and exterior edges of the window frame shall be completely sealed with approved weatherproof and paintable sealant, UV resistant, non-hardening silicon sealant of an appropriate color.

24. Page 9, Section 6, CLIN 0001, B2030 EXTERIOR DOORS has been revised to add:

B2030 EXTERIOR DOORS

North, west, and south sides of C2 Fusion Center. Total of 5 exterior doors.

25. Page 9, Section 6, CLIN 0001, C3020 FLOOR FINISHES has been revised to read:

a. Repair and re-attachment of existing ceramic tile baseboards. Replacement of damaged baseboards only. For bidding purposes, assume a maximum of 10% of existing baseboards will need repair or replacement. If replacement is needed, replace with similar materials for seamless integration.

26. Page 10, Section 6, CLIN 0001, D30 HVAC. List item a. is revised to add quantity of existing air conditioning units that require cleaning.

a. Perform deep cleaning of existing indoor and outdoor air-conditioning units for optimal performance and efficiency. Work includes, but is not limited to, removing dust, debris, and mold from coils, filters, drains, and fan blades. Perform refrigerant level check and top-off with the appropriate R- refrigerant if necessary. Contractor is responsible for providing all necessary cleaning equipment, supplies, and refrigerant for recharge. There are 22 wall mounted split-type air conditioners.

27. Page 10, Section 6, CLIN 0001, D5010 ELECTRICAL SERVICE AND DISTRIBUTION, has been removed.

D5010 ELECTRICAL SERVICE AND DISTRIBUTION

a. Perform a comprehensive survey of the existing electrical system, including:

Power distribution panels and feeders Lighting systems and controls HVAC and other equipment load.

Grounding and bonding systems

b. Identify any deficiencies or limitations in the existing system that may impact the integration of new requirements.

c. Assess the available capacity of the existing system to support the additional load from the guard house, perimeter lighting, canopy and walkway, and CCTV system (CCTV systems included in CLIN 0003 and CLIN 0004).

d. Develop a detailed design for the new electrical system, including:

Power distribution for the guard house, perimeter lighting, and walkway Lighting controls for the perimeter and walkway Integration with existing security systems for lighting control and potential CCTV or access control needs

Coordination with the architectural and structural design of the guard house and walkway

e. Expand or upgrade existing electrical panel boards as necessary to accommodate the additional electrical loads of the CCTV, guard house, perimeter lighting, and covered walkway. The upgraded system shall also accommodate an additional four (4) spare circuit breakers to support future additional loads.

28. Page 11, Section 6, CLIN 0001, D503005 SECURITY SYSTEMS has been removed from CLIN 0001.

D503005 SECURITY SYSTEMS

a. Provide high quality pan-tilt-zoom (PTZ) cameras, capable of capturing detailed images and video, for wide area Situational awareness (SA) of the designated areas illustrated in Part 6, Attachment 2.

b. PTZ cameras should have pan, tilt, and zoom functionalities for flexible coverage and close-up views.

c. Conduct a thorough site assessment to identify optimal camera placement locations. Develop a detailed installation plan, considering line of sight, coverage overlap, and potential obstacles.

d. Establish the necessary infrastructure for power and data connectivity.

e. Documentation: Create comprehensive documentation, including camera locations, specifications, and configuration details. Provide operation and maintenance manuals for future reference. Provide training on monitoring capabilities for designated personnel.

f. Testing and Commissioning: Conduct thorough testing of the entire PTZ camera system. Address any issues identified during testing. Commission the system for full operational use.

g. Training: Train end-users and security personnel on the operation of PTZ cameras and associated systems.

29. Page 11, Section 6, CLIN 0001, E2010 FIXED FURNISHINGS. List item a. has been removed from scope of CLIN 0001 and the remaining list item renumbered.

a. At existing interior and exterior windows, provide polyester type, combi blinds or zebra blinds made of alternating sheer and opaque fabric stripes that can be rolled up and down to control light and privacy.

a. Lower conference room TVs by 1ft for improved viewing from the rear table. Restore damage to wall.

30. Page 11, Section 6. Description of CLIN 0002 is revised as follows:

CLIN 0002, OPTION ITEM 1 - CONSTRUCTION OF GUARD SHACK, SECURITY FENCE,

GATE, AND COVERED WALKWAY AND EXTERIOR SECURITY UPGRADE

31. Page 13. Section 6, CLIN 0002, B201007 EXTERIOR SOFFITS, list item d. has been removed,

d. Provide hot dip galvanized welded wire steel mesh or aluminum expanded metal sheets above the wall mounted in such a way as to prevent people and animals from entering the building through the roof canopy. Welded wire mesh shall be no less than 3.76mm (9 gauge) thick mesh with a maximum opening of 25mm (1 inch). If using expanded metal sheets, they shall be minimum of 4.5mm (7 gauge) mesh with a maximum opening of 12.7mm (1/2 inch).

32. Page 16, Section 6, CLIN 0002, D5010 ELECTRICAL SERVICE AND DISTRIBUTION is added as follows:

D5010 ELECTRICAL SERVICE AND DISTRIBUTION

Assess the existing electrical system's capacity to determine if it can adequately support the increased electrical load resulting from the proposed facility additions. Upgrade the electrical system as necessary to accommodate the additional power requirements for the new facility components.

33. Page 17, Section 6, CLIN 0002, subsection D5030 COMMUNICATIONS AND SECURITY has been removed from CLIN 002.

D5030 COMMUNICATIONS AND SECURITY

a. Provide telephone and data drops in the guard shack. These shall be integrated into the existing

C2 Fusion Center communications system.

b. Provide Category 6 Unshielded Twisted Pair (UTP) copper cable for horizontal voice and data cables.

c. Provide an Intercommunication System to allow two-way communications between the Guard

Shack and the C2 Fusion Center.

34. Page 17, Section 6, CLIN 0002, subsections D5090 OTHER ELECTRICAL SERVICES, E10 EQUIPMENT, and E20 FURNISHINGS have been removed from scope.

D5090 OTHER ELECTRICAL SERVICES

a. The entire structure and facility shall be adequately and correctly protected against lightning discharges and earthed.

b. Provide a complete grounding system for the facility electrical and telecommunications systems.

Assembly includes grounding protection systems.

c. Design and install a complete lightning protection system. Comply with NFPA 780, Standard for the Installation of Lightning Protection Systems, for lightning protection risk assessment.

Calculations are required for lightning protection analysis. Lightning Protection Systems must not void the roof warranty. Assembly includes lightning protection devices (air terminals, mounting devices), clamps, ground rods, conductors, trenching, backfill, and any other items to ground metal structure frames with conduit and wire. A licensed electrical worker or professional engineer shall test and report on the adequacy lightning protection system. The test results and reports shall be submitted to the Government as part of the acceptance of Building Occupancy.

E10 EQUIPMENT

Provide associated CCTV monitoring equipment to include minimum of 2 flat screen monitors.

E20 FURNISHINGS

E2010 FIXED FURNISHINGS

At existing interior and exterior windows, provide polyester type, combi blinds or zebra blinds made of alternating sheer and opaque fabric stripes that can be rolled up and down to control light and privacy.

F10 SPECIAL CONSTRUCTION

Not required.

35. Page 17, Section 6, CLIN 0002, G10 SITE PREPARATION. List item b. has been revised to remove requirement for topographic survey as follows:

b. The Contractor is required to perform a topographic survey of the project area that will be impacted by his/her work. This topographic survey shall be included in the contractor’s design plans. Topographic and utility surveys to include surveys of the existing size and a capability assessment of existing utilities (power, water, sanitary, etc.) around the immediate vicinity of the building site for connection and support of utilities requirements for the new building and services. Prior to starting work, physically verify the location of all existing utilities and obtain all additional survey data required to provide a quality final design. The Contractor shall verify the location of all utilities prior to construction. Minimize the impact of construction activity on operations and neighboring facilities.

36. Page 17, Section 6, CLIN 0002, G10 SITE PREPARATION. List item d. has been revised to read:

d. Identify and obtain permits to comply with national and local regulatorybase requirements associated with the work. The contractor shall obtain a renovation permit from the Civil Engineer Staff Office (CESO) of Basa Air Base. No permits outside of the AFP system is required.

37. Page 20, Section 6, CLIN 0002, subsections G4030 SITE COMMUNICATION AND SECURITY and

G403006 TV CAMERAS & MONITORS have been removed from scope of CLIN 0002.

G4030 SITE COMMUNICATION AND SECURITY

Provide a site communication and security system including, but not necessarily limited to closed circuit television (CCTV) system including all conduit and wiring, underground structures, termination equipment, and grounding systems as required for a complete and usable system.

a. Provide pan-tilt-zoom (PTZ) cameras for wide area Situational awareness (SA) of the ECF Access

Control and Response Zones.

b. Provide a system of cable supporting structures, including empty conduits with pull strings, junction boxes, outlet boxes, outlet connectors, and cover plates for exterior CCTV camera system.

G403006 TV CAMERAS & MONITORS

Provide pan-tilt-zoom (PTZ) cameras for wide area Situational awareness (SA) of the designated areas illustrated in Part 6, Attachment 2.

38. Page 20, Section 6, CLIN 0002, Z GENERAL REQUIREMENTS, list item f. has been deleted.

e. Provide operations and maintenance manual (written and in video format) for the building and all its systems. Provide technical training to the end users, to be scheduled and coordinated via the COR. Provide video footage of the training to the COR and the end user for record.

39. The following requirements for interior and exterior CCTV systems have been removed from CLIN 0001 and CLIN 0002 and separated as CLIN 0003 and CLIN 0004 as follows:

CLIN 0003, OPTION ITEM 2 – PROVIDE EXTERIOR CCTV SYSTEM

Provide closed-circuit television (CCTV) system integrated with the perimeter fence and guard shack.

Refer to layout shown in Part 6, Attachment 2, Figure 5.

D5010 ELECTRICAL SERVICE AND DISTRIBUTION

Upgrade the electrical system as necessary to accommodate the additional power of the CCTV and communications system.

D5030 COMMUNICATIONS AND SECURITY

a. Provide telephone and data drops in the guard shack. These shall be integrated into the existing C2 Fusion Center communications system.

b. Provide Category 6 Unshielded Twisted Pair (UTP) copper cable for horizontal voice and data cables.

c. Provide an Intercommunication System to allow two-way communications between the Guard

Shack and the C2 Fusion Center.

G4030 SITE COMMUNICATION AND SECURITY

Provide a site communication and security system including, but not necessarily limited to closed circuit television (CCTV) system including all conduit and wiring, underground structures, termination equipment, and grounding systems as required for a complete and usable system.

a. Provide pan-tilt-zoom (PTZ) cameras for wide area Situational awareness (SA) of the ECF Access Control and Response Zones.

b. Provide a system of cable supporting structures, including empty conduits with pull strings, junction boxes, outlet boxes, outlet connectors, and cover plates for exterior CCTV camera system.

G403006 TV CAMERAS & MONITORS

Provide pan-tilt-zoom (PTZ) cameras for wide area Situational awareness (SA) of the designated areas illustrated in Part 6, Attachment 2, Figure 5.

CLIN 0004, OPTION ITEM 2 – PROVIDE INTERIOR CCTV SYSTEM and WINDOW BLINDS Provide closed-circuit television (CCTV) system inside the building as depicted in Part 6, Attachment 2, Figure 4.

D50 ELECTRICAL

D5010 ELECTRICAL SERVICE AND DISTRIBUTION

Upgrade the electrical system as necessary to accommodate the additional power of the CCTV and communications system.

D503005 SECURITY SYSTEMS

a. Provide high quality pan-tilt-zoom (PTZ) cameras, capable of capturing detailed images and video, for wide area Situational awareness (SA) of the designated areas illustrated in Part 6, Attachment 2.

b. PTZ cameras should have pan, tilt, and zoom functionalities for flexible coverage and close-up views.

c. System shall provide minimum of 7 days of continuous video recording on the Network Video Recorder (NVR). However, the system's storage capacity should be expandable to accommodate at least one month's worth of footage before overwriting begins.

d. Conduct a thorough site assessment to identify optimal camera placement locations. Develop a detailed installation plan, considering line of sight, coverage overlap, and potential obstacles.

e. Establish the necessary infrastructure for power and data connectivity.

f. Documentation: Create comprehensive documentation, including camera locations, specifications, and configuration details. Provide operation and maintenance manuals for future reference.

Provide training on monitoring capabilities for designated personnel.

g. Testing and Commissioning: Conduct thorough testing of the entire PTZ camera system. Address any issues identified during testing. Commission the system for full operational use.

h. Operation and Maintenance Manual: Provide operations and maintenance manual (written and in video format) for CCTV system.

i. Training: Train end-users and security personnel on the operation of PTZ cameras and associated systems. Training shall be scheduled and coordinated via the COR. Provide video footage of the training to the COR and the end user for record.

E2010 FIXED FURNISHINGS

a. At existing windows of Office 3, Office 2, and Conference Room, provide polyester type, combi blinds or zebra blinds made of alternating sheer and opaque fabric stripes that can be rolled up and down to control light and privacy.

PART 6

ATTACHMENTS

40. Attachment 8 – HVAC As-built is added to Part 6

C. The following attachment is incorporated to the RFP.

- Exhibit D - Revised Bill of Quantity (BOQ)

D. All other paragraphs, provisions, and conditions remain unchanged.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 02-Jul-2024 11:00 AM to 30-Aug-

2024 11:00 AM.

The number of offeror copies required has decreased by 1 from 1 to 0.

CLIN 0001

The CLIN description has changed from BUILDING RESTORATION & SECURITY UPGRADE to BUILDING RESTORATION.

The CLIN extended description has changed from:

This is a Design-Build project. The contractor shall provide required earthwork, civil, structural, and all other associated works for design, restoration and security upgrade of the current C2 FUSION CENTER located at BASA Air Base, Floridablanca, Philippines, in accordance with the Parts 2-6 attached here within.

To:

BASE BID ITEM 0001

This is a Design-Build project. The contractor shall provide required earthwork, civil, structural, and all other associated works for design, restoration of the current C2 FUSION CENTER located at BASA Air Base, Floridablanca, Philippines, in accordance with the Parts 2-6 attached here within.

CLIN 0002

The CLIN extended description has changed from:

This is a Design-Build project. The contractor shall provide required earthwork, civil, structural, and all other associated works for design and construction of GUARD SHACK, SECURITY FENCE, GATE, COVERED WALKWAY AND EXTERIOR SECURITY UPGRADE of the C2 the Parts 2-6 attached here within.

OPTION ITEM 0001

This is a Design-Build project. The contractor shall provide required earthwork, civil, structural, and all other associated works for design and construction of GUARD SHACK, SECURITY

FENCE, GATE, COVERED WALKWAY AND EXTERIOR SECURITY UPGRADE of the C2 the Parts 2-6 attached here within.

The option status has changed from No Status to Option.

CLIN 0003 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0003 1 Project

OPTION PROVIDE EXTERIOR CCTV SYSTEM

FFP

OPTION ITEM 0002

This is a Design-Build project. The contractor shall provide and install EXTERIOR CCTV SYTEM for the C2 FUSION CENTER located at BASA Air Base, Floridablanca, Philippines, in accordance with the Parts 2-6 attached here within.

FOB: Destination

NET AMT

CLIN 0004 is added as follows:

0004 1 Project

OPTION PROVIDE INTERIOR CCTV SYSTEM & WINDOW

FFP

OPTION ITEM 0003

This is a Design-Build project. The contractor shall provide and install EXTERIOR CCTV SYTEM and WINDOW FURNISHING for the C2 FUSION CENTER located at BASA Air Base, Floridablanca, Philippines, in accordance with the Parts 2-6 attached here within.

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

210 dys. ADC 1 NAVFAC PACIFIC SITE PHILIPPINES

CAMP AGUINALDO

MANILA PHILIPPINES

63 2 912 2423 EXT. 308

N62742

CAGE

270 dys. ADC 1 NAVFAC PACIFIC SITE PHILIPPINES

CAMP AGUINALDO

MANILA PHILIPPINES

63 2 912 2423 EXT. 308

The following Delivery Schedule item for CLIN 0002 has been changed from:

CAGE

210 dys. ADC 1 NAVFAC PACIFIC SITE PHILIPPINES

CAMP AGUINALDO

MANILA PHILIPPINES

63 2 912 2423 EXT. 308

CAGE

270 dys. ADC 1 NAVFAC PACIFIC SITE PHILIPPINES

CAMP AGUINALDO

MANILA PHILIPPINES

63 2 912 2423 EXT. 308

SECTION 00 21 00 - INSTRUCTIONS

52.232-19 AVAILABILITY OF FUNDS FOR THE NEXT FISCAL YEAR (APR 1984)

Funds are not presently available for performance under this contract beyond FY2024. The Government's obligation for performance of this contract beyond that date is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise for performance under this contract beyond FY2024, until funds are made available to the Contracting Officer for performance and until the Contractor receives notice of availability, to be confirmed in writing by the Contracting Officer.

(End of clause)

SECTION 00 22 00 - SUPPLEMENTARY INSTRUCTIONS

52.217-5 EVALUATION OF OPTIONS (JUL 1990)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

(End of provision)

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following Acceptance/Inspection Schedule was added for CLIN 0003:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

The following Acceptance/Inspection Schedule was added for CLIN 0004:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option unilaterally by modification to the Contractor within ninety (90) calendar days from contract award for Option Items 0001 - 0003.

Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

52.232-18 AVAILABILITY OF FUNDS (APR 1984)

Funds are not presently available for this contract. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the Contract Award Document (SF1442), (b) prosecute the work diligently, and (c) complete the entire work for both Base Bid and Option items ready for use not later than two hundred and seventy (270) calendar days after Contract Award. The time stated for completion shall include final cleanup of the premises.

CLIN 0001: Base Bid Item 0001 Building Restoration - 270 calendar days CLIN 0002: Option Item 0001 Construction of Guard Shack, Security Fence, Gate, and Covered Walkway -

270 calendar days.

CLIN 0003: Option Item 0002 Provide Exterior CCTV System - 270 calendar days CLIN 0004: Option Item 0003 Provide Interior CCTV System And Window Furnishing - 270 calendar days.

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount for each calendar day of delay until the work is completed or accepted.

CLIN 0001: Building Restoration and Security Upgrade. - $180 / calendar day CLIN 0002: Construction of Guard Shack, Security Fence, Gate, Covered Walkway and Exterior

Security Upgrade. - $320 / calendar day.

CLIN 0001: Base Bid Item 1 – Building Restoration - $120 / calendar day.

CLIN 0002: Option Item 1 – Construction Of Guard Shack, Security Fence, Gate, and Covered Walkway - $220

/ calendar day.

CLIN 0003: Option Item 2 – Provide Exterior CCTV System - $80 / calendar day.

CLIN 0004: Option Item 3 – Provide Interior CCTV System And Window Furnishing - $80 / per calendar day.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

The following were previously included by reference and are now included by full text:

52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)

The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor's fault or negligence. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

HOST NATION REQUIREMENTS

Contractor Licensing and Hiring Requirements

Contractors must be duly authorized to operate and conduct business in any host country and must fully comply with all laws, decrees, labor standards, and regulations of the host country during the performance of the contract. The United States has established international agreements with the Philippines that include provisions relating to the procurement of supplies, employment preferences and use of local and U.S. contractors, as well as restrictions on hiring of third country nationals or utilization of third country contractors. Offerors are expected to comply with all controlling international agreements and with the laws of host nations whether the United States Government provides notice of the existence of such requirements. The contractor will not be permitted use of third country personnel or contractors in the performance of this contract without a demonstration that reasonable efforts to employ citizens, nationals, and permanent residents of host nation and the United States, or contractors of the host nation and the United States, have been made and that wages competitive with or higher than those being paid for similar work performed in the host nation by citizens of the host nation or of the United States are being offered.

The contractor shall not employee third country personnel or contractors without written notification of United States approval from the Contracting Officer.

Permit Compliance

The United States does not directly hold environmental permits in the host nation. The contractor shall comply with environmental permits held by the host nation for the benefit of a DoD project even if the contractor is not named in the permit. Contractor shall document general procedures and their implementation for compliance with permit conditions, Best Management Practices, and required mitigations. Contractor shall be responsible for any required corrective actions. Contractor shall provide permit compliance and corrective action documentation to the COR and any additional Government and Host Nation representatives as requested by the COR.

Temporary Construction Facilities Physical Appearance

Be aware of local sensitivities and cultural values. Temporary facilities and visible components thereof shall be of solid color without visible markings, graphics, and/or text.

Biosecurity for Construction Contracts

Invasive species can be purposefully or inadvertently moved with construction equipment, personal protective equipment and hand tools, foot traffic, vehicles and vessels, raw construction materials, and packing materials.

Invasive species can become pests and affect the economy, ecology, and human health. It is critically important to be aware of ways to prevent the movement of invasive species and implement best management practices. The Contractor shall take all practicable measures to prevent introduction or spread of invasive species in association with contract performance, including importation of supplies, equipment or personnel and movement of supplies, equipment, or personnel between locations. At a minimum, all activities shall comply with U.S. and host nation biosecurity laws and regulations, shall include 100 percent inspection of equipment and supplies. If the contract performance results in introduction or spread of invasive species, the contractor shall be responsible for taking appropriate measures, in consultation with appropriate authorities, to contain and prevent contract related spread of such species at no additional cost to the government. In addition, the Contractor shall:

a. Comply with all necessary inspections of raw construction materials, equipment, and vehicles for invasive and pest species prior to entering of the project site and prior to moving equipment offsite. The Contractor is responsible for any cleaning or inspection fees.

b. Non-native invasive species can be inadvertently moved with construction equipment, Personal protective equipment, hand tools, foot traffic, vehicles, vessels, raw construction materials, and packing materials.

c. Conduct vehicle washdown and inspection for soil and other material to prevent the inadvertent movement of invasive species from the project site to other locations. Establish appropriate facilities that comply with all environmental laws and regulations, and promptly take corrective or preventative actions for noncompliance. Include these details in a biosecurity/Hazard Analysis and Critical Control Point (HACCP) plan and environmental briefs.

d. Submit a biosecurity/HACCP Plan, prepared in accordance with USFWS HACCP Manual for all imported equipment and imported construction materials and supplies. The HACCP plan must address, as a minimum, the identification and control of invasive and non-native species in construction equipment and construction materials and supplies.

e. Implement and update the HACCP plan accordingly to reduce the risk of spreading invasive species. The HACCP development team should include at least two members, one member with biological expertise with invasive species and one member from the project team who has a clear understanding of the project activities and requirements. Contractor is responsible for training all personnel on the project specific HACCP requirements once the plan is approved by the Government.

f. The Contractor must compile all supporting documentation (e.g. reports, checklists and logs) required under their HACCP Plan and submit such documents to the Contracting Officer on a monthly basis. Once all HACCP plan activities are complete, bound hardcopies of the plan and all supporting documentation and submit to the Contracting Officer.

(End of Summary of Changes)

GENERAL NOTES

1. ALL DIMENSION ARE IN MILLIMETER UNLESS OTHERWISE SHOWN.

2. ALL EQUIPMENT SHALL BE MOUNTED ON OR SUPPORTED VIBRATION ISOLATOR UNITS OR

ASSEMBLIES AS SPECIFIED AND AS SHOWN IN THE DRAWINGS.

3. INSTALLATION OF ALL WORKS SHALL BE DONE IN A NEAT AND WORKMANLIKE MANNER, IMPROPERLY

SETWORK OR FINISHED AS DETERMINED BY THE ENGINEER/ ARCHITECT SHALL BE REMOVED AND

REPLACED AT NO EXTRA COST.

4. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND CLEAN

5. DEVIATION AND RENOVATION FROM PLANS SHALL BE REFFERED TO THE MECHANICAL ENGINEER

6. ALL NECESSARY GOVERNMENT PERMIT SHALL BE SECURE AND PAD FOR BY THE CONTRACTOR.

7. ALL MECHANICAL WORKS SHALL BE IN ACCORDANCE WITH THE LATEST MECHANICAL ENGINEER'S

CODE ASME AND ASHRAE STANDARD.

8. MECHANICAL CONTRACTOR SAFETY AND ORDERLINESS.

9. MECHANICAL CONTRACTOR SHALL VERIFY SITE PRIOR TO ACTUAL INSTALLATION

10. UPON COMPLETION OF PIPING INSTALLATION, TEST ALL FACTORY AND FILLED INSTALLED PIPING

WITH LEAK DETECTOR, OR ACQUIRE A LEAK TIGHT PIPING SYSTEM. IF LEAKS ARE DETECTED, CORRECT AND RETEST THE SYSTEM, FOLLOW THE MANUFACTURER RECOMENDATIONS.

11. THE MECHANICAL CONTRACTOR SHALL PROVIDE THE DETAILED DRAWING FOR THE REFRIGERANT PIPING SYSTEM.

12. THE MECHANICAL CONTRACTOR SHALL CONDUCT TESTING, BALANCING AND COMMISSIONING OF ALL

AIR CONDITIONING EQUIPMENT.

13. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT SITE; THAT IS THE ACTUAL PIPE SIZE, LOCATION, DEPTH, TOP AND ELEVATION OF ALL EXISTING PIPES AND RELATED STRUCTURES. THE CONTRACTOR SHALL PROVIDE THE

NECESSARY CHIPPING, PENETRATION AND SURFACE RESTORATION OF THE AFFECTED AREAS IN THE LAYING OF THE

MECHANICAL PIPES.

DESIGNATION QTY

AREA SERVED DESCRIPTION

CAPACITY

ELECTRICAL CHARACTERISTICS

REMARKS

HP WATTS VOLTS PHASE HERTZ

STACU 1

CONFERENCE 220 V 1 60

220 V 1 60

220 V 1 60

220 V 1 60

AIR CONDITIONIG UNITS

2.5 HP

WALL MNTD

1,865

220 V 1 601,119

220 V 1 60

220 V 1 60

2.5 HP

CEIS RM

OFFICE 3

OFFICE 1

OFFICE 2

STACU 2

STACU 3

STACU 4

STACU 5

STACU 6

STACU 7

1.5 HP

1.5 HP

1.5 HP

CONFERENCE WALL MNTD

WALL MNTD

WALL MNTD

WALL MNTD

WALL MNTD

WALL MNTD

2.5 HP

2.5 HP

1,865

1,865

1,865

1,119

1,119

STACU 8

220 V 1 60

WALL MNTD

2.5 HP 1,865

STACU 9

OPEN BAY 220 V 1 60

220 V 1 60

220 V 1 60

220 V 1 60

2.5 HP

WALL MNTD

1,865

220 V 1 60

220 V 1 60

220 V 1 60

2.5 HP

STACU 10

STACU 11

STACU 12

STACU 13

STACU 14

STACU 15

WALL MNTD

WALL MNTD

WALL MNTD

WALL MNTD

WALL MNTD

WALL MNTD

2.5 HP

2.5 HP

1,865

1,865

1,865

STACU 16

220 V 1 60

WALL MNTD

2.5 HP 1,865

220 V 1 60

220 V 1 60

220 V 1 60

220 V 1 60

STACU 17

STACU 18

STACU 19

STACU 20

WALL MNTD

WALL MNTD

WALL MNTD

WALL MNTD

2.5 HP 1,865

STACU 21

220 V 1 60

WALL MNTD

2.5 HP 1,865

220 V 1 60

WALL MNTD

STACU 22

CEIS RM

CEIS RM

OPEN BAY

OPEN BAY

OPEN BAY

OPEN BAY

OPEN BAY

OPEN BAY

OPEN BAY

OPEN BAY

OPEN BAY

OPEN BAY

OPEN BAY

OPEN BAY

OPEN BAY

2.5 HP

2.5 HP

2.5 HP

2.5 HP

2.5 HP

2.5 HP

2.5 HP

1,865

1,865

1,865

1,865

1,865

1,865

1,865

COR. ATILANO DRIVE, TETUAN

ZAMBOANGA CITY, PHILIPPINES

Tel. nos. +63(062) 9922782, 9919539

Fax. no. +63(062) 9928310

Email Add: rv dagalea ent@yahoo.com

RVD BLDG., DON TORIBIO ST.

PRC No.

PTR No.

Place

Validity

Date

TIN

Validity

P R

O J E

C T

I T

L E

R E

V

D A

T E

R E

M A

R K

S

C O

M M

A N

D

C O

N

TR

O L

IN

TE

R A

G E

N C

Y F

U S

IO

N

C E

N

TE

R

Date:_________________ Signature:____________

AS BUILT

JAN 12, 2019

N6274224R6706_0002 Part 6 - Attachment 8

PPAC

PPAC

PPAC

PPAC

18 17 16

PPACPPACPPAC

PPAC

M

E T

E

W

D

E

C

O N

C R

E T

E

P

E R

I M

E T

E

W

A L

K W

A Y

LP

PP

PPAC

DP/MTS

5100 5000 5000 5000 5000 4750 3600

33400

SPP

PPAC

PPAC

PPAC

PPAC

PPAC

PPAC

PPAC

PPAC

PPAC

PPAC

PPAC

PPAC

PPAC

PPAC

COR. ATILANO DRIVE, TETUAN

ZAMBOANGA CITY, PHILIPPINES

Tel. nos. +63(062) 9922782, 9919539

Fax. no. +63(062) 9928310

Email Add: rv dagalea ent@yahoo.com

RVD BLDG., DON TORIBIO ST.

PRC No.

PTR No.

Place

Validity

Date

TIN

Validity

P R

O J E

C

T

L E

R E

V

D A

T E

R E

M A

R K

S

C O

M M

A N

D

C O

N

TR

O L

IN

TE

R A

G E

N C

Y F

U S

IO

N

C E

N

TE

R

0 1500 3000 6000

SCALE: 1:150

LEGEND

2.5 HP & 1.5 HP SPLIT TYPE WALL MOUNTED

SPLIT TYPE AIR CONDENSING UNIT

AIRCONDITIONING UNIT

2.5 HP SPLIT TYPE

WALL MOUNTED

2.5 HP SPLIT TYPE

WALL MOUNTED

1.5 HP SPLIT TYPE

WALL MOUNTED

2.5 HP SPLIT TYPE

WALL MOUNTED

2.5 HP SPLIT TYPE

WALL MOUNTED

1.5 HP SPLIT TYPE

WALL MOUNTED

2.5 HP SPLIT TYPE

WALL MOUNTED

PPAC

CIRCUIT HOMERUN

2.5 HP SPLIT TYPE

WALL MOUNTED

2.5 HP SPLIT TYPE

WALL MOUNTED

2.5 HP SPLIT TYPE

WALL MOUNTED

2.5 HP SPLIT TYPE

WALL MOUNTED

2.5 HP SPLIT TYPE

WALL MOUNTED

2.5 HP SPLIT TYPE

WALL MOUNTED

2.5 HP SPLIT TYPE

WALL MOUNTED

2.5 HP SPLIT TYPE

WALL MOUNTED

2.5 HP SPLIT TYPE

WALL MOUNTED

2.5 HP SPLIT TYPE

WALL MOUNTED

2.5 HP SPLIT TYPE

WALL MOUNTED2.5 HP SPLIT TYPE

WALL MOUNTED

Date:_________________ Signature:____________

AS BUILT

JAN 12, 2019

2.5 HP SPLIT TYPE

WALL MOUNTED

2.5 HP SPLIT TYPE

WALL MOUNTED

1.5 HP SPLIT TYPE

WALL MOUNTED

N6274224R6706_0002 Part 6 - Attachment 8

N6274242R6706_0002 Exhibit D. BOQ rev.

ACTIVITY AND LOCATION: CONSTRUCTION CONTRACT NUMBER:

N62742R 6706_0002

PROJECT TITLE: CONTRACTOR:

NUMBER UNIT UNIT COST TOTAL UNIT COST TOTAL TOTAL, USD

CLIN 1, BASE BID ITEM 1 - BUILDING RESTORATION

B20 EXTERIOR ENCLOSURE

B2010 Exterior wall - seal all wall penetrations, provide rubber bushings or grommets to protect cable wires

LS

B201007 Exterior Soffits - welded wire mesh, est 100 sqm

SQM

B2020 Exterior windows, sealing & weather stripping - 5 windows

EA

B2030 Exterior doors, sealing & weather stripping - 5 doors

EA

C30 INTERIOR FINISHES

C3020.a Floor Finishes - re-attach/restore damaged baseboards

LS

C302011 Raised Access Flooring and associated work

SQM

D30 HVAC - deep cleaning and refrigerant recharge, 22 Acs

EA

E20 FURNISHINGS

E2010 Relocate 4 TVs 1-ft lower EA

Z GENERAL REQUIREMENTS

Z01 Construction and utility permits from the base

SQM

Z02 Surveys; and incidentals LS Z03 Mobilization/Demobilization LS

OTHER ITEMS (List/Specify)

SUBTOTAL CLIN 0001

CLIN 2, OPTION ITEM 1 - CONSTRUCTION OF GUARD SHACK, SECURITY FENCE, GATE, COVERED WALKWAY

A10 FOUNDATIONS

A1020 Slab on Grade SQM

B10 SUPERSTRUCTURE

B1010 Floor construction sqm B1020 Roof construction, guard shack SQM

B20 EXTERIOR CLOSURE

B2010 Exterior Walls SQM B2020 Exterior Windows EA B2030 Exterior Doors EA

C10 INTERIOR CONSTRUCTION

C103005 Locker -1 unit EA C103008 custom built-in stainless steel desk counter tops with undercounter cabinets for secure storage.

LM

C103007 Fire Extinguisher Cabinets EA

C30 INTERIOR FINISHES

C3010 Wall Finishes SQM

NAVAFC ROICC Philippines

DATE SUBMITTED

COST PROPOSAL

D/B UFC Renovation of C2 Fusion Center, Basa Air Base

ITEM DESCRIPTION QUANTITY MATERIAL COST LABOR COST

FOR OFFICIAL USE ONLY

# SBU - CONTRACTING AND ACQUISITIONS 1 of 3

NUMBER UNIT UNIT COST TOTAL UNIT COST TOTAL TOTAL, USD

ITEM DESCRIPTION QUANTITY MATERIAL COST LABOR COST

C3020 Floor Finishes SQM C3030 Ceiling Finishes SQM

D30 HVAC

1 Window-type air conditioner EA 2 Ceiling fan EA 3 Exhaust fan EA

D40 FIRE PROTECTION

D4010 Fire extinguisher EA D4010 Manual pull fire alarm, smoke detector/s EA

D50 ELECTRICAL

D5010 Electrical Service assessment of existing conditions

LS

D5010 Upgrade the electrical system as necessary to accommodate the additional power requirements of the guard shack, covered walkway and fence.

LS

D5020 Lighting system and fixtures, guard shack SQM

G10 SITE PREPARATION

G1010 Site Clearing SQM G1030 Site Earthwork SQM

G20 SITE IMPROVEMENTS

G204001 Perimeter chainlink fence LM G204001 Vehicular sliding gate, 7-meter wide EA G204001 Turnstile gate EA

G40 SITE ELECTRICAL UTILITIES

G4020 Fence Exterior Lighting Fixtures and

Co…

This is the start of the file's text. The full file is on GovTribe.