About this file

This document is a Notice No. 2 providing pre-proposal questions and answers related to RFP N62742-24-R-1326 for the FY25 FHCON H-308 & H-434, Replace Andersen Housing, Phase IX & X projects at U.S. Naval Support Activity, Andersen Air Force Base, Guam.

The RFP is a two-phase design-build solicitation to construct up to 178 duplex units of three and four-bedroom, single-story family houses and single-family houses. Phase IX will construct up to 136 family units and Phase X will construct up to 42 family units. The notice addresses questions regarding the roles and responsibilities of the offeror and the proposed lead design firm/Designer-of-Record, as well as designer registration requirements. The RFP remains unchanged unless amended in writing.

View the file

Other files

File Type Posted
24R1326_Amd0001-Issued.pdf PDF
24R1326_Note3-Issued.pdf PDF
24R1326_Note1-Issued.pdf PDF
N6274224R1326-PH1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC

258 MAKALAPA DR STE 100

PEARL HARBOR HI 96860-3134

RFP N62742-24-R-1326

Notice No. 2

Notice No. 2 4 June 2024

PRE-PROPOSAL QUESTIONS & ANSWERS

RFP N62742-24-R-1326

WONs 1708755 & 1708756, FY25 FHCON H-308 & H-434, REPLACE ANDERSEN

HOUSING, PHASE IX & X, U.S. NAVAL SUPPORT ACTIVITY,

ANDERSEN AIR FORCE BASE, GUAM

NOTE: The following questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30.

2. Reference Doc. 00 22 00, FACTOR 1 – TECHNICAL APPROACH states that “The narrative shall include the roles and responsibilities of the offeror and the proposed lead design firm/Designer-of-Record”

Question: Are the DORs that have been involved in the preparation of the RFP or subsequent design reviews allowed to form part of the Contractors DOR team?

ANSWER: See the RFP Document 00 73 00, paragraph 1.2, ORGANIZATIONAL

CONFLICTS OF INTEREST.

3. Reference Doc. 00 22 00, FACTOR 1 – TECHNICAL APPROACH states that “The narrative shall include the roles and responsibilities of the offeror and the proposed lead design firm/Designer-of-Record”

Question: Are the DORs need to be Guam licenced PEs or if PE stamps from any US state are acceptable?

ANSWER: See FAR 52.236-25, Requirements for Registration of Designers (Jun 2003), which is provided as a By Reference clause in Document 00 70 00 of the RFP.