About this file
This document is a Notice No. 2 providing pre-proposal questions and answers related to RFP N62742-24-R-1326 for the FY25 FHCON H-308 & H-434, Replace Andersen Housing, Phase IX & X projects at U.S. Naval Support Activity, Andersen Air Force Base, Guam.
The RFP is a two-phase design-build solicitation to construct up to 178 duplex units of three and four-bedroom, single-story family houses and single-family houses. Phase IX will construct up to 136 family units and Phase X will construct up to 42 family units. The notice addresses questions regarding the roles and responsibilities of the offeror and the proposed lead design firm/Designer-of-Record, as well as designer registration requirements. The RFP remains unchanged unless amended in writing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 24R1326_Amd0001-Issued.pdf | ||
| 24R1326_Note3-Issued.pdf | ||
| 24R1326_Note1-Issued.pdf | ||
| N6274224R1326-PH1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
RFP N62742-24-R-1326
Notice No. 2
Notice No. 2 4 June 2024
PRE-PROPOSAL QUESTIONS & ANSWERS
RFP N62742-24-R-1326
WONs 1708755 & 1708756, FY25 FHCON H-308 & H-434, REPLACE ANDERSEN
HOUSING, PHASE IX & X, U.S. NAVAL SUPPORT ACTIVITY,
ANDERSEN AIR FORCE BASE, GUAM
NOTE: The following questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30.
2. Reference Doc. 00 22 00, FACTOR 1 – TECHNICAL APPROACH states that “The narrative shall include the roles and responsibilities of the offeror and the proposed lead design firm/Designer-of-Record”
Question: Are the DORs that have been involved in the preparation of the RFP or subsequent design reviews allowed to form part of the Contractors DOR team?
ANSWER: See the RFP Document 00 73 00, paragraph 1.2, ORGANIZATIONAL
CONFLICTS OF INTEREST.
3. Reference Doc. 00 22 00, FACTOR 1 – TECHNICAL APPROACH states that “The narrative shall include the roles and responsibilities of the offeror and the proposed lead design firm/Designer-of-Record”
Question: Are the DORs need to be Guam licenced PEs or if PE stamps from any US state are acceptable?
ANSWER: See FAR 52.236-25, Requirements for Registration of Designers (Jun 2003), which is provided as a By Reference clause in Document 00 70 00 of the RFP.