This document is a notice providing pre-proposal questions and answers related to solicitation N6274223R1319 for the FY24 Missile Defense Agency Project #699, Defense of Guam, Initial Deployment, at the Joint Region, Marianas, Guam. The notice addresses a question about drawings in the solicitation showing erosion control mat and notes requiring erosion control blankets on graded slopes steeper than 4H:1V. The answer references Amendment 0003 and directs offerors to specification sections 32 92 19 and 32 05 33 for definitions of the erosion control blanket and slope erosion control maintenance requirements.

View the file

Other files

File Type Posted
23R1319-Note1.pdf PDF
23R1319 Site Visit Attendees.pdf PDF
23R1319-AMD1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC

258 MAKALAPA DR STE 100

PEARL HARBOR HI 96860-3134

RFP N62742-23-R-1319

Notice No. 3

Notice No. 3

5 September 2023

PRE-PROPOSAL QUESTIONS & ANSWERS

RFP N62742-23-R-1319

FY24 MISSILE DEFENSE AGENCY PROJECT #699, DEFENSE OF GUAM, INITIAL

DEPLOYMENT, AT THE JOINT REGION, MARIANAS, GUAM

NOTE: The following questions and answers are provided for INFORMATION ONLY. The

RFP remains unchanged unless it is amended in writing on a Standard Form 30.

63. Drawing – C500 – (C3) shows Erosion Control Mat and CG124 – Note 6 states “Erosion control blankets to be placed on all graded slopes steeper than 4H: 1V.” If we need to follow specific specifications, please provide the required specifications for this erosion control mat/blanket.

ANSWER: Reference Amendment 0003. Specification Section 32 92 19, paragraph 2.7.1, defines the erosion control blanket. Specification Section 32 05 33, paragraph 3.4.4, defines the slope erosion control maintenance.