This document summarizes a solicitation for design and construction services for a new medical and dental clinic at Marine Corps Base Guam. Key details include that the project involves construction of a multi-story clinic to provide primary care, optometry, behavioral health, preventive medicine, pharmacy, laboratory, radiology, physical therapy, dental services, logistics support, and common areas. The estimated value is between $25-100 million. The period of performance is 730 calendar days. The solicitation is a competitive procurement requiring both technical and price proposals, with award going to the lowest-priced technically acceptable offer. The Navy Facilities Engineering Command is the contracting agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Notice No. 5.pdf | ||
| Notice No. 3.pdf | ||
| Notice No. 2.pdf | ||
| Notice No. 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING COMMAND, PACIFIC
258 MAKALAPA DR., STE. 100
PEARL HARBOR, HI 96860-3134
Notice No. 4 20 November 2020
PRE-PROPOSAL QUESTIONS & ANSWERS
RFP N62742-21-R-1333
J-025 GOJ MEDICAL/DENTAL CLINIC, FINEGAYAN,
US NAVSUPPACT MCB GUAM
NOTE: The following questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30.
68. Sheet Q-100. Please clarify the Specification Section for C02D0B,C05P0, C04F0, C05H0, C04P0, C03F0, C02Q0, C03L0, C0037, C04P0B, C04H0, C0039, C04J0, C04L0, CB020, CD040, CE030, CE040, CQ040, CT050, CT020, CT060, CW090, CW100, UE002, UE107B, UE108, UE110, UE111, UE112, UE114, UE115, UE116.
ANSWER: All Cxxxx JSN specifications are detailed under spec section 06 41 16.00 10 For the UExxx JSNs, please refer to responses to Notice #3 and Amendment 0002.
69. Specification Section 12 35 70 HEALTHCARE CASEWORK. Please advise whether items UE100, UE102, UE204, UE106, UE107 & UE109 are in contractor scope, as they are not shown in equipment schedule Sheet Q-100. Please clarify the location of items UE100, UE102, UE204, UE106, UE107 & UE109 as they are not shown in equipment schedule sheet Q-100
ANSWER: Please refer to responses to Notice #3 and Amendment 0002 regarding UExxx JSNs.
70. Specification Section 12 93 00 SITE FURNISHINGS. Please advise whether the Metal Pipe Bicycle Racks and the Waste Receptacles are in contractor scope. Please clarify the location of the Metal Pipe Bicycle Racks and the Waste Receptacles.
ANSWER: Provide 2 quantity Bicycle Racks and 3 quantity Waste Receptacles. Locations to be determined. See forthcoming Amendment 0003.
71. Specification Section 10 99 00 MISCELLANEOUS BUILDING SPECIALTIES. Please advise whether “Fire Department Access. Knox Box” is in contractor scope or not. Please clarify the location of “Fire Department Access. Knox Box.”
ANSWER: Fire Department Access Knox Box is part of the project and is to be provided by the contractor. Location is shown on A-119 near door 1J10A and on exterior elevation A-201.
72. Sheet A-601 Door #1B13A is type “B” & its size is (6’-0 x7’-0”) double door but reference to sheet A-603 type “B” is single door. Please clarify.
258 MAKALAPA DR., STE. 100
PEARL HARBOR, HI 96860-3134
ANSWER: Door type for 1B13A revised to B1 in the forthcoming Amendment 0003.
73. Sheet A-601 Door #1C10 is type “C” & its size is (6’-0 x7’-0”) double door but reference to sheet A-603 type “C” is single door. Please clarify.
ANSWER: Door type for 1C10 revised to C1 in the forthcoming Amendment 0003.
74. Sheet A-602 Door #2A01 & #2C10 are type “C” & their size is (6’-0 x7’-0”) double door but reference to sheet A-603 type “C” is single door. Please clarify.
ANSWER: Door type for doors 2A01 and 2C10 revised to C1 in forthcoming Amendment 0003.
75. Sheet A-602 Door #2B01 is type “D” & its size is (6’-0 x7’-0”) double door but reference to sheet A-603 type “D” is single door. Please clarify.
ANSWER: Door type for door 2B01 revised to D1 in forthcoming Amendment 0003.
76. Door Hardware Specification section 08 71 00 Hardware Set #6 is for aluminum doors but reference to door schedule Sheet #A-601 it is used for doors type “C,” #1AS1A & #1GS1A which are steel doors. Please clarify.
ANSWER: Doors 1AS1A and 1GS1A are aluminum doors and revised to door type B in forthcoming Amendment 0003.
77. Drawing E-602. Please specify if portable load bank shall be provided.
ANSWER: Portable load bank is not provided by the project.
78. Drawings ES-101 & E-505. Please confirm that B1 is a detail for “NL II” and “NL III;”
otherwise, please provide detail.
ANSWER: Yes. Detail B1/E-505 applies to all pole mounted lights which include poles labeled with “NL II” and “NL III” where NL stands for “Night Light” while II and II stands for the light distribution type.
79. Drawing E-604. Kindly provide location for x-ray machine.
ANSWER: Location of X-ray equipment (X5700) is shown on sheet EP118. Location of X-ray equipment will also be shown on E-403. Sheet E-403 will be revised via the forthcoming Amendment 0003 to clarify location of X-ray equipment.
80. Please confirm that SCADA System is not required in this project.
ANSWER: SCADA System is not required in this project.
81. Drawing EP-150. Please clarify Note 3 as it is not shown on drawings.
ANSWER: Note 3 on EP150 clarified in forthcoming Amendment 0003.
82. Drawing T-001, General Note 15. As per take off for the cat 6A cable for the longest run exceed 295ft, kindly confirm that it will be applicable.
ANSWER: Confirmed, note and 295ft length is applicable. Take off is a conservative estimate for cost purposes only. Actual cable lengths to rooms like 1C22 and 1D18 are ~280 ft. Note is included in case contractor makes field changes or modifications during construction.
83. Drawing T-301, cabinet schedule. Please confirm that the symbol “B” and “C” indicate 2RU 48 port single mode fiber optic patch panel, otherwise please provide description for “C.”
ANSWER: Confirmed “B” and “C” both indicate 2RU 48 port single mode fiber optic patch panel during construction.
84. Drawing T-001, Note 26. Please confirm that NO (CCTV system, IDS system, rescue system) will be in this contract scope, and all cameras and ESS system will be provided by the government, only conduits and cables are in the scope of work.
ANSWER: Confirmed, ESS (CCTV, IDS, and AACS) equipment and cabling to be provided by the government. ESS infrastructure (conduit, backboxes, pull strings, etc) will be provided by the J-025 contractor.
85. Drawing T-001. Please confirm that all (access control system, radio public address system, nurse call system) outlet devices, cables and conduit are in this contract scope of work
ANSWER: Complete PA and nurse call systems are included in the J-025 contractor scope of work. System requirements are included in specifications 27 51 16 and 27 52 24 and on the drawings. ESS systems include ESS infrastructure (conduit, backboxes, pull strings, etc) only and is included in the J-025 contractor scope of work.
86. The Finish Schedule A-660 and A-661 show rooms 1B15, 1G07, 1H25 and 2B06 Janitor’s Closet as having wall finishes of CT4, CT11, and PT5 on the South wall. Please provide the elevation with heights of finishes.
ANSWER: Provide CT4 wall tile full height on mop sink wall and return wall for mop sink side to depth of mop sink and trim with CT10 (matching bullnose). Provide PT5 on the remaining South wall. Omit CT11. See forthcoming Amendment 0003.
87. Room 1B14 Electric appears on the floor plans but not the finish schedule.
Please provide finishes.
ANSWER: The following finishes for 1B14 added in the forthcoming Amendment 0003
88. Room 1A05 Electric appears on the floor plans but not the finish schedule. Please provide finishes.
ANSWER: The following finishes for 1A05 added in the forthcoming Amendment 0003
89. Room 1C10 Electric appears on the finish schedule but not the floor plans. Please confirm.
ANSWER: 1C10 is located on A-114 along grid 4.
90. The Finish Schedule A-661 shows rooms 2B14 and 2C09 Lockers, Changing as having floor finishes of CT1 and CT5 , but AF121 and AF122 Floor Pattern Plans do not show a differentiation. Please provide the floor plans to clarify.
ANSWER: Per finish remark (NOTE 3) on the finish schedule for 2B14 and 2C09 - Provide CT5, mosaic sheet tile for the shower floor.
91. Finish Schedule A-661 lists rooms 2F15 and 2F15A, but the floor plans A-131 does not show 2F15A. A-661 says that the east wall of 2F15A has PT 1 and PT4 while 2F15 just has PT1, please provide clarification on location of PT4.
ANSWER: Delete 2F15A from the finish schedule. Provide PT4 on both North walls and the East wall in between that makes the jog. See the forthcoming Amendment 0003.
92. The Finish Schedule A-661 lists rooms 2G03 and 2G03A, but the floor plan does not show 2G03A. A-661 specifies the floor finish of 2G03 to be CPT1 and 2G03A to be VT1. Please clarify.
ANSWER: Delete room 2G03A from the Finish Schedule. Provide CPT1 in room 2G03. See forthcoming Amendment 0003.
93. The Finish Schedule A-661 lists rooms 2G03 and 2G03A, but the floor plan does not show 2G03A. A-661 specifies the north wall paint finish of 2G03 to be PT4 and 2G03A to be PT1. Please clarify.
ANSWER: Delete room 2G03A from the Finish Schedule. Provide PT4 on the North Wall of 2G03. See Amendment forthcoming 0003.
94. The Finish Schedule A-660 shows room 1G01 Wait to have a base of CT3 and CT11.
Please clarify where each base goes.
ANSWER: The CT11 base is dark grey which matches CT6, provide CT11 base on the south wall of block 1G (Reception Window Check-in Area). Please provide CT11 base on the north wall of 1F01 of block 1F (Reception Window Check-in Area). See forthcoming Amendment 0003.
95. Detail A1/A-141 calls out Louver Types L14 and L15 in Room 103 Chiller Yard Enclosure. Please confirm these should be Louver Type L13.
ANSWER: Louver types L14 and L15 revised to type L13 in forthcoming Amendment 0003.
96. Drawing A-710 calls for Panel System (PNL1) at the separation walls of the various reception plans. Details A3/A-711 and A1 & A3/A-712 call for Plastic Laminate (PNL1) at the walls. Please confirm these details shall be revised for Panel System (PNL1).
ANSWER: Walls between reception counters are Panel System PNL1 which has a plastic laminate finish. See Amendment 0003.
97. Section 05 12 00 paragraph 1.3 requires the “Structural Steel” to be AISC fabricated and Erected. Considering that the steel referenced by this section are interior columns from floor to floor of a concrete building, hoist beams or folding door partition head supports, please consider removing this requirement. There are no AISC certified erectors in Guam and the AISC requirement for fabrication of miscellaneous steel limits the competition and drives up the price.
ANSWER: Concur, that the structural steel for this project is “minor” in nature and not part of the primary load-resisting system. Requirements deleted in Amendment 0003.
98. Section 05 12 00 paragraph 2.5 indicates galvanizing. Please confirm that only exterior steel (Structural or Miscellaneous) should be galvanized.
ANSWER: Structural steel and miscellaneous metal exposed to weather shall be hot-dipped galvanized.
99. Section 05 50 13 paragraph 2.2.5 indicates stair nosing. The drawings to not show nosing.
Are they required?
ANSWER: Stair nosing to be provided at all concrete stairs. See forthcoming Amendment 0003.
100. Section 05 50 13 paragraph 2.2.4 indicates expanded metal security mesh. Please locate this in the documents. Is the chain link fencing indicated for the generator building?
ANSWER: Expanded metal security mesh occurs at partition F3S. See forthcoming Amendment 0003.
101. Detail B1/A740 indicates a typical roofing strainer that has a clamp down function (IE:
Zurn type “Cornice”). The specification section just indicates a strainer in section 07 60 00 paragraph 3.1.4 on page 3. Please clarify the intent.
ANSWER: See Specification Section 22 00 70 for RD-1 as shown in the detail. See forthcoming Amendment 0003 for clarified detail note.
102. Specification Section 10 71 13.13 Storm Shutter Paragraph 2.2.1.1 - Specification calls for the shutter blades to be 0.50 thick minimum. This must be a typo as the blade thickness is usually around .050 thick. Please clarify.
ANSWER: Wall thickness of slats revised to 0.050 in forthcoming Amendment 0003.
103. Specification Section 10 71 13.13 Storm Shutter Paragraph 2.3.1 – Would powder coated shutters be acceptable in lieu of anodized?
ANSWER: Base construction and appearance standard is dark bronze anodized aluminum.
104. Specification Section 10 71 13.13 Storm Shutter. Would shutters with wind speed of 180 mph and tested to 200 mph missile impact test be acceptable? (The wind speed was mentioned on Drawing S001 Notes)
ANSWER: Specifications para 1.5 indicates shutters to withstand minimum wind load indicated on the structural drawings. Refer to S-007, S-008.
105. Doors as below are required to have Electric Strike per A-601 and A-602. Whereas they are required to have Electric Mortise Lock F07 x E06 per Spec 08 71 00. If you use Electric Lock, you won’t use Electric Strike. Please clarify. If Electric Strike is required to be used, then Storeroom Function Lock is to be used in couple with the Electric Strike.1A01, 1A02, 1A04, 1B07, 1B11, 1F07, 1F09, 1G03, 1G12, 1H09, 1J05, 1J07, 2A01, 2A02, 2A04, 2B01, 2B04, 2B14, 2C06, 2C08, 2C09, 2C15, 2C16, 2C17, 2F02, 2F03, 2F14, 2G02, 2G03, 2G04, 2HC3.
ANSWER: Electric strikes were deleted and Specification Section 08 71 00 revised in Amendment 0001.
106. Doors as below are required to have Electric Strike per A-601 and A-602. Whereas they are required to have Electric Rim/Concealed Vertical Rod Exit Device per Spec 08 71 00. If you use Electric Exit Devices, you won’t use Electric Strike. If you use Electric Strike, Non-Electric Exit Device is required to be used. Please clarify. 1A01A, 1B13, 1B13A, 1B14A, 1D07A, 1G06, 1J01, 1J07B, 1J10A, 2B13
ANSWER: Electric strikes were deleted and Specification Section 08 71 00 revised in Amendment 0001.
107. TY501 / Spec 08 71 00, 3.6 Hardware Sets. Are all the AACS Interfacing Door Locks/Exit Devices required to have request to exit switch?
ANSWER: Request to exit switch is not required. Hardware provides free egress.
108. TY501 / Spec 08 71 00, 3.6 Hardware Sets. The Spec Hardware Set is missing Power Supply and BMS. Who supplies them?
ANSWER: The low voltage power supply and BMS should be supplied by the government similar to all the ESS equipment and devices.
109. NFPA 70. Rooms with equipment using 600V or less/ 800A or more are to have exit device operated doors and to swing out. Please clarify the doors below for the 600V/800A threshold. 1A01, 1B07.
ANSWER: Rooms 1A01 and 1B07 do not have electrical equipment rated 800A or more. The doors do not require a panic hardware but the door for room 1B07 shall swing out. See forthcoming Amendment 0003.
110. A-112. DOOR 1AS1. Which side is to be keyed to lock/unlock? Pull side or push side of the door? Please clarify.
ANSWER: Door should be keyed from inside the stairs.
111. A-601, A-602. Doors as below are required to be STC-40 minimum per A-601 and 602, though. They are not specified as what STC rating in A-601 and A-602. Please clarify. 1B01, 1B04, 1B06, 1C01, 1C03, 1C05, 1C07, 1C14, 1C16, 1C18, 1C20, 1C22, 1D01, 1D02, 1D03, 1D07, 1D09, 1D11, 1D16, 1D18, 1D19, 1F02, 1F04, 1F06, 1F08, 1F10, 1G08, 1G12, 1H02, 1H03, 1H06, 2B14, 2C09, 2F16.
ANSWER: Doors are not considered an “STC rated” assembly. Door Schedule A-601 and A- 602 in Remarks column indicate “4” which is to provide doors with sound core of STC 40 minimum.
112. S-001. Any requirements for blast rating on doors and windows other than UFC 4-010-01 "DoD Minimum Antiterrorism Standards for Buildings" 12 Dec. 2018 that is required by S-001 drawing?
ANSWER: Facility will need to meet the minimum standards in UFC 4-010-01 Chapter 3.
113. TY601, TY114. Door 1CS1 is to interface with AACS per TY601, but not per TY114.
Door 1CS1A is to interface AACS per TY114. Please clarify.
ANSWER: TY601 should be “1CS1A” instead of “1CS1”. See forthcoming Amendment 0003.
114. TY601, A-117. Door 1G05 is to interface AACS per TY601, though it is not shown in A-117. Please clarify.
ANSWER: TY601 should be “1G12” instead of “1G05”. See forthcoming Amendment 0003.
115. Doors as below are required to interface AACS per TY117, TY601, TY119, though they are not to interface AACS per A-601. Please clarify. 1GS1, 1GS1A
ANSWER: AACS should be provided for 1GS1A. TY601 should be “1GS1A” instead of “1GS1”. See forthcoming Amendment 0003.
116. Doors as below are required to interface AACS per TY117, TY119, though they are not to interface AACS per TY601. Please clarify. 1G12, 1J07
ANSWER: TY601 should be “1J07” instead of “1J07A”. TY601 should be “1G12” instead of “1G05”. See forthcoming Amendment 0003.
117. Door as below is required to interface AACS per TY601, though it is not to interface AACS per TY119. Please clarify. 1J07A
ANSWER: TY601 should be “1J07” instead of “1J07A”. See forthcoming Amendment 0003.
118. Door as below is required to interface AACS by keypad controlled Electric Strike per A- 601, though Card Reader and Electric Lock are to be used per TY601 and TY119. Please clarify.
1J09
ANSWER: Electric controlled strikes were deleted and specification section 08 87 00 was revised in Amendment 0001.
119. There are discrepancies between finish schedule and Reflected Ceiling Plan and Floor Pattern Plans. Room 1B20 – Finish Schedule calls out for AT1 ceiling. RCP shows exposed.
ANSWER: The RCP is correct, provide Exposed ceiling for 1B20. See forthcoming Amendment 0003.
120. There are discrepancies between finish schedule and Reflected Ceiling Plan and Floor Pattern Plans. Room 1F04 – Finish Schedule calls out for PT9. RCP shows acoustic ceiling tile.
ANSWER: The Finish Schedule is correct, per UFC, ceiling in 1F04 to be PT9. See forthcoming Amendment 0003.
121. There are discrepancies between finish schedule and Reflected Ceiling Plan and Floor Pattern Plans. Room 1H25 – Finish Schedule calls out for PT9. RCP shows exposed.
ANSWER: The Finish Schedule is correct, per UFC, ceiling in 1H25 to be PT9. See forthcoming Amendment 0003.
122. There are discrepancies between finish schedule and Reflected Ceiling Plan and Floor Pattern Plans. Room 2C04 – Finish Schedule calls out for PT9. RCP shows acoustic ceiling tile.
ANSWER: The RCP is correct. Provide AT3 for Room 2C04. See forthcoming Amendment 0003.
123. There are discrepancies between finish schedule and Reflected Ceiling Plan and Floor Pattern Plans. Room 2C19 – Finish Schedule calls out for PT9. RCP shows acoustic ceiling tile.
ANSWER: The RCP is correct. Provide AT3 for Room 2C19. See forthcoming Amendment
124. There are discrepancies between finish schedule and Reflected Ceiling Plan and Floor Pattern Plans. Room 2C21 – Finish Schedule calls out for PT9. RCP shows acoustic ceiling tile.
ANSWER: The RCP is correct. Provide AT3 for Room 2C21. See forthcoming Amendment 0003.
125. Please provide additional details and profile for the wood panel ceiling at Room 1F01.
ANSWER: Additional information shown on detail A3/A-504. See forthcoming Amendment 0003.
126. Please clarify items below for ceiling bracing shown in Detail B3/A-701. Please provide spacing of this bracing detail and please indicate locations this needs to be installed.
ANSWER: Refer to ASTM E580/E580M identified in Specification Section 09 51 00 -
ACOUSTICAL CEILINGS.
127. Please clarify items below for ceiling bracing shown in Detail B3/A-701. Please advise thickness of steel plate shown at the top of detail. Steel plate is currently noted to be 4” thick.
ANSWER: Steel plate should be ¼” thick. See forthcoming Amendment 0003.
128. Please clarify items below for ceiling bracing shown in Detail B3/A-701. Pipe shown connected to the steel plate is shown to be 1” diameter, however there is a note below this callout indicating an 8” diameter or 6” long pipe. Please clarify size and dimensions of the pipe connected to the steel plate and ceiling main runner.
ANSWER: See forthcoming Amendment 0003.
129. Reference sheets, A-601, 602, and TY drawings/SPECIFICATION 08 71 00, 3.6 HARDWARE sets; Below doors are required to have electric strike per A-601 and A-602. Spec section 08-71-00 calls for these doors to have electric Mortise Lock F07-E06. If an electric lock is used, an electric strike is not necessary. Please clarify that an electric strike is to be used in couple with the storeroom function lock for doors (1A01, 1A02, 1A04, 1B07, 1B11, 1F07, 1F09, 1G03, 1G12, 1H09, 1J05, 1J07, 2A01, 2A02, 2A04, 2B01, 2B04, 2B14, 2C06, 2C08, 2C09, 2C15, 2C16, 2C17, 2F02, 2F03, 2F14, 2G02, 2G03, 2G04, 2HC3).
ANSWER: Electric strikes were deleted and Specification Section 08 71 00 revised in Amendment 0001.
130. Reference A-601, 602, and TY drawings/SPECIFICATION 08 71 00, 3.6 HARDWARE sets; Below doors are required to have electric strike per A-601 and A-602. They are required to have electric rim/concealed vertical rod exit device per Spec Section 08 71 00. If an electric strike is used, a non-electric exit device is required. An electric exit device cannot be used with an electric strike. Please clarify. DOORS (1A01A, 1B13, 1B13A, 1B14A, 1D07A, 1G06, 1J01, 1J07B, 1J10A, 2B13).
ANSWER: Electric strikes were deleted and Specification Section 08 71 00 revised in Amendment 0001.
131. Reference TY501 / SPECIFICATION 08 71 00, 3.6 HARDWARE Sets;
Please clarify if all the AACS interfacing door locks/exit devices are required to have request to exit switch.
ANSWER: Request to exit switch is not required. Hardware provides free egress.
132. Reference TY501 / SPECIFICATION 08 71 00, 3.6 HARDWARE Sets; The Hardware Specification is missing power supply and BMS information. Please advice and confirm who provides the BMS.
ANSWER: The low voltage power supply and BMS should be supplied by the government similar to all the ESS equipment and devices.
133. Per NFPA 70, Rooms with equipment using 600V or Less/800A or more, are to have exit device operated doors and to swing out. Please clarify the 600V/800A threshold for doors 1A01 and 1B07.
ANSWER: Rooms 1A01 and 1B07 do not have electrical equipment rated 800A or more. The doors do not require a panic hardware but the door for room 1B07 shall swing out. See forthcoming Amendment 0003.
134. Reference Sheet A-112; For Door 1AS1, which side is to be keyed to lock/unlock? Pull side or push side of the door? Please clarify.
ANSWER: Door should be keyed from inside the stairs.
135. Reference Sheets A-601 and A-602; Door Schedule is missing STC rating for doors 1B01, 1B04, 1B06, 1C01, 1C03, 1C05, 1C07, 1C14, 1C16, 1C18, 1C20, 1C22, 1D01, 1D02, 1D03, 1D07, 1D09, 1D11, 1D16, 1D18, 1D19, 1F02, 1F04, 1F06, 1F08, 1F10, 1G08, 1G12, 1H02, 1H03, 1H06, 2B14, 2C09, and 2F16. Please provide updated door schedule indicating STC rating for these doors.
ANSWER: Doors are not considered an “STC rated” assembly. Door Schedule A-601 and A- 602 in Remarks column indicate “4” which is to provide doors with sound core of STC 40 minimum.
136. Reference S-001; Any requirements for blast rating on doors and windows other than UFC 4-010-01 “DOD Minimum Antiterrorism Standards for Building” 12 December 2018 that is required by S-001 drawing? Please clarify.
ANSWER: Facility will need to meet the minimum standards in UFC 4-010-01 Chapter 3.
137. Reference TY601 and TY114; Door 1CS1 is to interface with AACS per TY601, but not per TY114. Door 1CS1A is to interface with AACS per TY114. Please clarify.
ANSWER: TY601 should be “1CS1A” instead of “1CS1”. See forthcoming Amendment 0003.
138. Reference TY601 and A-117; Door 1G05 is to interface with AACS per TY601. Sheet A- 117 does not show this. Please clarify.
ANSWER: TY601 should be “1G12” instead of “1G05”. See forthcoming Amendment 0003.
139. Reference TY117, TY601, TY119, and A-601; Doors 1GS1 and 1GS1A are required to interface with AACS per TY117, TY601 and TY119. They are not to interface with AACS per A-601. Please clarify.
ANSWER: AACS should be provided for 1GS1A. TY601 should be “1GS1A” instead of “1GS1”. See forthcoming Amendment 0003.
140. TY117, TY119, and TY601; Doors 1G12 and 1J07 are required to interface with AACS per TY117, and TY 119. They are not to interface with AACS per TY601. Please clarify.
ANSWER: TY601 should be “1J07” instead of “1J07A”. TY601 should be “1G12” instead of “1G05”. See forthcoming Amendment 0003.
141. Reference TY601 and TY119; Door 1J07A is required to interface with AACS per TY601. It is not to interface with AACS per TY119. Please clarify.
ANSWER: TY601 should be “1J07” instead of “1J07A”. See forthcoming Amendment 0003.
142. Reference A-611A, A-612A and Specification Section 08 71 00; 3.6 Hardware Sets;
Door 1J09 is required to interface with AACS by keypad controlled electric strike per A-601.
Card reader and electric lock are to be used per TY601 and TY119. Please clarify.
ANSWER: Electric strikes were deleted and Specification Section 08 71 00 revised in Amendment 0001.
143. Drawing sheet A-430 indicates the face of the pharmacy reception counter to be PL3 & PL1, but drawing sheet A-711 indicates the face needs to be PLN1. Please clarify which wall panel should be used?
ANSWER: A-430 indicates the correct finishes. See forthcoming Amendment 0003.
144. Reference Specification Section 12 35 70 – Healthcare Casework and Drawing Q-100. Below items on the Q-100 List are not listed in this specification section. Please clarify if below items belong to Specification Section 12 35 70. If not, please provide material type and detail elevation drawings. (C02C0B, C02D0B, C02Q0, C03F0, C03L0, C04F0, C04H0, C04J0, C04L0, C04P0, C04P0B, C05H0, C05P0, C0037, C0039, CB020, CD040, CE030, CE040, CQ040)
ANSWER: The items noted are not considered Healthcare Casework. Specifications for these items fall under 06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS. They are shown on the interior elevation drawings, sizes noted on A-680.
145. Drawings sheet M-605, Note 4 specifies the following “DDC (Direct Digital Control Systems) shall be Metasys System product of Johnson Controls. Is an alternate DDS system that is capable of integration with JCI Metasys System via specified BACnet protocol be acceptable?
ANSWER: Metasys System from Johnson Controls is approved as a proprietary product and is required for this project.
146. Response on RFI No. 63 on Notice No. 3 states that structural steel columns located at grids C.5/2 and 3/D.5-E.5 between 1st and 2nd floor are all HSS 3x3x3/4 contrary to structural steel column size indicated on Structural Drawing sheet S-113 which shows HSS3x3x1/4. Please confirm if structural steel column size will revert to HSS3x3x1/4 as per Structural Drawing considering HSS3x3x3/4 is not a standard size.
ANSWER: Follow structural drawings for steel sizes.
147. Confirm if probe holes with no cavities can be backfilled with grout by gravity slowly pouring in from one side of the probe hole to avoid trapping air.
ANSWER: Follow specification section 31 32 23 paragraph 3.3.2.2.
148. We respectfully request an extension of bid time for about four weeks from December 2, 2020 to December 30, 2020. This request is asked due to the Covid-19 situation and the multiple on-going military bids.
ANSWER: The Government will not be granting an extension.