This document contains a notice of questions and answers related to a solicitation for construction services at Marine Corps Base Hawaii. The solicitation seeks a contractor to construct an entry control point and security improvements at a perimeter gate, including an overwatch tower and station, generator and communications buildings, a gate house with guard booth and canopy, and a privately owned vehicle inspection area with canopy. The work includes concrete foundations, slabs, walls and roofs. The document provides answers to clarification questions from prospective offerors on technical requirements and contract details such as treatment of endangered birds, treatment of existing utilities, and definitions of relevant project experience.

View the file

Other files

File Type Posted
Notice No. 2.pdf PDF
Notice No. 1.pdf PDF
Site Visit Sign In.pdf PDF
N6274220R1304 Amd No. 0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

NAVAL FACILITIES ENGINEERING COMMAND, PACIFIC

258 MAKALAPA DR., STE. 100

PEARL HARBOR, HI 96860-3134

Notice No. 3 7 July 2020

PRE-PROPOSAL QUESTIONS & ANSWERS

RFP N62742-20-R-1304

FY18 P-877 MOKAPU GATE ENTRY CONTROL AT/FP COMPLIANCE MARINE COPRS

BASE HAWAII, KANEOHE BAY, HAWAII

NOTE: The following questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30.

RESPONSES DEFERRED FROM NOTICE NO. 2 DATED 1 JULY 2020

59. Reference: SPEC SECTION 01 57 19 Page 17 paragraph : 3.1.4 Endangered Birds reads:

3.1.4 Endangered Birds

Due to the large numbers of endangered birds on Base, the Contractor must continually monitor the area for endangered birds in the construction zone and laydown yard to avoid injuring, killing or harassing them whether intentionally or inadvertently by vehicles or personnel working on site.

The endangered birds that may appear at or near the construction site are the Hawaiian stilt and Hawaiian duck.

Furthermore, Environmental note No 2 on sheet G-004 indicates that nesting season of water birds is from 01 April to 01 September of each year.

Is there any restriction on construction activities during nesting season (April 1st to September 1st)? If so, please advise which activities shall not be performed during this season?

ANSWER: Contractor must avoid injuring, killing or harassing endangered birds as specified in the contract documents. If birds, nests or eggs are encountered, move all equipment/personnel at least 20 ft away from the birds, eggs or nest to protect the site, and immediately notify the Contracting Officer for additional directions. See Amendment 0004.

60. Reference: SPEC SECTION 01 57 19 Page 17 paragraph : 3.1.4 Endangered Birds reads:

3.1.4 Endangered Birds

Due to the large numbers of endangered birds on Base, the Contractor must continually monitor the area for endangered birds in the construction zone and laydown yard to avoid injuring, killing or harassing them whether intentionally or inadvertently by vehicles or personnel working on site.

What precautions need to be taken other than monitoring the area of endangered birds?

ANSWER: Avoid creating mud puddles or leave standing water because it may attract birds. If any bird is injured or killed, do not move it, and immediately report it to the Contracting Officer.

See Amendment 0004.

61. Reference: SPEC SECTION 01 57 19 Page 17 paragraph : 3.1.4 Endangered Birds reads:

3.1.4 Endangered Birds

Due to the large numbers of endangered birds on Base, the Contractor must continually monitor the area for endangered birds in the construction zone and laydown yard to avoid injuring, killing or harassing them whether intentionally or inadvertently by vehicles or personnel working on site.

Do we have to consider that the entire site will have endangered birds?

ANSWER: As noted and specified “The endangered birds that may appear at or near the construction site are the Hawaiian stilt and Hawaiian duck.”

62. Reference: SPEC SECTION 01 57 19 Page 17 paragraph : 3.1.4 Endangered Birds reads:

3.1.4 Endangered Birds

Due to the large numbers of endangered birds on Base, the Contractor must continually monitor the area for endangered birds in the construction zone and laydown yard to avoid injuring, killing or harassing them whether intentionally or inadvertently by vehicles or personnel working on site.

If construction activities are stopped or slowed down due to presence of endangered birds, will the successful contractor be compensated for time extension and additional costs incurred due to delay? If not, shall all contractors factor in the bid possible delays due to endangered birds? If so, how many days of delay we need to factor in?

ANSWER: The Contractor shall schedule all clearing and grubbing activities with consideration of the information provided in the contract documents, and bids shall be based on the contract documents. Time extension and additional cost incurred because of delays due to the presence of endangered birds may be addressed in accordance with the contract documents.

63. 4” Topsoil for grass restoration of all disturbed areas. Please confirm that imported 4” top soil shall be provided for grass restoration of all disturbed areas.

ANSWER: Onsite material shall be utilized in accordance with Section 31 23 00.00 20 and Section 32 92 19.

64. Site Demolition plans CD101 thru CD108 indicate clearing and grubbing, trees removal, signs removal, street lights removal and other items need to be removed on both sides of Mokapu road.

Please confirm that cost of removal of all items above listed shall not be included in CLIN 0005 & CLIN 0006 (Deductive items 4 & 5). In other words, the above items shall be performed regardless whether deductive items 4 & 5 are exercised or not.

ANSWER: Confirmed. The demolition for CLIN 0005 and CLIN 0006 includes the removal of the top two inches of AC pavement.

65. Bid Item # 0008: Deductive Item No.7: The Basis for deductive item no.7 is to delete Concrete Barrier Curbs. Question: Does all the 18” Barrier Curb comes under this deductive item or only 18” Barrier curb Specified in the drawing? Because there is this concrete barrier curb on the either side of AC pacing from STA 26+92 to 31+52 and also on right side of AC Paving from STA 17+20 to 26+73. This AC pavement comes under “Bid Item # 0006:

Deductive Item No.5: The Basis for this deductive Item No.5 is to delete road near ECP”. Please advise if this 18” Barrier curb falls under Bid Item # 0006 or Bid Item # 0008 or Base Bid Item # 0001.

ANSWER: Only the 18” barrier curbs indicated on the drawings as Deductive Item No. 7 (CLIN 0008) are included in this deductive. All other barrier curbs are included in CLIN 0001.

66. Is the 18” Barrier Curb @ Island “F” part of Deductive Item No. 07 (CLIN 0008) as shown on CS404, or the base bid as shown on CS107 and CS108?

ANSWER: The 18” barrier curb for Curb Island “F” is included in the base bid. See revised drawings in Amendment 0004.

67. Is the pavement striping of Mokapu Rd. included in Deductive Item No. 04 (CLIN 0005) & Deductive Item No. 05 (CLIN 006) as described on sheets CP102 to CP109? Please confirm, this means that if Deductive items No 4 and/or 5, is accepted, striping on the relevant portions of Mokapu Rd. is also deducted.

ANSWER: The center line and shoulder lane striping is the only striping included in Deductive Item No. 4 (CLIN 0005) and Deductive Item No. 5 (CLIN 0006). See revised drawings in Amendment 0004.

68. Is the 18” Barrier at the Perimeter Gate Control House, 4’-6” w/ 12”Below Grade = 3’6” tall shown on structural sheets S-101, S-107, A1/S-501 and A1/S-503, or 3’-0” Tall, as shown on architectural A-101, A-104, A-201, A-203, A-301, A-302, and A-303?

ANSWER: The 18” barrier at the perimeter gate is 3’-0” tall. See revised drawings in Amendment 0004.

69. Where the ECP Canopy is located and dimensioned per architectural and structural drawings, the 6” curb & island around the columns and the columns themselves conflict with the 18” Barrier curb on the roadway through the canopy, as shown on the civil drawings. If there is supposed to be a 6” curb and slab infill around the ECP Canopy columns, please show how to incorporate or terminate the 18” barrier curb.

ANSWER: The concrete curb island has been removed. The barrier curb will terminate at each column. See revised drawings in Amendment 0004.

70. Is the POV Search Canopy footing 6’ wide x 46’ long as shown on B1/A-109 or 7’ wide x 52’ long as shown on S-111 & C2/S-507?

B. Is there a slab above the footing (not shown) with different dimensions? Where is finish grade on detail C2/S-507?

ANSWER: The concrete sidewalk above footing is 6’x46’. The structural footing is 7’x52’.

C2/S-507 revised to show slab above footing, finish grade/AC Pavement, and relative depth of footing. There is no concrete pavement at the POV Search Canopy. See Drawing CP107.

71. (FYI, no cost implications) The door position on the exterior wall at the electrical room and comm room at the two Utility Buildings is different on the architectural plans and the structural plans. Please confirm the architectural layout is to be followed in this case.

ANSWER: Confirmed. The architectural layout is the correct location.

72. Regarding the two Overwatch Stations. Is the foundation 16” thick per plan on S-104 and S-110? Or 24” thick per detail C1/S-506?

ANSWER: The foundation is 24” thick. S-104 revised in Amendment 0003, S-110 revised for Amendment 0004.

73. Regarding the two Overwatch Stations. Do the 8” concrete stem walls have #5 @ 12” each way, on each face per note on S-104 and S-110 or a single centered mat #5 @ 12” each way?

ANSWER: Single mat #5@12” EW. S-104 revised in Amendment 0003, S-110 revised in Amendment 0004.

74. Regarding the two Overwatch Stations. Is the building 6’ wide per the structural plans or 6’-4” wide per the architectural plans?

ANSWER: The architectural dimensions are correct. 6’- 4” is correct per architectural. S-104 was revised in Amendment 0003. S-110 is revised in Amendment 0004.

75. Regarding the two Overwatch Stations. Detail A1/S-506 shows a “soffit” 1’-1” tall, at the edges of the building. The architectural sheets show this “soffit/wall” as >3’ tall, varying with the slope of the roof. Both are suspended from the concrete roof. Please confirm that the two cantilevered beams and two columns are intended to support the concrete roof with the hanging concrete “soffit/walls”. Please confirm the glass windows are not intended to support the roof structure.

ANSWER: Confirmed. The two cantilever beams and two columns are designed to support the concrete room. Glass windows are not designed to support the roof structure. See revised detail A1 on drawing S-506 in Amendment 0003.

76. Regarding the two Overwatch Stations. What is filling the space above the door? There seems to be no material in this space per the details on sheets A-206, A-305, or A-403.

ANSWER: The material above the door shall be filled with concrete. The Outside Air Register will be mounted on the wall space above the door. The outside air duct will be routed from the Fan Coil Unit in ceiling space, down through the ceiling tile near the door to connect to the OAR as shown on amended sheet M-301. See revised drawing M-301 in Amendment 0004.

77. Regarding the concrete encasement/protection of the communication lines to remain: on sheet CU102, encasement of duct lines are shown for one of the lines as it crosses each of the travel ways. On sheets ET104 and ET105, there is a second line shown, going from an existing hand hole near the POV search Canopy to the east. Please confirm this line requires protection in the same manner as the other line shown protected on CU102.

ANSWER: Confirmed. See Drawing ET102. Drawing CU102 has been revised and is included in Amendment 0004.

78. Is the contractor required to maintain bike/pedestrian access/passage along the north side of Mokapu Road (bike lane) during construction?

ANSWER: Yes. Bike and pedestrian access shall be maintained, with the exception of required lane closures.

79. Is there a joint pattern for the concrete pavement at the Perimeter gate for the contractor to follow? There seems to be evidence of a jointing plan visible on the electrical site plan E-110 and ET109, at approximately 10’ squares. Can we assume this pattern for bidding purposes?

ANSWER: See revised drawing CS401 in Amendment 0004.

80. Please provide a detail for “contraction joints” for concrete pavement.

ANSWER: See revised drawing C-518 in Amendment 0004.

81. What is the size (diameter) and spacing for the smooth dowels at the construction joints?

This information is missing from detail C4/C-518.

ANSWER: See revised drawing CS401 in Amendment 0004.

82. In specification section 31 23 00.00 20 paragraph 3.15.2.4, please consider clarifying the requirements for compaction testing subgrade and fill materials every 250 SF to apply only to subgrades and structural fills below buildings/foundations. For the open site grading and compaction, such as below the gravel pavement, sidewalks, vegetated berms, & AC roads, recommend the requirement could be changed to something less stringent; possibly one test per 250 square yards? As an example, the >28,000 SF of Type A Gravel Pavement, would require ~112 density tests on the subgrade. Testing on a 16’ grid, seems excessive, for areas that will receive a fairly consistent compaction effort.

ANSWER: Section 31 23 00.00 20, paragraph 3.15.2.4 has been revised. See Amendment 0004.

83. Will the Govt. consider a reduction in conduit size from 6” to 5” for duct sections A and B? (11.5 KV, med voltage conduits).

ANSWER: The primary electrical duct lines can be reduced to 5” ducts. Please also confirm with MCBH Electric Shop.

84. E-604, One-Line, Perimeter Gate-New. Voltage Characteristics indicate 240v single phase. Shall a 3p200a breaker be provided for the meter main and the enclosed circuit breaker?

ANSWER: The meter main and enclosed circuit breaker should be labeled as 2P200A. See Amendment 0004.

85. Shall a provision for switching of the neutral conductors be provided within the respective ATS units as indicated on the drawings?

ANSWER: Yes. The generator is being treated as a separately derived system.

86. E-401 - Confirm panel designation 2EDP is correct for this location.

ANSWER: The GTCB Perimeter Gate panel should be designated as 2PDP. See Amendment 0004.

87. E-111,112,552 - Identify location of type S3 fixture and provide data for type S2 fixtures.

ANSWER: There are no type S3 light fixtures. The detail B1 on E-552 revised to type S2 to match the light distribution type. See Amendment 0004.

88. ET-507, Det A2, Reference to E-408 (Nonexistent page) - Confirm references to pole locations and quantities.

ANSWER: Detail should reference to ET112. The location is shown on sheet ET112. See revised drawing in Amendment 0004.

89. ET-103, note 2 - Confirm reference to Bid Item 6.

ANSWER: The Overwatch Station at the Final Denial Barrier should be DEDUCTIVE ITEM NO. 02 (CLIN 0003). See Amendment 0004.

90. ET-701 - Confirm the contractor shall ONLY install new conduit and interduct(s) without wires from TMH 105-TMH 100 as shown on the Telcom Cable Schematic Diagram.

ANSWER: Confirmed. Per S-6, all OSP cabling work will be done by PES-HI Contractor.

92. Det C2/S-507. Footing detail does not provide note for stir-ups.

ANSWER: See revised Detail C2/S-507 that indicates required reinforcing. See Amendment 0004.

93. S-105, A-101. At the ECP canopy, what floor finish will be between columns. All sections are drawn at columns, and no notes are shown on floor plans.

ANSWER: Specification Section 03 31 30, Paragraph 2.8.2 indicates a Liquid Chemical Sealer- Hardener Compound shall be applied to the concrete surfaces.

94. S-111, C2/S-507. Architectural elevation and sections show a curb? or the footing has 6” exposed? Please clarify Provide footing elevation/ Finish floor elevation for the POV Canopy.

ANSWER: Finish floor is 6”: above top of AC Pavement, top of footing is 18” below top of AC Pavement. See revised Detail C2 of Drawing S-507 in Amendment 0004.

95. CS401. Perimeter Gate Control house concrete Apron details are not provided. Provide Concrete and reinforcing Apron detail.

ANSWER: See Detail A1 on C-518.

96. CS402. Vehicle Barrier “A” and “B” does not provide any details for concrete work.

Provide concrete and reinforcing details.

ANSWER: See revised Sheet CS402 in Amendment 0003.

97. CS106. There appear to be five (5) bollards in front of a 22-ft wide sliding gate. Please confirm these are manual retractable bollards per A2/C-504.

ANSWER: Confirmed.

98. CS106. Manual retractable bollards are located on clusters throughout the project. Detail provided shows one bollard detail. Please provide a bollard cluster detail.

ANSWER: Provide bid in accordance with contract documents. Bollard foundation may vary by manufacturer. Contractor to coordinate with bollard manufacturer and in accordance with Specification Section 34 71 13.19.

99. C504. Please provide a site plan where ALL bollards are called out. Locations are not clear. i.e Concrete for sliding gate (C1/C-504) show circles, similar to how bollards are shown on other locations, but no bollard is called out.

ANSWER: Bollards are shown on site plan drawings. See Amendment 0003 for additional bollard callouts for added clarity.

100. Section 05 50 13 paragraph 2.4 describes Corner Guards. No corner guards are shown on the drawings. Please confirm this paragraph shall be deleted.

ANSWER: This paragraph can be deleted. See Amendment 0004.

101. C504. Please provide specifications for Manual Retractable Bollards required by detail A2/C504.

ANSWER: See Specification Section 34 71 13.19.

102. C-514. Concrete strip for non-vehicle rated slide gate does not show thickness or reinforcement.

ANSWER: See Amendment 0003.

103. S-003/C-516. Trench drain details A3 & A4/C-516 and detail C3/S-003 have conflicting information. Please clarify.

ANSWER: Detail C3 on S-003 is removed. See Amendment 0004.

104. S-105. Entry control point Canopy is not showing site dimensions. Please clarify distances between structural columns, and concrete curb and 18” barrier curb, and asphalt edge.

ANSWER: See Drawing S-105 and S-502 in Amendment 0004.

105. Sec 03 31 90. Marine concrete is the only concrete specified on the project. Is the intent to all concrete structures will be Marine grade concrete? Or provide specification for concrete above grade.

ANSWER: Yes, all concrete structures are intended to be Marine grade concrete.

106. Sec 31 31 16.19. Specification calls for stainless steel mesh as a termite control. Since most structures and materials concrete and materials no consumed by termites, is the stainless-steel mesh required? If required. Provide details.

ANSWER: Provide Termite Control as specified. The Termite Control company installs the mesh at all vulnerable areas to their standards and does not require details.

107. CS-101. Is restoration of laydown/storage area to be considered part of 450-day duration for project.

ANSWER: Yes.

108. Detail B1/C502. Are Expansion joints required in barrier curb?

ANSWER: Yes. See Detail A1 on C-502 in Amendment 0004.

109. Structural Plans and Spec. 31.23.00.00 20 section 3.5. Structural Plans do not call out for probe and grout. Specification 31.23.00.00.20 section 3.5 Probing and Grouting mentions probe the magazine foundation? Is this specification section for this project?

ANSWER: Specification 31 23.00.00 20, paragraph 3.5 has been revised. See Amendment 0004.

110. CP-107. Provide detail for concrete paving at POV Canopy.

ANSWER: There is no concrete pavement at POV Search Canopy.