19R1310-AMD1.pdf
PDF 329 KB Posted
- Attached to
- FY19 MCON P-640, UNACCOMPANIED ENLISTED HOUSING, NAVAL BASE GUAM, JOINT REGION MARIANAS, GUAM
- Solicitation number
- N6274219R1310
About this file
19R1310-AMD1.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 19R1310-AMD5.pdf | ||
| 19R1310-AMD2.pdf | ||
| N6274219R1310_KingFisher.pdf | ||
| N6274219R1310_190206VingCard.pdf | ||
| RFPN6274219R1310.pdf | ||
| N6274219R1310_ONE-DAY_PASS.DOC | DOC document | |
| N6274219R1310_SECNAV_55121_CNIC_3-page_Access_Registration_Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
19RXXXX
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
RFP N62742-19-R-1310, WON #1582646, FY19 MCON P-640 UNACCOMPANIED ENLISTED HOUSING AT THE NAVAL BASE GUAM, JOINT
REGION MARIANAS
Amendment no. 0001 is continued on page 2.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Mar-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6274219R1310
X 9B. DATED (SEE ITEM 11)
20-Feb-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Mar-2019
CODE
NAVFAC PACIFIC
CONSTRUCTION CONTRACTS BR (CODE ACQ33)
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
N62742 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
RFP No. N62742-19-R-1310 Amendment No. 0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SOLICITATION, OFFER AND AWARD (SF1442)
Replace pages 1 and 2 with the attached pages 1 and 2.
DOCUMENT 00100 INSTRUCTIONS TO PROPOSERS
Replace page 4 with the attached page 4.
DOCUMENT 00202 EVALUATION FACTORS FOR AWARD
Replace page 4 with the attached page 4.
DOCUMENT 00700 NEGOTIATED CONTRACT CLAUSES
Replace pages 1 through 9 with the attached 1 through 9.
DOCUMENT 00800 SPECIAL CONTRACT REQUIREMENTS
Replace pages 1 and 2 with the attached 1 and 2.
DOCUMENT 00 01 15 LIST OF DRAWINGS
PARA 1.2 CONTRACT DRAWINGS
On NAVFAC Dwg No.17223247 (A-001) NOTES THIS SHEET. In note number 3, delete “WORK DURATION MUST BE NO MORE THAN 6 HOURS
FOR ANY GROUND DISTURBING WORK THAT INVOLVES MEC AND THE ESTABLISHMENT OF AN
EXCLUSION ZONE.” And replace with “NOT USED.”
SECTION 01 14 00 WORK RESTRICTIONS
PARA 1.3 SPECIAL SCHEDULING REQUIREMENTS
Add the following sub-paragraph:
"e. For any ground disturbing work that involves the establishment of an Exclusion Zone (EZ), work duration shall be no longer than a continuous 4-month period per Construction Phase."
PARA 1.4.2 Working Hours After this Paragraph add the following:
"1.4.2.1 Work Schedule for Intrusive Activities That Establishes an Exclusion Zone (EZ)
For any ground disturbing work that involves the establishment of an Exclusion Zone (EZ), the work schedule shall be restricted to the following hours:
a. Monday, Wednesday, Thursday, and Friday: 0830-1430 Hours
b. Tuesday: 0830-1330 Hours"
SECTION 01 57 19.03 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS Joint Region Marianas Explosive Safety Submission (JRM-ESS)
PARA 3.2 Work Schedule for Intrusive Activities After first sentence add following sentence:
"Refer to SECTION 01 14 00 WORK RESTRICTIONS for work schedule requirements."
19RXXXX
RFP N62742-19-R-1310, WON #1582646, FY19 MCON P-640 UNACCOMPANIED ENLISTED HOUSING AT THE NAVAL BASE GUAM, JOINT
REGION MARIANAS
GENERAL DESCRIPTION: SEE DOCUMENT 01 11 00, PARA 1.1.1
THIS PROCUREMENT IS UNRESTRICTED. North American Industry Classif ication System (NAICS) Code 236116—New Multi-Family Housing Construction—Average Annual Receipts for the Past 3 Years--$36.5M.
ESTIMATED COST: BETWEEN $25,000,000 AND $50,000,000
DPAS RATING: DOC2
ENFORCEABILITY OF PROPOSAL: The proposal must set forth full, accurate and complete information as required by this solicitation. The Government w ill rely on such information in the aw ard of a contract. The aw ardee’s proposal w ill be incorporated into the contract and all items proposed w ill become binding requirements of the contract. By submission of the offer, the offeror agrees that all items proposed (e.g.
teaming agreements, etc.) w ill be utilized for the duration of the contract and any substitutions must be equal or better and w ill require prior approval by the Contracting Officer.
ANN H. SAKI-ELI (808) 474-5356
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
20-Feb-2019
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________1170 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Document 00700
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______150 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
NAVFAC PACIFIC
CONSTRUCTION CONTRACTS BR (CODE ACQ33)
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
N62742
PAGE OF PAGES
1 OF
CODE N62742
(Title, identifying no., date):
12B. CALENDAR DAYS
(hour)
Sealed envelopes containing offers
HAND DELIVER
NAVFAC PACIFIC
CONSTRUCTION CONTRACTS BR (ACQ33)
4256 RADFORD DR, BLDG 62
HONOLULU HI 96818-3296
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
N6274219R1310 104
See Doc 00100
See Doc 00100
See Doc 00100
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
FY19 MCON P-640 UNACCOMPANIED ENLISTED HOUSING 1582646
NAVAL BASE GUAM
N62742-19-R-1310
DOCUMENT 00100
2. The management approach in terms of who will conduct, direct, supervise, control, and the controlling partner’s authority to obligate the entity.
3. The structure and decision-making responsibilities of the partners/parties in terms of who will control the manner and method of performance of work.
4. Identify (by name and title) the personnel having the authority to legally bind the Offeror (including authority to execute the contract documents and bonds).
5. Procedures in the event the entity is dissolved.
e. A list of subcontractors/partners/parties, to include company name, DUNS and CAGE Numbers, Address, Point of Contract, Email address, phone number and facsimile number.
f. The information submitted herein regarding Offeror’s team arrangement will not be considered in the technical evaluation unless separately provided pursuant to the technical evaluation factor submission requirements.
1.7 SUBCONTRACTING PLAN
a. As stated in Document 00202, paragraph 2.1, EVALUATION CRITERIA AND BASIS OF AWARD, this is a lowest priced technically acceptable source selection. Accordingly, small business subcontracting is not included as a technical evaluation factor. However, large business concerns must submit a Small Business Subcontracting Plan that addresses the following:
1. Identify in terms of dollar value and percentage of the total acquisition, the extent of work you will perform as the prime contractor. If submitting an offer as a Joint-Venture, identify the percentage of work each member will be responsible for and indicate the size status of each member, e.g., LB, SB, SDB, WOSB, HUBZone SB, etc.
2. In accordance with FAR 52.219-9, submit a Small Business Subcontracting Plan utilizing the template at the end of this section for this project. To demonstrate commitment in using small business concerns, the Small Business Subcontracting Plan may list all subcontractors by name. If the proposed Small Business Subcontracting goals do not meet the minimum NAVFAC Small Business Subcontracting Targets, include a detailed explanation describing the actions taken to arrive at that determination, along with an explanation for the goals that actually were proposed.
In accordance with FAR 52.219-9, Alternate II, “failure to submit and negotiate a subcontracting plan shall make the offeror ineligible for award of a contract.”
b. NAVFAC's command-wide small business subcontracting targets are shown below. These may be higher or lower than percentages that would represent realistic, challenging small business subcontracting goals for this acquisition. Offerors shall document in their subcontracting plans the basis for all proposed goals. Plans shall be submitted with initial offers.
SB 45%
SDB 5%
HUBZone SB 3%
WOSB 15%
SDVOSB 5%
c. See the Small Business Subcontracting Plan (Template) at the end of Document 00100 for format.
1.8 FAR 52.204-7, SYSTEM FOR AWARD MANAGEMENT (OCT 2018)
(a) Definitions. As used in this provision—
DOCUMENT 00202
FY19 P-640, Unaccompanied Enlisted Housing, 1582646 Naval Base Guam, JRM, Guam
3. The “Offeror” is defined as the exact name in Block 14 of the Solicitation, Offer and Award (SF1442). If the Offeror is utilizing experience and past performance information of any entity other than (1)the Offeror; (2) if the Offeror is a joint venture, its joint venture partners jointly and severally liable for the contract; or (3) a firm that has been acquired by the Offeror and is now part of the Offeror, the Offeror shall provide in its proposal a fully-executed teaming agreement or other contractual agreement. The teaming agreement or other contractual agreement shall, at a minimum, (1) be signed by the Offeror and the other entity, (2) specifically reference this solicitation/contract, and (3) specify the work to be performed by the other entity such that it is clear that the other entity will be meaningfully involved in this contract. For item (3), clearly state the specific commitments of resources of the other entity in terms of the work it will specifically perform or manage in the performance of the contract at the worksite. Note that generalized statements concerning commitment of resources are not sufficient to demonstrate that an entity will be meaningfully involved in the performance of the contract. Examples of “generalized statements” include a commitment of resources merely based on an entity’s “access” to resources and other generalized statements such as an entity will “provide support and expertise on the project.” The government will only consider information provided in the teaming agreement for the purpose of determining whether the Offeror has clearly demonstrated that any entity (other than the Offeror and, if the offeror is a joint venture, its joint venture partners jointly and severally liable for the contract) will have meaningful involvement in the performance of the contract. For experience and past performance information of a firm that has been acquired by the Offeror and is no longer a separate legal entity, the Offeror shall provide an explanation of the acquisition sufficient to demonstrate that the predecessor firm is now part of the Offeror in Block 1 of Attachment A.
(b) Basis of Evaluation:
The basis of evaluation and acceptability will include the Offeror’s demonstrated experience in executing at least one
(1) relevant construction project as defined in the solicitation submittal requirements and paragraph 2.4 below.
Factor 2 – PAST PERFORMANCE
(a) Solicitation Submittal Requirements:
If a completed Contractor Performance Assessment Report System (CPARS) or Construction Contractor Appraisal Support System (CCASS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 1 for Experience. If there is not a completed CPARS or CCASS evaluation, then submit Past Performance Questionnaires (PPQ - Attachment B) for each project included in Factor 1. If CPARS or CCASS exist, they will be considered in the evaluation of past performance over PPQs. PPQs will not be accepted from the designer on a design-build project or from a prime contractor for work performed by a subcontractor. PPQs shall be completed and signed by the contracting agent and/or their representative responsible for construction contract administration. The offeror shall provide completed PPQs in the proposal. Offeror’s may submit PPQs previously submitted for other solicitations as long as complete, required information is included.
Offerors may provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 1. Offerors may also address any adverse past performance issues. Explanations shall not exceed two (2) double-sided pages (or four (4) single-sided pages) in total.
NOTES:
1. The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the Offeror’s references or the references unwillingness to provide the information requested may affect the Government’s evaluation of this factor. In addition, the Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources including sources outside of the Government. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS) using
DOCUMENT 00700 (ADVERTISE)
DOCUMENT 00700
NEGOTIATED
CONTRACT CLAUSES12/18
1.1 FAR 52.252-2, CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: https://www.acquisition.gov/
1.2 FAR 52.202-1, DEFINITIONS (NOV 2013)
1.3 FAR 52.203-3, GRATUITIES (APR 1984)
1.4 FAR 52.203-5, COVENANT AGAINST CONTINGENT FEES (MAY 2014)
1.5 FAR 52.203-6, RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)
1.6 FAR 52.203-7, ANTI-KICKBACK PROCEDURES (MAY 2014)
1.7 FAR 52.203-8, CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR
IMPROPER ACTIVITY (MAY 2014)
1.8 FAR 52.203-10, PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY
2014)
1.9 FAR 52.203-12, LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL
TRANSACTIONS (OCT 2010)
1.10 FAR 52.203-13, CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (OCT 2015)
1.11 FAR 52.203-16, PREVENTING PERSONAL CONFLICTS OF INTEREST (DEC 2011) (DEVIATION
2018-O0018)
1.12 FAR 52.203-17, CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO
INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (APR 2014)
1.13 FAR 52.203-19, PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS (JAN 2017)
1.14 FAR 52.204-2, SECURITY REQUIREMENTS (AUG 1996) ALTERNATE II (APR 1984)
1.15 FAR 52.204-4, PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT
PAPER (MAY 2011)
1.16 FAR 52.204-9, PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)
1.17 FAR 52.204-10, REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT
AWARDS (OCT 2018)
1.18 FAR 52.204-13, SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
1.19 FAR 52.204-14, SERVICE CONTRACT REPORTING REQUIREMENTS (OCT 2016)
1.20 FAR 52.204-18, COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL 2016)
(a) Definition. As used in this clause–
“Commercial and Government Entity (CAGE) code” means–
(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity;
or
(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.
DOCUMENT 00700 (ADVERTISE)
(b) Contractors shall ensure that the CAGE code is maintained throughout the life of the contract. For contractors registered in the System for Award Management (SAM), the DLA Commercial and Government Entity (CAGE) Branch shall only modify data received from SAM in the CAGE master file if the contractor initiates those changes via update of its SAM registration. Contractors undergoing a novation or change-of-name agreement shall notify the contracting officer in accordance with subpart 42.12. The contractor shall communicate any change to the CAGE code to the contracting officer within 30 days after the change, so that a modification can be issued to update the CAGE code on the contract.
(c) Contractors located in the United States or its outlying areas that are not registered in SAM shall submit written change requests to the DLA Commercial and Government Entity (CAGE) Branch. Requests for changes shall be provided at https://cage.dla.mil. Change requests to the CAGE master file are accepted from the entity identified by the code.
(d) Contractors located outside the United States and its outlying areas that are not registered in SAM shall contact the appropriate National Codification Bureau (points of contact available at http://www.nato.int/structur/AC/135/main/links/contacts.htm) or NSPA at https://eportal.nspa.nato.int/AC135Public/scage/CageList.aspx to request CAGE changes.
(e) Additional guidance for maintaining CAGE codes is available at https://cage.dla.mil.
1.21 FAR 52.204-19, INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS (DEC 2014)
The Contractor’s representations and certification, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.
1.22 FAR 52.204-21, BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS
(JUN 2016)
(a) Definitions. As used in this clause–
“Covered contractor information system” means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.
“Federal contract information” means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public websites) or simple transactional information, such as necessary to process payments.
“Information” means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).
“Information system” means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).
“Safeguarding” means measures or controls that are prescribed to protect information systems.
(b) Safeguarding requirements and procedures.
DOCUMENT 00700 (ADVERTISE)
(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:
(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).
(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.
(iii) Verify and control/limit connections to and use of external information systems.
(iv) Control information posted or processed on publicly accessible information systems.
(v) Identify information system users, processes acting on behalf of users, or devices.
(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.
(vii) Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.
(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.
(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.
(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.
(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.
(xii) Identify, report, and correct information and information system flaws in a timely manner.
(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.
(xiv) Update malicious code protection mechanisms when new releases are available.
(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.
(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal agencies and departments relating to covered contractor information systems generally or other Federal safeguarding requirements for controlled unclassified information (CUI) as established by Executive Order 13556.
(c) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial items, other than commercially available off-the-shelf items), in which the subcontractor may have Federal contract information residing in or transiting through its information system.
DOCUMENT 00700 (ADVERTISE)
1.23 FAR 52.209-6, PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (OCT 2015)
1.24 FAR 52.209-9, UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING
RESPONSIBILITY MATTERS (OCT 2018)
1.25 FAR 52.209-10, PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC
CORPORATIONS (NOV 2015)
1.26 FAR 52.211-10, COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to
(a) Commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed*,
(b) Prosecute the work diligently, and
(c) Complete the entire work ready for use not later than 1170 calendar days after notice to proceed. (See also Document 00800 for Phased Construction).
The time stated for completion shall include final cleanup of the premises.
*A "Notice to Proceed" is deemed to be given by the Government to the Contractor 30 calendar days after the contract award date. No formal written notice will be issued by the Government. Within 30 calendar days following the contract award date, the Contractor is obligated to submit performance and payment bonds in a form acceptable to the Government. The Government shall notify the Contractor of the acceptability of the performance and payment bonds within 5 working days of receipt of these documents. If these documents are not submitted in their proper form acceptable to the Government within 30 calendar days of contract award, any delays resulting thereby will be at the sole expense of the Contractor. The contract completion date will not be extended due to the Government's review of the acceptability of the Contractor's bonds, except where the Government's review of said documents extends beyond 5 working days.
1.27 FAR 52.211-12, LIQUIDATED DAMAGES—CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government for each calendar day of delay until the work is completed or accepted as follows:
Building 5: $3,234/day Building 6: $3,381/day Building 18: $3,234/day Building 20: $3,234/day
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
1.28 FAR 52.211-13, TIME EXTENSIONS (SEP 2000)
1.29 FAR 52.211-15, DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)
1.30 FAR 52.215-2, AUDIT AND RECORDS--NEGOTIATION (OCT 2010)
1.31 FAR 52.215-11, PRICE REDUCTION FOR DEFECTIVE COST OR PRICING DATA--
MODIFICATIONS (AUG 2011)
1.32 FAR 52.215-13, SUBCONTRACTOR CERTIFIED COST OR PRICING DATA--MODIFICATIONS
(OCT 2010)
1.33 FAR 52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS (OCT 2010)
DOCUMENT 00700 (ADVERTISE)
1.34 FAR 52.215-18, REVERSION OR ADJUSTMENT OF PLANS FOR POSTRETIREMENT BENEFITS
(PRB) OTHER THAN PENSIONS (JUL 2005)
1.35 FAR 52.215-19, NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)
1.36 FAR 52.215-21, REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER
THAN CERTIFIED COST OR PRICING DATA—MODIFICATIONS (OCT 2010)
1.37 FAR 52.219-8, UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2018)
1.38 FAR 52.219-9, SMALL BUSINESS SUBCONTRACTING PLAN (AUG 2018) ALTERNATE II (NOV
2016)
1.39 FAR 52.219-16, LIQUIDATED DAMAGES - SUBCONTRACTING PLAN (JAN 1999)
1.40 FAR 52.219-28, POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013)
1.41 FAR 52.222-1, NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)
1.42 FAR 52.222-3, CONVICT LABOR (JUN 2003)
1.43 FAR 52.222-4, CONTRACT WORK HOURS AND SAFETY STANDARDS--OVERTIME
COMPENSATION (MAY 2018)
1.44 FAR 52.222-11, SUBCONTRACTS (LABOR STANDARDS) (MAY 2014)
1.45 FAR 52.222-12, CONTRACT TERMINATION -- DEBARMENT (MAY 2014)
1.46 FAR 52.222-21, PROHIBITION OF SEGREGATED FACILITIES (APR 2015)
1.47 FAR 52.222-26, EQUAL OPPORTUNITY (SEP 2016)
1.48 FAR 52.222-27, AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION
(APR 2015)
1.49 FAR 52.222-35, EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)
1.50 FAR 52.222-36, EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014)
1.51 FAR 52.222-37, EMPLOYMENT REPORTS ON VETERANS (FEB 2016)
1.52 FAR 52.222-40, NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR
RELATIONS ACT (DEC 2010)
1.53 FAR 52.222-50, COMBATING TRAFFICKING IN PERSON (MAR 2015)
1.54 FAR 52.222-54, EMPLOYMENT ELIGIBILITY VERIFICATION (OCT 2015)
1.55 FAR 52.223-2, AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND
CONSTRUCTION CONTRACTS (SEP 2013)
1.56 FAR 52.223-3, HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (JAN
1997)
1.57 FAR 52.223-5, POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011)
1.58 FAR 52.223-6, DRUG-FREE WORKPLACE (MAY 2001)
1.59 FAR 52.223-9, ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-
DESIGNATED ITEMS (MAY 2008)
1.60 FAR 52.223-15, ENERGY EFFICIENCY IN ENERGY-CONSUMING PRODUCTS (DEC 2007)
1.61 FAR 52.223-17, AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE AND
CONSTRUCTION CONTRACTS (AUG 2018)
1.62 FAR 52.223-18, ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE
DRIVING (AUG 2011)
1.63 FAR 52.223-21, FOAMS (JUN 2016)
1.64 FAR 52.224-1, PRIVACY ACT NOTIFICATION (APR 1984)
1.65 FAR 52.224-2, PRIVACY ACT (APR 1984)
1.66 FAR 52.225-11, BUY AMERICAN --CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS
(OCT 2016)
1.67 FAR 52.225-13, RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)
1.68 FAR 52.227-1, AUTHORIZATION AND CONSENT (DEC 2007)
1.69 FAR 52.227-2, NOTICES AND ASSISTANCE REGARDING PATENT & COPYRIGHT
INFRINGEMENT (DEC 2007)
1.70 FAR 52.227-4, PATENT INDEMNITY -- CONSTRUCTION CONTRACTS (DEC 2007)
1.71 FAR 52.228-1, BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
DOCUMENT 00700 (ADVERTISE)
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds,
(1) to unsuccessful bidders as soon as practicable after the opening of bids, and
(2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 30 days after award of the contract, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
1.72 FAR 52.228-2, ADDITIONAL BOND SECURITY (OCT 1997)
1.73 FAR 52.228-5, INSURANCE--WORK ON A GOVERNMENT INSTALLATION (JAN 1997)
1.74 FAR 52.228-11, PLEDGES OF ASSETS (AUG 2018)
1.75 FAR 52.228-12, PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS (MAY 2014)
1.76 FAR 52.228-14, IRREVOCABLE LETTER OF CREDIT (NOV 2014)
1.77 FAR 52.228-15, PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (OCT 2010)
1.78 FAR 52.229-3, FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)
1.79 FAR 52.232-5, PAYMENTS UNDER FIXED - PRICE CONSTRUCTION CONTRACTS (MAY 2014)
1.80 FAR 52.232-17, INTEREST (MAY 2014)
1.81 FAR 52.232-23, ASSIGNMENT OF CLAIMS (MAY 2014)
1.82 FAR 52.232-27, PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2017)
1.83 FAR 52.232-33, PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR AWARD
MANAGEMENT (OCT 2018)
1.84 FAR 52.232-39, UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)
1.85 FAR 52.232-40, PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS
SUBCONTRACTORS (DEC 2013)
1.86 FAR 52.233-1, DISPUTES (MAY 2014) ALTERNATE I (DEC 1991)
1.87 FAR 52.233-3, PROTEST AFTER AWARD (AUG 1996)
1.88 FAR 52.233-4, APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
1.89 FAR 52.236-1, PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)
The Contractor shall perform on the site, and with its own organization, work equivalent to at least twenty (20) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.
1.90 FAR 52.236-2, DIFFERING SITE CONDITIONS (APR 1984)
1.91 FAR 52.236-3, SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)
1.92 FAR 52.236-4, PHYSICAL DATA (APR 1984) *
Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
DOCUMENT 00700 (ADVERTISE)
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by geotechnical investigation by borings and test pits by GoeEngineering & Testing. Hazardous material investigation by sample tanking and testing.
(b) Weather condition. N/A.
(c) Transportation facilities. N/A.
(d) Other pertinent information. N/A.
1.93 FAR 52.236-5, MATERIAL AND WORKMANSHIP (APR 1984)
1.94 FAR 52.236-6, SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)
1.95 FAR 52.236-7, PERMITS AND RESPONSIBILITIES (NOV 1991)
1.96 FAR 52.236-8, OTHER CONTRACTS (APR 1984)
1.97 FAR 52.236-9, PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS (APR 1984)
1.98 FAR 52.236-10, OPERATIONS AND STORAGE AREAS (APR 1984)
1.99 FAR 52.236-11, USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)
1.100 FAR 52.236-12, CLEANING UP (APR 1984)
1.101 FAR 52.236-13, ACCIDENT PREVENTION (NOV 1991) ALTERNATE I (NOV 1991)
1.102 FAR 52.236-15, SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)
1.103 FAR 52.236-17, LAYOUT OF WORK (APR 1984)
1.104 FAR 52.236-21, SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)
ALTERNATE I (APR 1984)
1.105 FAR 52.236-26, PRECONSTRUCTION CONFERENCE (FEB 1995)
1.106 FAR 52.242-5, PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (JAN 2017)
1.107 FAR 52.242-13, BANKRUPTCY (JUL 1995)
1.108 FAR 52.242-14, SUSPENSION OF WORK (APR 1984)
1.109 FAR 52.243-4, CHANGES (JUN 2007)
1.110 FAR 52.243-6, CHANGE ORDER ACCOUNTING (APR 1984)
1.111 FAR 52.244-6, SUBCONTRACTS FOR COMMERCIAL ITEMS (OCT 2018)
1.112 FAR 52.246-12, INSPECTION OF CONSTRUCTION (AUG 1996)
1.113 FAR 52.246-21, WARRANTY OF CONSTRUCTION (MAR 1994) ALTERNATE I (APR 1984)
1.114 FAR 52.248-3, VALUE ENGINEERING -- CONSTRUCTION (OCT 2015)
1.115 FAR 52.249-2, TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED - PRICE)
(APR 2012) ALTERNATE I (SEP 1996)
1.116 FAR 52.249-10, DEFAULT (FIXED - PRICE CONSTRUCTION) (APR 1984)
1.117 FAR 52.251-1, GOVERNMENT SUPPLY SOURCES (APR 2012)
1.118 FAR 52.252-4, ALTERATIONS IN CONTRACT (APR 1984)
Portions of this contract are altered as follows:
FAR 52.211-10, Commencement, Prosecution, and Completion of Work (APR 1984): Supplemental clarification of “notice to proceed”.
1.119 FAR 52.253-1, COMPUTER GENERATED FORMS (JAN 1991)
1.120 DFARS 252.203-7000, REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD
OFFICIALS (SEP 2011)
1.121 DFARS 252.203-7001, PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER
DEFENSE-CONTRACT-RELATED FELONIES (DEC 2008)
1.122 DFARS 252.203-7002, REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (SEP
2013)
1.123 DFARS 252.203-7003, AGENCY OFFICE OF THE INSPECTOR GENERAL (DEC 2012)
1.124 DFARS 252.203-7004, DISPLAY OF FRAUD HOTLINE POSTER(S) (OCT 2016)
1.125 DFARS 252.204-7000, DISCLOSURE OF INFORMATION (OCT 2016)
DOCUMENT 00700 (ADVERTISE)
1.126 DFARS 252.204-7003, CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)
1.127 DFARS 252.204-7004, LEVEL I ANTITERRORISM AWARENESS TRAINING FOR CONTRACTORS
(FEB 2019)
1.128 DFARS 252.204-7005, ORAL ATTESTATION OF SECURITY RESPONSIBILITIES (NOV 2001)
1.129 DFARS 252-204-7009, LIMITATIONS ON THE USE OR DISCLOSURE OF THIRD-PARTY
CONTRACTOR REPORTED CYBER INCIDENT INFORMATION (OCT 2016)
1.130 DFARS 252.204-7012, SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER
INCIDENT REPORTING (OCT 2016)
1.131 DFARS 252.204-7015, NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR
LITIGATION SUPPORT (MAY 2016)
1.132 DFARS 252.205-7000, PROVISIONS OF INFORMATION TO COOPERATIVE AGREEMENT
HOLDERS (DEC 1991)
1.133 DFARS 252.209-7004, SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED
BY THE GOVERNMENT OF A COUNTRY THAT IS STATE SPONSOR OF TERRORISM (OCT 2015)
1.134 DFARS 252.211-7003, ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)
1.135 DFARS 252.219-7003, SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS) (DEC
2018)
1.136 DFARS 252.222-7000, RESTRICTIONS ON EMPLOYMENT OF PERSONNEL (MAR 2000) [See
DFARS 222.70 for applicability.]
1.137 DFARS 252.222-7006, RESTRICTIONS ON THE USE OF MANDATORY ARBITRATION
AGREEMENTS (DEC 2010)
1.138 DFARS 252.223-7001, HAZARD WARNING LABELS (DEC 1991)
1.139 DFARS 252.223-7004, DRUG-FREE WORK FORCE (SEP 1988)
1.140 DFARS 252.223-7006, PROHIBITION ON STORAGE, TREATMENT AND DISPOSAL OF TOXIC OR
HAZARDOUS MATERIALS – BASIC (SEP 2014)
1.141 DFARS 252.223-7008, PROHIBITION OF HEXAVALENT CHROMIUM (JUN 2013)
1.142 DFARS 252.225-7012, PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (DEC 2017)
1.143 DFARS 252.225-7048, EXPORT-CONTROLLED ITEMS (JUN 2013)
1.144 DFARS 252.227-7033, RIGHTS IN SHOP DRAWINGS (APR 1966)
1.145 DFARS 252.231-7000, SUPPLEMENTAL COST PRINCIPLES (DEC 1991)
1.146 DFARS 252.232-7003, ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING
REPORTS (DEC 2018)
1.147 DFARS 252.232-7006, WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
1.148 DFARS 252.232-7010, LEVIES ON CONTRACT PAYMENTS (DEC 2006)
1.149 DFARS 252.236-7000, MODIFICATION PROPOSALS -- PRICE BREAKDOWN (DEC 1991)
1.150 DFARS 252.236-7001, CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
1.151 DFARS 252.236-7013, REQUIREMENT FOR COMPETITION OPPORTUNITY FOR AMERICAN
STEEL PRODUCERS, FABRICATORS, AND MANUFACTURERS (JUN 2013)
1.152 DFARS 252.243-7001, PRICING OF CONTRACT MODIFICATIONS (DEC 1991)
1.153 DFARS 252.243-7002, REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2012)
1.154 DFARS 252.244-7000, SUBCONTRACTS FOR COMMERCIAL ITEMS (JUN 2013)
1.155 DFARS 252.246-7004, SAFETY OF FACILITIES, INFRASTRUCTURE, AND EQUIPMENT FOR
MILITARY OPERATIONS (OCT 2010)
1.156 DFARS 252.247-7023, TRANSPORTATION OF SUPPLIES BY SEA – BASIC (FEB 2019)
1.157 DFARS 252.251-7000, ORDERING FROM GOVERNMENT SUPPLY SOURCES (AUG 2012)
1.158 NFAS 5252.209-9300, ORGANIZATIONAL CONFLICTS OF INTEREST (JUN 1994)
The restrictions described herein shall apply to the Contractor and its affiliates, consultants and subcontracts under this contract. If the Contractor under this contract prepares or assists in preparing a statement of work, specifications and plans, the Contractor and its affiliates shall be ineligible to bid or participate, in any capacity, in any contractual effort which is based on such statement of work or specifications and plans as a prime contractor, subcontractor, consultant or in any similar capacity.
DOCUMENT 00700 (ADVERTISE)
The Contractor shall not incorporate its products or services in such statement of work or specification unless so directed in writing by the Contracting Officer, in which case the restriction shall not apply. This contract shall include this clause in its subcontractor's or consultants' agreements concerning the performance of this contract.
--End of Document--
DOCUMENT 00800
DOCUMENT 00800
SPECIAL CONTRACT REQUIREMENTS
12/18
1.1 NOTICE CONCERNING LABOR RATES FOR WORK IN GUAM NOT RELATED TO THE
REALIGNMENT OF MILITARY INSTALLATIONS AND THE RELOCATION OF MILITARY
PERSONNEL TO GUAM
a. The Construction Wage Requirements Statue (formerly known as the Davis-Bacon Act) will not apply to this project. However, the Contract Work Hours and Safety Standards Act will apply; therefore, the following FAR clauses shall be modified to reflect this applicability included in this contract.
1. FAR 52.222-11, Subcontracts (Labor Standards), except that the list of applicable clauses in paragraph b shall be modified to refer only to the clauses: Contract Work Hours and Safety Standards Act- Overtime Compensation, Subcontracts (Labor Standards), and Contract Termination-Debarment, Disputes Concerning Labor Standards.
2. FAR 52.222-12, Contract Termination-Debarment, except that the list of applicable clauses in the first sentence shall be modified to refer only to the Contract Work Hours and Safety Standards Act- Overtime Compensation, Subcontracts (Labor Standards).
b. Offerors maintain the responsibility to comply with the Government of Guam's Labor Certification process and current prevailing wage rates, as applicable. The notice for prevailing wage rates for construction is attached and provided for information only. Additional information may be obtained from the Department of Labor, Wage and Hour Division, P.O. Box 9970, Tamuning, GU 96931-9970, telephone (671) 475-7050/51/24.
1.2 AUTHORITY
a. No person other than the Contracting Officer has authority to bind the Government with respect to this contract.
b. No action or omission of any government employee or representative other than the Contracting Officer shall increase or decrease the scope of this contract or shall otherwise modify the terms and conditions of this contract.
c. In no event shall any of the following be effective or binding on the Government or imputed to the Contracting Officer with respect to this contract:
(a) An understanding or agreement between the Contractor and anyone other than the Contracting Officer;
(b) A purported modification or change order issued by anyone other than the Contracting Officer;
(c) A promise by anyone other than the Contracting Officer to provide additional funding or make payments; or
(d) An order, direction, consent, or permission from anyone other than the Contracting Officer to:
(i) Incur costs in excess of a specified estimated cost, allotment of funds, or other ceiling; or
(ii) Expend hours in excess of a specified level of effort.
DOCUMENT 00800
1.3 PHASED CONSTRUCTION SCHEDULE
Within the overall project schedule, commence and complete the work in phases. Complete each phase of the work within the number of calendar days stated in the following schedule:
a. Schedule start day: The day designated as the beginning of a particular phase; the number listed is the number of calendar days from the notice-to-proceed.
b. Completion day: The day designated as the end of a given phase and the day the work in that phase must be completed; the number listed is the number of calendar days from the notice-to-proceed.
c. Schedule:
PHASE DESCRIPTION SCHEDULE START
DAY
SCHEDULE
COMPLETION DAY
1 All work associated with Buildings 18 (if awarded) and 20
15 calendar days after
NTP
630 days after NTP
2 All work associated with Buildings 5 and 6 631 calendar days 1,170 calendar days
d. If the work of a particular phase is complete and accepted before the scheduled completion day, immediately begin work on the subsequent phase unless otherwise restricted.
1.4 NOTICE OF BONDING REQUIREMENTS
Within 30 days after receipt of award, the offeror to whom the award is made shall furnish the bonds required by FAR Clause 52.228-15 Performance and Payment Bonds--Construction.
Offerors are hereby notified that the contract time for purposes of fixing the completion date, default, and liquidated damages will be as stated in FAR Clause 52.211-10 Commencement, Prosecution, and Completion of Work, regardless of when performance and payment bonds or deposits in lieu of surety are executed.
1.5 UTILITIES FOR CONSTRUCTION AND TESTING (JUN 1994)
The Contractor shall be responsible for obtaining, either from available Government sources or local utility companies, all utilities required for construction and testing. The Contractor shall provide these utilities at his expense, paid for at the current utility rate delivered to the job site. The Contractor shall provide and maintain all temporary utility connections and distribution lines, and all meters required to measure the amount of each utility used.
-- End of Document --
| N62742-19-R-1310-Amd 0001 |
| SF1442 pgs 1 & 2 |
| Document 00100, pg 4 |
| Document 00202, pg 4 |
| Document 00700, Clauses pgs 1 - 9 |
| Document 00800, Special Contract Requirements, pgs 1 & 2 |
File details come from the government source that posted it.