18R1306_Amend0003_Issued.pdf
PDF 27 KB Posted
- Solicitation number
- N6274218R1306
About this file
18R1306_Amend0003_Issued.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 18R1306_Amend0009_Issued.pdf | ||
| 18R1306_Amend0008_Issued.pdf | ||
| 18R1306_Amend0007.pdf | ||
| 18R1306_Amend0006_Issued.pdf | ||
| 181306_Amend0005_Issued.pdf | ||
| 18R1306_Amend0004_Issued.pdf | ||
| 18R1306_Amend2_Issued.pdf | ||
| 18R1306_Amend1_Issued.pdf | ||
| 18R1306_Issued.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
RFP N62742-18-R-1306, WON# 1366475, FY15 MILCON COMBINED COMMUNICATIONS GATEWAY GERALDTON AT THE AUSTRALIAN DEFENCE
SATELLITE COMMUNICATIONS STATION, KOJARENA, WA
Amendment No. 0003 is continued on page 2.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6274218R1306
X 9B. DATED (SEE ITEM 11)
28-Nov-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Jan-2018
CODE
NAVFAC PACIFIC
A-E/CONSTR CONTRACTS BRANCH (CODE ACQ31)
258 MAKALAPA DR STE 100
JBPHH HI 96860-3134
N62742 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6274218R1306 Amendment No. 0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
DOCUMENT 00202 EVALUATION FACTORS FOR AWARD
Remove page 2 of 6 in its entirety and replace with the attached revised page 2 of 6 of this Amendment No. 0003.
(End of Summary of Changes)
FY15 MILCON, COMBINED COMMUNICATIONS WON# 1366475
GATEWAY GERALDTON (DOD TELEPORT
GERALDTON), KOJARENA WA
Amendment No. 0003
RFP N62742-18-R-1306
Document 00202
2.3 TECHNICAL EVALUATION FACTORS
The following evaluation factors shall be used to evaluate the technical proposals.
Factor 1: Experience Factor 2: Past Performance Factor 3: Safety
Factor 1 – Experience:
a. Solicitation Submittal Requirements:
Submit a maximum of two (2) construction projects for each of the three major construction activities defined below as a relevant construction project. More than one of the major construction activities may be demonstrated in a single project scope, provided all relevancy criteria for each major construction activity is demonstrated; however, the Government will only review two projects for each of the three major construction activities. For all relevant construction projects, the Offeror shall complete the attached Construction Experience Project Data Sheet (Attachment A) and complete all individual blocks. Attachment A and all information therein is MANDATORY and SHALL be used to evaluate relevant construction experience. The Government will evaluate only the information provided in Attachment A. Information provided on other than Attachment A will not be considered.
The Offeror may expand individual blocks on the Attachment A; however, Attachment A for each project submitted shall not exceed a total of four (4) pages, single-sided, 8.5” x 11” (210 x 297 mm), 1” (2.54 cm) margin left/right/top/bottom, and 10-point font or larger [or, two (2) double-sided pages]. Information exceeding the four single-sided pages [or two (2) double-sided pages] will not be evaluated. For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP.
RELEVANT CONSTRUCTION PROJECT: A relevant construction project is defined as a project that includes at least one of the following major construction activities:
1. Construction of a minimum 300 SM facility to include interior power, lighting, and telecommunications systems.
2. Construction of a minimum 400,000 liter water storage tank.
3. $2M or more in construction of medium-voltage (4.160kV to 69kV) electrical systems, which included underground distribution lines and connections, electrical transformers or substations, and switchgear.
Relevant projects shall have been completed or substantially completed within the past ten (10) years from the date of issuance of this RFP. "Substantially Complete" is defined as at least 90% physically complete.
A relevant construction project is further defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.
For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e.: unique features, area, construction methods).
If the Offeror is utilizing experience and past performance information of any entity other than the Offeror the Offeror shall clearly demonstrate in Block 10 of Attachment A that such entity will have meaningful involvement in the performance of the contract in order for the experience and past performance information of such entity to be considered. Additionally, if the project was performed by a Joint Venture (JV) or Limited Liability Company (LLC) (or Australian equivalent), the Offeror shall demonstrate that the JV partner/LLC member’s role, as described in Block 9 of Attachment A, for the project submitted, was meaningful and relevant to its proposed role under this
File details come from the government source that posted it.