18R1305_Amd01.pdf
PDF 142 KB Posted
- Solicitation number
- N6274218R1305
About this file
This amendment modifies a solicitation for a multiple award construction contract to support military construction projects in Guam and other areas under the U.S. Naval Facilities Engineering Command Pacific. The modification clarifies evaluation criteria for experience in concrete building structures and safety documentation requirements. Offerors are invited to submit proposals for indefinite delivery, indefinite quantity construction contracts with a maximum value of $990 million over a potential five-year period. Task orders will range from $15-150 million and support facilities such as barracks, administrative buildings, communications infrastructure, hospitals, dining halls, warehouses, ranges, and aviation facilities. Proposals will be evaluated in two phases, with the five most highly qualified offerors invited to submit detailed phase two responses. Evaluation criteria emphasize technical approach, experience, past performance, safety, small business utilization, and construction/design qualifications. The base period of awarded contracts is one year with four optional one-year extensions.
18R1305_Amd01.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6274218R1305_Amd02.pdf | ||
| N6274218R1305_PH1_RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
18RXXXX
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
RFP N62742-18-R-1305, MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR U.S. MILITARY CONSTRUCTION PROJECTS IN GUAM
AND OTHER AREAS UNDER THE COGNIZANCE OF NAVFAC PACIFIC
Amendment No. 0001 is continued on page 2.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Aug-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6274218R1305
X 9B. DATED (SEE ITEM 11)
16-Jul-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Aug-2018
CODE
NAVFAC PACIFIC
A-E/CONSTR CONTRACTS BRANCH (CODE ACQ31)
258 MAKALAPA DR STE 100
JBPHH HI 96860-3134
N62742 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6274218R1305
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following items are applicable to this modification:
DOCUMENT 00202 EVALUATION FACTORS FOR AWARD
-At 2.2 NON-PRICE EVALUATION FACTORS, Factor 2 –Experience, (1) Construction Experience, NOTES, add the following note:
“8. For the four types of relevant construction projects, “concrete building structure” shall be limited to cast-in-place or precast concrete roof and exterior wall construction. Reinforced masonry construction shall not be considered “concrete building structure”.”
-At 2.2 NON-PRICE EVALUATION FACTORS, Factor 2 –Experience, (2) Design Experience, NOTES, add the following note:
“6. For the four types of relevant design projects, “concrete building structure” shall be limited to cast-in-place or precast concrete roof and exterior wall construction. Reinforced masonry construction shall not be considered “concrete building structure”.”
-At 2.2 NON-PRICE EVALUATION FACTORS, Factor 4 – Safety, Paragraph (a) Solicitation Submittal Requirements (2), delete the first sentence:
“OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate and Total Recordable Case (TRC) Rate: Submit the OSHA DART and TRC rates and supporting OSHA 300 log for the three previous complete calendar years (2017, 2016, 2015).”
and replace with the following:
“OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate and Total Recordable Case (TRC) Rate: Submit the OSHA DART and TRC rates and supporting OSHA 300 and OSHA 300A logs for the three previous complete calendar years (2017, 2016, 2015).”
(End of Summary of Changes)
File details come from the government source that posted it. Updated .