ATTACHMENT_J_2_Contractor_Price_Breakdown_N6264926RK010.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
USNS CHARLES DREW (T-AKE 10) VRA KR
Solicitation number
N6264926RK010
Issued by

About this file

This is a Contractor Price Breakdown template for Voyage Repair Availability (VRA) services on the USNS CHARLES DREW (T-AKE 10) naval vessel scheduled for July 19, 2026 in South Korea. The spreadsheet is structured to capture pricing for multiple work items categorized under Category A, with separate columns for prime contractor and subcontractor labor hours, labor pricing, material pricing, and other costs. The template includes 17 distinct work items spanning mechanical, electrical, structural, and operational repairs—including handrail replacement, topside painting, pump motor refurbishment, ECDIS and radar repairs, cargo crane cab repair, seawater pump overhaul, piping repairs, lagging renewal, stateroom head renewal, and ventilation/louver replacement. The pricing template accommodates a prime labor rate mechanism (currently listed at $0.00) and requires cost breakdowns for both labor hours and material costs denominated in US dollars on a cost-and-freight-material (CFM) basis. All line items currently reflect zero pricing, indicating this is a blank template awaiting contractor cost submissions. The work is governed by Work Specification MSCOK 26-011 and must be performed in South Korea by sources authorized under DFARS 252.225-7042. The procuring agency is the Department of the Navy Naval Supply Systems Command.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

USNS CHARLES DREW VRA KR
6 - 19 JUL 2026PRIME CONTRACTORSUBCONTRACTORPrime Labor Rate :$0.00
Work Item No.TitleLabor hrs.Labor

Price US$ Material Price

(CFM)

US$ Labor hrs. Labor Price US$ Material Price

(CFM)

US$ Other (specify in Remarks)

US$Total Price
US$CAT
1TAKE-SWI-Scope General Requirements and DefinitionsNSPNSPNSPNSPNSPNSPNSPNSPNSP
2TAKE-SWI-Technical and Manufacturers RepresentativeNSPNSPNSPNSPNSPNSPNSPNSPNSP
3Utilities and General Services for Ship and Port Engineer0$0$00$0$0$0$0A
4TAKE-SWI-Testing and Quality AssuranceNSPNSPNSPNSPNSPNSPNSPNSPNSP
20TAKE-SWI-Gas Free Certificates0$0$00$0$0$0$0A
102Handrail Replacement0$0$00$0$0$0$0A
173Point and Paint 2K SQFT Topside0$0$00$0$0$0$0A
301Refurbish High Temp Chill Water Pump Motors0$0$00$0$0$0$0A
302Refurbish Fan Motors0$0$00$0$0$0$0A
449ECDIS and S-Band Repair0$0$00$0$0$0$0A
503Cargo Crane No.1 Cab Repair0$0$00$0$0$0$0A
512TAKE-CSI-Magazine Sprinkler Gauge Calibration (1YR)0$0$00$0$0$0$0A
515No.2 Central Seawater Pump Overhaul0$0$00$0$0$0$0A
525Eductor Reach Rod Repair0$0$00$0$0$0$0A
557Misc. Piping0$0$00$0$0$0$0A
574Lagging Renewal0$0$00$0$0$0$0A
601Stateroom Head Renewal0$0$00$0$0$0$0A
802Vent and Louver Replacement0$0$00$0$0$0$0A
803AC Coil Repairs0$0$00$0$0$0$0A

TOTAL CAT A 0 $0.00 $0.00 0 $0.00 $0.00 $0.00 $0.00

Remarks: (provide the information in space below. Use separate sheet of paper if necessary.)