0301_A_M10 AMR Supply Fan Overhaul and Motor Rewind.docx
DOCX document 26 KB Posted
- Attached to
- USNS CHARLES DREW (T-AKE 10) VRA KR
- Solicitation number
- N6264926RK010
About this file
This is a Statement of Work for a specific work item (Item 0301) in a Voyage Repair Availability contract for the USNS CHARLES DREW (T-AKE 10), a Navy replenishment ship. The work item, identified as Category "A" with completion date of May 25, 2026, requires the removal, overhaul, rewind, dynamic balancing, and reinstallation of the M10 Supply Fan Assembly located in the 2-58-1 Aft Service Tunnel on the starboard side, second deck.
The contractor must perform a comprehensive motor overhaul on a Toshiba Model 063638-MTR motor (460VAC, 3-phase, 60 Hz, 125/41 AMPS, 1785/892 RPMs) that requires removal from the vessel, transport to a certified electric motor repair facility, disassembly, stator winding inspection with focus on the failed high-speed winding, dip and bake treatment, installation of new bearings and seals, complete reassembly with anti-seize compound application, and bench testing. Critical safety requirements include strict adherence to High Voltage area restrictions and testing all electrical cables to ensure they are de-energized before work begins. Upon return to the vessel, the contractor must reinstall the assembly on a cleaned foundation with soft-foot verification, perform insulation resistance testing via Megger, conduct dynamic balancing of the fully assembled unit with fan blades, coordinate operational testing with Ship's Force for a minimum of one hour while monitoring bearing temperatures and vibration levels, and submit comprehensive documentation including detailed service reports, electrical test results, bearing part numbers, and rotor balancing corrections. The Government will furnish two motor bearings (6318C3), and the work must comply with applicable technical references including T9513-AE-MMC-10 and MSFSC SWIRRR #19 for AC Motors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACHMENT_J_2_Contractor_Price_Breakdown_N6264926RK010_0001.xlsx | XLSX spreadsheet | |
| ATTACHMENT_J_1_Work_Spec_MSCOK 26-011_N6264926RK010_0001.docx | DOCX document | |
| ATTACHMENT_J_2_Contractor_Price_Breakdown_N6264926RK010.xlsx | XLSX spreadsheet | |
| ATTACHMENT_J_2_Contractor_Price_Breakdown_N6264926RK010.xlsx | XLSX spreadsheet | |
| ATTACHMENT_J_1_Work_Spec_MSCOK 26-011_N6264926RK010.docx | DOCX document | |
| ATTACHMENT_J_4_IRS_FORM_W_14_N6264926RK010.pdf | ||
| Solicitation - N6264926RK010.pdf | ||
| ATTACHMENT_J_3_Contractor_Data_Sheet_N6264926RK010.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS Drew
( TAKE 10 )
| ELECTRICAL |
| CONTRACT NO. MSCOK-010 CHD July VRA |
| ITEM NO. 0301 |
| CATEGORY "A" |
| 2026-05-25 |
| M10 AMR SUPPLY FAN OVERHAUL AND MOTOR REWIND |
| Morelen, Jerrid |
ABSTRACT:
This item describes the requirement to remove, overhaul, rewind, dynamically balance, and reinstall the M10 Supply Fan Assembly.
REFERENCES:
2.1 T9513-AE-MMC-10, Ventilation Fans and Dampers
2.2 MSFSC SWIRRR #19 for AC Motors.
ITEM LOCATION AND DESCRIPTION:
3.1 Location/Quantity:
3.1.1 Location: 2-58-1 Aft Service Tunnel, STBD side 2nd Deck
3.1.2 Quantity: One (1) Supply Fan Assembly
3.2 Item/Description/Manufacturers Data:
3.2.1 Toshiba Model 063638-MTR (P04100KIADAKCT01), 460VAC, 3 Ph, 60 Hz, 125/41 AMPS, 1785/892 RPMs, Frame: 444TZ
3.2.2 Bill of Material (Contractor Furnished): None
GOVERNMENT FURNISHED EQUIPMENT/MATERIALS/SERVICES:
| Description |
| Part Number |
| Quantity |
| Motor Bearing |
| 6318C3 |
| 2 |
NOTES:
5.1 This ship contains High Voltage (HV) electrical systems. The Contractor and Subcontractors shall obey all posted and verbal instructions regarding safety and exclusion from High Voltage areas. At no time shall a Contractor or Subcontractor approach, work on, or enter a High Voltage area without proper authorization.
5.2 The Ship’s electrical color-coding does not follow consistent color scheme. The ship is known to have current carrying conductors colored green, blue, black, and white. The Contractor shall assume all electrical cables are hot until tested otherwise. The Contractor shall test all electrical cables to ensure they are dead prior to working on the item.
QUALITY ASSURANCE REQUIREMENTS: None additional
STATEMENT OF WORK REQUIRED:
5.3 Mechanically and electrically isolate the M10 AMR Supply Fan. Mark the motor/line leads to ensure correct phase rotation during re-connection.
5.4 Unbolt the assembly from the foundation. Bag/tag and retain fasteners for reinstallation.
5.5 Rig out the assembly off the vessel and transport to a certified electric motor repair facility for overhaul. Ships crane can be used to crane the motor to the pier. Note: The designated route for removal and return of the equipment is through the pilot embarkation door ("sally port") on the STBD side. The contractor shall verify clearances prior to removal.
5.6 Disassemble the motor and inspect the motor stator windings and rotor.
5.7 Inspect end bell bearing housings for damage.
5.8 Rewind the two-speed motor, with specific attention to correcting the failed High-Speed winding.
5.9 Dip and Bake the motor stator.
5.10 Remove the drive end and non-drive end bearings from the rotor.
5.11 Install new bearings and seals. Renew internal leads as required. Completely reassemble the motor, liberally applying anti-seize to all fasteners. Renew assembly hardware and gaskets on covers, inspect plates, and between the external connection box and frame.
5.12 Reassemble the motor.
5.13 Bench test the refurbished motor to ensure voltage and current are stable and within acceptable tolerance under no-load condition. MSCREP will witness the shop test.
5.14 Perform dynamic balancing of the fully assembled unit (motor with blades on) to ensure vibration is within acceptable operational tolerances prior to shipboard installation.
5.15 Transport the assembly back to the vessel, rig down to their respective space, and stage near the foundation.
5.16 Clean the existing foundation to bare metal, removing all rust, scale, and debris. Inspect for damage and report any discrepancies to the MSCREP.
5.17 Install the assembly on the foundation. Verify and correct any "soft foot" conditions using stainless steel shims.
5.18 Reconnect all electrical leads and terminate in accordance with standard marine practices.
5.19 Prior to energizing, perform an Insulation Resistance (Megger) test of the motor windings and supply cables. Submit results to the MSCREP.
5.20 Touch up any paint damaged during transport and installation.
5.21 Operational Testing: Coordinate with Ship's Force to run the fan across all operational modes for a minimum of one (1) hour. The contractor shall monitor and record bearing temperatures, vibration levels, and phase currents (amps). Submit a final operational test report to the MSCREP for acceptance.
5.22 Ship's Force shall conduct vibration testing to verify the unit meets operational standards. The contractor shall remain available to provide corrective action if the unit fails to meet vibration limits during this final check.
5.23 Preparation of Drawings/Documentation:
5.23.1 Provide the MSCREP with an electronic copy of the detailed service report to include the results of disassembly and inspection and all electric motor testing accomplished, rotor balancing results/corrections made, MFG and part numbers of the new bearings installed.
GENERAL REQUIREMENTS: None additional.
0301 - 4