ATTACHMENT_J_2_Contractor_Price_Breakdown_N6264926RK010_0001.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- USNS CHARLES DREW (T-AKE 10) VRA KR
- Solicitation number
- N6264926RK010
About this file
This is a Contractor Price Breakdown template for the USNS CHARLES DREW (T-AKE 10) Voyage Repair Availability solicitation N6264926RK010, scheduled for July 19, 2026. The spreadsheet is designed to capture pricing for both prime contractor and subcontractor labor and material costs across multiple work items.
The template lists 18 work items organized under Category A, including general requirements, technical and manufacturers representative support, utilities and general services, testing and quality assurance, gas-free certificates, and specific equipment repairs such as handrail replacement, painting, fan overhaul and motor rewind, ECDIS and S-Band repair, cargo crane cab repair, sprinkler gauge calibration, pump overhaul, eductor rod repair, piping work, lagging renewal, stateroom head renewal, and ventilation/louver replacement. The pricing structure requires separate entries for labor hours, labor price, material price (CFM), and other costs for both prime contractor and subcontractor, with a total price column. All line items in the provided template show zero values and are marked as "NSP" (Not Specified), indicating this is a blank template awaiting contractor completion. The solicitation is restricted to sources authorized to conduct business in South Korea per DFARS 252.225-7042, and Amendment 0001 (dated May 26, 2026) modified work item 0301 from refurbishing high-temperature chilled water pump motors to M10 AMR supply fan overhaul and motor rewind.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACHMENT_J_1_Work_Spec_MSCOK 26-011_N6264926RK010_0001.docx | DOCX document | |
| 0301_A_M10 AMR Supply Fan Overhaul and Motor Rewind.docx | DOCX document | |
| ATTACHMENT_J_2_Contractor_Price_Breakdown_N6264926RK010.xlsx | XLSX spreadsheet | |
| ATTACHMENT_J_2_Contractor_Price_Breakdown_N6264926RK010.xlsx | XLSX spreadsheet | |
| ATTACHMENT_J_1_Work_Spec_MSCOK 26-011_N6264926RK010.docx | DOCX document | |
| ATTACHMENT_J_4_IRS_FORM_W_14_N6264926RK010.pdf | ||
| Solicitation - N6264926RK010.pdf | ||
| ATTACHMENT_J_3_Contractor_Data_Sheet_N6264926RK010.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| USNS CHARLES DREW VRA KR | ||||||
| 6 - 19 JUL 2026 | PRIME CONTRACTOR | SUBCONTRACTOR | Prime Labor Rate : | $0.00 | ||
| Work Item No. | Title | Labor hrs. | Labor |
Price US$ Material Price
(CFM)
US$ Labor hrs. Labor Price US$ Material Price
(CFM)
US$ Other (specify in Remarks)
| US$ | Total Price | ||||||||||
| US$ | CAT | ||||||||||
| 1 | TAKE-SWI-Scope General Requirements and Definitions | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | |
| 2 | TAKE-SWI-Technical and Manufacturers Representative | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | |
| 3 | Utilities and General Services for Ship and Port Engineer | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 4 | TAKE-SWI-Testing and Quality Assurance | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | |
| 20 | TAKE-SWI-Gas Free Certificates | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 102 | Handrail Replacement | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 173 | Point and Paint 2K SQFT Topside | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 301 | M10 AMR Supply Fan Overhaul and Motor Rewind | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 302 | Refurbish Fan Motors | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 449 | ECDIS and S-Band Repair | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 503 | Cargo Crane No.1 Cab Repair | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 512 | TAKE-CSI-Magazine Sprinkler Gauge Calibration (1YR) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 515 | No.2 Central Seawater Pump Overhaul | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 525 | Eductor Reach Rod Repair | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 557 | Misc. Piping | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 574 | Lagging Renewal | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 601 | Stateroom Head Renewal | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 802 | Vent and Louver Replacement | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 803 | AC Coil Repairs | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A |
TOTAL CAT A 0 $0.00 $0.00 0 $0.00 $0.00 $0.00 $0.00
Remarks: (provide the information in space below. Use separate sheet of paper if necessary.)
N40345-17-R-0038 ATTACHMENT J-5
Sheet2
Sheet3
File details come from the government source that posted it. Updated .