Solicitation Amendment N6264926RK0040002 SF 30.pdf
PDF 580 KB Posted
- Attached to
- USS MIGUEL KEITH (ESB-5) MILCREW VRA KR
- Solicitation number
- N6264926RK004
About this file
This is a Standard Form 30 (Amendment of Solicitation/Modification of Contract) issued by the Naval Supply Fleet Logistics Center Yokosuka on February 23, 2026. The amendment modifies solicitation N6264926RK004, dated January 22, 2026, for work on the USS MIGUEL KEITH (ESB-5) MILCREW involving multiple maintenance and repair tasks under Work Specification SING-005-26. The amendment provides clarification responses to contractor questions and is not extending the proposal due date, which remains February 26, 2026 at 10:00 AM. Contractors must acknowledge receipt of this amendment by the specified deadline through one of three methods: completing and returning amendment items 8 and 15, acknowledging receipt on each offer copy, or submitting separate written communication referencing the solicitation and amendment numbers.
The amendment modifies Section J (List of Attachments) and includes six attachments: the Composite Work Package SING-005-26 with Required Certificate List, Price Proposal Breakdown Form, SRF Det Singapore Local Standard Items (FY26), Contractor Data Sheet, Request for Specification Clarification, and FAR 52.229-11 Tax on Certain Foreign Procurements form. The government provided responses to three contractor questions regarding alternative weight testing facilities in Korea for Work Item 572-12-001, clarification on material specifications and quantities for Work Item 635-11-001 (Insulation and Lagging), and confirmation that left and right guide rails for Work Item 588-30-001 (Helicopter Hangar Door Repair and Preserve) will not be provided as they do not require replacement and should be reinstalled as-is.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section J - List of Attachments
Miscellaneous text in this section has been modified to:
The following documents, exhibits, and other attachments that form part of this solicitation are as follows.
ATTACHMENT NUMBER TITLE / DESCRIPTION
J-1 Composite Work Package SING-005-26 & Required Certificate List
J-2 Price Proposal Breakdown Form
J-3 SRFSG_009 - SRF Det Singapore Local Standard Items (FY26) 01OCT2025
J-4 Contractor Data Sheet
J-5 Request for Specification Clarification SING-005-26
J-6 FAR 52.229-11 Tax on Certain Foreign Procurements - Notice and Representation: IRS Form W-14
Questions & Answers
- Work Item# 572-12-001 Truck, Pallet Electric Equipment Inspect and Weight Test; accomplish
QUESTION: Section 4.6, "List of NAVSEA Certified Weight Testing Facilities" does not list any facility within Korea. Can a Korean facility without NAVSEA certification be used as an alternative? and it wondered if the NAVSEA certification requirement can be substituted with an MSC-approved OEM or a recognized Classification Society.
GOV'T ANSWER: Please provide your alternative for evaluation to see if they would mee the intend of the NAVSEA certification. Additionally provide the information about the facility to where this work would be accomplished.
- Work Item# 635-11-001 Insulation and Lagging; replace
QUESTION: Para. 3.5 specifies the purchase and supply of materials for plate type and pipe type insulation, including caps and studs, while Para. 5 lists the GFM materials that are to be supplied when the work is performed. Among the materials included in Para. 3.5 and Para. 5, the overlapping items are plate type insulation and studs. There are significant discrepancies when compared with the quantities stated on page 5 of the work certificate. For example, under CFM, insulation material (K-Flex Sheet, 1"x36"x48" or equal) is specified to be supplied in a quantity of 20 sheets.
However, the quantities indicated on page 5 of the work certificate are 186 sqft for the duct and 10 sqft for the bulkhead, totaling approximately 200 sqft. Similarly, for studs, it is specified that 100 EA will be supplied under GFM, whereas under CFM, it is stated that 15 EA should be supplied.
Accordingly. we kindly request clarification as to whether the materials mentioned in Para. 3.5 are required for the execution of the work itself or are materials that must be supplied separately.
GOV'T ANSWER: Please provide the CFM called out in the work specification in Para. 3.5. The material in Para. 3.5 and 5 are different and do not overlap. The 100 studs under Para. 5 are different than the 15 stud caps called out in Para. 3.5. All material in 3.5 are CFM and required to complete the work and are different from the material in Para. 5. Please provide all material listed in Para. 3.5 as listed.
- Work Item# 588-30-001 Helicopter Hangar Door Repair and Preserve; accomplish
Question: Para. 3.6 specifies that Para. 1.3.1.3 Left Hand Guide Rail (HD8021) and Para. 1.3.1.4 Right Hand Guide Rail (HD8022) are to be removed and replaced with new parts.
N6264926RK0040002
However, these two items are not listed in the CFM list under Para. 3.6.1 nor in the GFM list under Para. 5.1.
Please confirm these items will be provides as GFM.
GOV'T ANSWER: New left and right guide rails are not being provided as they don't need to be replaced. Please reinstall the currently installed guide rails with the other new material in the Work Specification.
N6264926RK0040002
| IDCode: J |
| Page: 1 |
| Pages: 3 |
| AmendNo: 0002 |
| EffDate: 23 Feb 2026 |
| ReqNo: See Continuation Sheet |
| ProjNo: |
| IssCode: N62649 |
| AdmCode: |
| IssuedBy: NAVSUP FLT LOG CTR YOKOSUKA |
PSC 473 BOX 11, FPO AP 96349-1500
FPO, AP 96349-1500
UNITED STATES
Hyon Yang, Email: hyon.t.yang2.ln@us.navy.mil Telephone: 315-763-8719 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: N6264926RK004 |
| SolDate: 22 Jan 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: Name of Vessel: USS MIGUEL KEITH (ESB-5) MILCREW |
Work Specification: SING-005-26
The purpose of this solicitation amendment is to provide response to the Request for Clarification received.
All other terms, conditions, and the proposal due date on 26 Feb 2026 @ 10 AM remain unchanged.
| ContNameTitle: |
| CoNameTitle: Willie J. Harris |
| ContDate: |
| CODate: 23 Feb 2026 |
File details come from the government source that posted it. Updated .