J-1 MGK required Certs.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
USS MIGUEL KEITH (ESB-5) MILCREW VRA KR
Solicitation number
N6264926RK004
Issued by

About this file

This is a certification and qualification requirements matrix for work to be performed on USS MIGUEL KEITH (ESB-5) during a Voyage Repair Availability in South Korea. The document specifies mandatory certifications and qualifications that personnel must possess to execute various maintenance and repair tasks across multiple work packages.

The required certifications and qualifications include: AC&R (Air Conditioning and Refrigeration) certification, NAVSEA forklift certification, weight testing facility qualifications, weld procedure specifications (WPS) and weld records (WPQR), welder qualifications with eye exams valid within six months, filler metal control documentation, NDT (Non-Destructive Testing) procedures with Inspector Level I, II, or III certification, stud welding qualifications, coating inspector credentials (NBPI or NACE CIP 1 or SSPC PCI 2), and specific work package requirements. The work packages identified include stuffing tubes and mounting bracket welding, watertight door welding, aviation magazine drain valve replacement, deck drain piping replacement, electric pallet truck inspection and weight testing, light fixture mounting plate and support replacement and preservation, fiddle board replacement and preservation, and insulation and lagging replacement. All work must be performed in compliance with NAVSEA standards and procedures, with personnel maintaining current certifications throughout the contract performance period.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Work SpecTitleAC&R CertifiedNAVSEA Forklift Cert Weight Testing FacilityWeld Procedure
(WPS)Weld Record
(WPQR)Welder qualification, eye exam, quals w/in 6 monthsFiller

Metal Control

DocNDT
ProcedureNDT
Inspector, I, II, IIIStud Welding Qual TestCoating

Inspector NBPI or NACE CIP 1 or SSPC PCI 2

136-00-001Stuffing Tubes and mounting brackets welding√√√√√√
167-11-001Watertight door welding√√√√√√
526-11-001Aviation Magazine Drain Valves; replace√√√√√√
526-11-002Deck Drain Piping; replace√√√√√√
572-12-001Truck, Pallet Electric Equipment Inspect and Weight Test; accomp√
612-11-001Light Fixture Mounting Plate, Pipe and Angle Bar Support Replace and Preserve; accomplish√√√√√√
631-20-001Fiddle Board Replace and Preserve; accomplish√√√√√√
635-11-001Insulation and Lagging; replace√

File details come from the government source that posted it. Updated .