J-1 MGK required Certs.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- USS MIGUEL KEITH (ESB-5) MILCREW VRA KR
- Solicitation number
- N6264926RK004
About this file
This is a certification and qualification requirements matrix for work to be performed on USS MIGUEL KEITH (ESB-5) during a Voyage Repair Availability in South Korea. The document specifies mandatory certifications and qualifications that personnel must possess to execute various maintenance and repair tasks across multiple work packages.
The required certifications and qualifications include: AC&R (Air Conditioning and Refrigeration) certification, NAVSEA forklift certification, weight testing facility qualifications, weld procedure specifications (WPS) and weld records (WPQR), welder qualifications with eye exams valid within six months, filler metal control documentation, NDT (Non-Destructive Testing) procedures with Inspector Level I, II, or III certification, stud welding qualifications, coating inspector credentials (NBPI or NACE CIP 1 or SSPC PCI 2), and specific work package requirements. The work packages identified include stuffing tubes and mounting bracket welding, watertight door welding, aviation magazine drain valve replacement, deck drain piping replacement, electric pallet truck inspection and weight testing, light fixture mounting plate and support replacement and preservation, fiddle board replacement and preservation, and insulation and lagging replacement. All work must be performed in compliance with NAVSEA standards and procedures, with personnel maintaining current certifications throughout the contract performance period.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Work Spec | Title | AC&R Certified | NAVSEA Forklift Cert Weight Testing Facility | Weld Procedure | |
| (WPS) | Weld Record | ||||
| (WPQR) | Welder qualification, eye exam, quals w/in 6 months | Filler |
Metal Control
| Doc | NDT | |
| Procedure | NDT | |
| Inspector, I, II, III | Stud Welding Qual Test | Coating |
Inspector NBPI or NACE CIP 1 or SSPC PCI 2
| 136-00-001 | Stuffing Tubes and mounting brackets welding | √ | √ | √ | √ | √ | √ | ||
| 167-11-001 | Watertight door welding | √ | √ | √ | √ | √ | √ | ||
| 526-11-001 | Aviation Magazine Drain Valves; replace | √ | √ | √ | √ | √ | √ | ||
| 526-11-002 | Deck Drain Piping; replace | √ | √ | √ | √ | √ | √ | ||
| 572-12-001 | Truck, Pallet Electric Equipment Inspect and Weight Test; accomp | √ | |||||||
| 612-11-001 | Light Fixture Mounting Plate, Pipe and Angle Bar Support Replace and Preserve; accomplish | √ | √ | √ | √ | √ | √ | ||
| 631-20-001 | Fiddle Board Replace and Preserve; accomplish | √ | √ | √ | √ | √ | √ | ||
| 635-11-001 | Insulation and Lagging; replace | √ |
File details come from the government source that posted it. Updated .