This is a Performance Work Statement (PWS) for Voyage Repair Availability (VRA) work aboard the USS MIGUEL KEITH (ESB-5) at Busan, Korea, with a period of performance from March 23 to April 5, 2026. The work is organized as composite work packages under specification SING-005-26 and includes 17 distinct work items covering structural repairs, preservation, equipment maintenance, and certification testing.
The major work items include: replacement of stuffing tubes and mounting brackets (136-00-001); powder coating and preservation of quick-acting watertight doors (167-10-001 and 167-10-002); repair and preservation of watertight doors with welded components (167-11-001); replacement of drain valves and piping (526-11-001 and 526-11-002); inspection and weight testing of electric pallet trucks (572-12-001); repair and preservation of helicopter hangar doors (588-30-001); replacement and preservation of light fixture mounts and pipe supports (612-10-001 and 612-11-001); replacement of metal joiner doors and vinyl deck coverings (624-12-001 and 634-10-001); replacement of insulation and lagging (635-11-001); replacement of fiddle boards with preservation (631-20-001); preservation of exterior bulkheads at multiple levels (631-21-001 and 631-21-002); re-certification of handling beams (703-00-001); preservation of ammunition locker sunshields (763-11-001); and provision of temporary scaffolding and staging (991-11-001). All work requires compliance with NAVSEA Standard Items, specific welding qualifications, non-destructive testing procedures, surface preparation standards, coating applications with dry film thickness measurements, hot work authorizations, tag-out verifications, and operational testing with documented Test and Inspection Verification Sheets (TIVS) submitted within three days of completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
SRF DET SINGAPORE (NMD)
USS MIGUEL KEITH (ESB 5)
SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED
SPECIFICATION NUMBER: SING-005-26
INCLUDES ALL CHANGES THROUGH 1/1/2026
PERIOD OF PERFORMANCE: 23MAR - 05APR 2026
LOCATION: BUSAN, KOREA
INDEX
SHIP: USS MIGUEL KEITH (ESB 5) SING-005-26
ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.
CATEGORY I. FY-26 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
ITEM_NO. TITLE CHANGE DATE CHANGE
009-001 General Criteria; accomplish 09/04/2024 Original
009-002 Environmental Compliance Report for Material Usage; accomplish 07/22/2024 Original
009-003 Toxic and Hazardous Substance; control 07/22/2024 Original
009-004 Quality Management System; provide 09/16/2024 Original
009-005 Temporary Access; accomplish 11/18/2024 CH-1
009-006 Maintaining Protection and Cleanliness from Non-Radioactive Operations;
accomplish
07/22/2024 Original
009-007 Confined Space Entry, and Certification; accomplish 09/04/2024 Original
009-008 Shipboard Fire Protection and Fire Prevention; accomplish 09/30/2024 Original
009-010 Asbestos-Containing Material (ACM); control 09/16/2024 Original
009-018 Mine Warfare Ships Magnetic Material; control 09/04/2024 Original
009-019 Provisioning Technical Documentation (PTD); provide 07/22/2024 Original
009-020 Government Property; control 07/22/2024 Original
009-021 Alteration Verification, Logistic and Technical Data; provide 07/22/2024 Original
009-023 Interference; remove and install 11/18/2024 CH-1
009-024 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; accomplish 09/16/2024 Original
009-034 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 07/22/2024 Original
009-039 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component; accomplish
07/22/2024 Original
009-040 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide
07/22/2024 Original
009-060 Schedule and Associated Report for CNO Availability; provide and manage 09/16/2024 Original
009-061 Shipboard Use of Fluorocarbons; control 09/16/2024 Original
009-067 Integrated Total Ship Testing; manage 09/16/2024 Original
009-068 Availability Work Certification (AWC) Data for Chief of Naval Operations (CNO) Availabilities; provide
09/16/2024 Original
009-069 Heavy Weather/Mooring Plan; provide 09/16/2024 Original
009-070 Confined Space Entry, Certification, Fire Protection, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish
09/16/2024 Original
009-072 Physical Security at a Private Contractor Facility; accomplish 09/16/2024 Original
009-073 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair
09/16/2024 Original
009-074 Occupational, Safety and Health Plan; accomplish 09/16/2024 Original
009-080 Ship Facility; maintain 09/16/2024 Original
009-081 Compartment Closeout; accomplish 09/16/2024 Original
009-082 Installation of Equal Component Vice Specified Component; report 07/22/2024 Original
009-084 Threaded Fastener Requirement; accomplish 07/22/2024 Original
009-088 Collection, Holding and Transfer (CHT) and Motor Gasoline (MOGAS) Tank, Space, and Piping, including Sewage or MOGAS-Contaminated Tank, Space, and Piping; certify
09/16/2024 Original
009-093 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide
07/22/2024 Original
ITEM_NO. TITLE CHANGE DATE CHANGE
009-099 Ship Departure Report; provide 09/16/2024 Original
009-100 Ship's Stability; maintain 09/16/2024 Original
009-101 Ship Transit and Berthing; accomplish 09/16/2024 Original
009-106 Work Authorization Form Coordinator (WAFCOR); provide 09/16/2024 Original
009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 07/22/2024 Original
009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 07/22/2024 Original
009-111 Schedule and Associated Report for Non-CNO Availability; provide and manage 09/16/2024 Original
009-117 Combat Systems, Light-Off Suport; provide 09/17/2024 Original
009-118 CG Deck Loading; accomplish 07/22/2024 Original
009-120 Fact Finding and Critique of Unplanned Event; manage 09/17/2024 Original
009-122 Temporary Padeye; install and remove 11/18/2024 CH-1
009-125 Boat 65 Feet (20meters) Long and Less; accomplish 11/18/2024 CH-1
009-126 Schedule Model Review (SMR); accomplish 09/17/2024 Original
CATEGORY II. FY-26 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER.
TITLE CHANGE DATEITEM NO. CHANGE
009-011 Insulation and Lagging; accomplish 09/16/2024 Original
009-012 Weld, Fabricate, and Inspect; accomplish 09/16/2024 Original
009-025 Structural Boundary Test; accomplish 09/04/2024 Original
009-026 Deck Covering; accomplish 09/25/2024 Original
009-032 Cleaning and Painting Requirements; accomplish 09/25/2024 Original
ITEM NO. TITLE
Stuffing Tubes and Mounting Bracket; replace136-00-001
Quick Acting Watertight Doors (A1-80-2 and A1-79-4) Powder Coating;
accomplish
167-10-001
Aviation Magazine (A1-79-2) and Small Arms AMMO Magazine (A1-78-4) H120 Doors Preservation; accomplish
167-10-002
Quick Acting Watertight Door (A1-90-2); repair and preserve167-11-001
Aviation Magazine Drain Valves; replace526-11-001
Deck Drain Piping; replace526-11-002
Truck, Pallet Electric Equipment Inspect and Weight Test; accomplish572-12-001
Helicopter Hangar Door Repair and Preserve; accomplish588-30-001
Mission Deck and Flight Deck Removable Stanchions Preservation;
accomplish
612-10-001
Light Fixture Mounting Plate, Pipe and Angle Bar Support Replace and Preserve; accomplish
612-11-001
Metal Joiner Door and Frame; replace624-12-001
Fiddle Board Replace and Preserve; accomplish631-20-001
A6 Through A8 Level Exterior Bulkhead Preservation; accomplish631-21-001
A1 Level Armory / Aviation Magazine Exterior Bulkhead Preservation;
accomplish
631-21-002
Enlisted Berthing and S-3 Admin Office Vinyl Deck Covering Replacement; accomplish
634-10-001
Insulation and Lagging; replace635-11-001
MK 18 Mod 2, Handling Beams Re-certification; accomplish703-00-001
Ready Service Locker (RSL), PYRO THECNIC Locker, and CAD Locker Sunshields Preservation; accomplish
763-11-001
Temporary Service; provide991-11-001
SAFE FOR HOT WORK CERTIFICATE
SHIP: USS MIGUEL KEITH (ESB 5) ITEM NO: 136-00-001
COAR: 26 PCN: CC01-L005
CMP: NONE
PLANNER: BARTOLOME, LUCIANO
BAUSER, BRANDON
MARCOS, FRANK SRFDS
SSP: SING-005-26 1 of 16 ITEM NO: 136-00-001
1. SCOPE:
1.1 Title: Stuffing Tubes and Mounting Bracket; replace
1.2 Location of Work:
1.2.1 A5 Weather Deck, Port and Starboard
1.2.1.1 Above WTD A5-96-2 [CKT EL109-5(5)]
1.3 Identification:
1.3.1 Quantity (2 EA), Stuffing Tube, MIL-S-24235/17, Carbon Steel.
1.3.2 Quantity (1 EA), Light Fixtures CKT EL109-05(9) Mounts, 13.5 inch x 8.5 inch x 0.125 inch, Carbon Steel.
1.3.3 Quantity (1 EA), 1 MC Speaker CKT C-PA1XX-1 Stanchion, 2.5 inch x 8 inch x 0.125 inch, Carbon Steel.
2. REFERENCES:
2.1 NAVSEA Standard Items, (FY26)
2.2 S0400-AD-URM-010/TUM Rev 8, TAG-OUT USERS MANUAL
2.3 S9086-VD-STM-010/CH-631 Rev 3, Preservation of Ship in Service General
2.4 NAVSEA Reviewed, ASTM F-718
2.5 AMPP, NACE/SSPC Standards
2.6 MIL-STD-2035 Rev A, Nondestructive Testing Acceptance Criteria
2.7 801-8468127 Rev Q, General Arrangement
2.8 100-8468266 Rev L, Construction Drawing FC Zone
2.9 MIL-STD-2003-3A (SH), Electric Plant Installation Standard Methods for Surface Ships and Submarines (Penetrations)
2.10 MIL-STD-1310 Rev H, Shipboard Bonding, Grounding, and Other Techniques for Electromagnetic Compatibility and Safety
2.11 MIL-S-24235 Rev 19A, Stuffing Tubes, Metal, and Packing Assemblies for Electrical Cables, Swage Type, Steel and Aluminum, for Deck and Bulkheads with Pipe Protection
2.12 MIL-STD-1689, Fabrication, Welding, and Inspection of Ships Structure
2.13 MIL-STD-22 Rev D, Welded Joint Design
2.14 76-89-400, Penetration, Single Cable, Sleeve, Insert, FRR/LEHF Rubber (Fire/Water/Gas Tight Bulkhead & Deck)
3. REQUIREMENTS:
3.1 As required by 2.1, the Contractor must submit legible copies in
SHIP: USS MIGUEL KEITH (ESB 5)
SSP: SING-005-26 2 of 16 ITEM NO: 136-00-001
English of the documents listed below to the NAVSUP FLC (Contracting) Singapore for review and acceptance prior to commencing of work. Document in Enclosure (One). See Note 4.1.
3.1.1 Welding:
3.1.1.1 Submit WPS intended for use.
3.1.1.2 Submit PQR with NDT records supporting PQR.
3.1.1.3 Submit Filler Metal control procedure.
3.1.2 Welder:
3.1.2.1 Submit welder performance qualification to the proposed
WPS.
3.1.2.2 Submit record of eye exam.
3.1.2.3 Submit evidence of qualification updates within last 6 months.
3.1.3 NDT process:
3.1.3.1 Submit applicable NDT procedure(s).
3.1.3.2 Submit NDT written practice.
3.1.4 NDT personnel:
3.1.4.1 Submit NDT Level II inspector certification(s).
3.1.4.2 Submit NDT Level III certification supporting NDT
procedure approval.
3.1.5 Welding Details:
Base Material 1: Carbon Steel (S-1), ASTM A 53, Thickness: 1/4 inch, Minimum Fillet Size: 4.5mm
Base Material 2: Carbon Steel (S-1), ASTM A 36, Thickness: 1/4 inch, Minimum Fillet Size: 4.5mm
Joint Design: PT1S.1
Welding Position: All
Process: GMAW, GTAW, FCAW, SMAW
Fabrication Classification: MIL-STD-1689
(V)(G) "RESTRICTION SHEET BRIEFING"
3.2 Contractor must attend a briefing on WPS restriction sheets as directed by the SUPERVISOR and must have in their possession copies of the restriction sheets for use at the job site. Document results in Enclosure (One)
(V)(G) "RESTRICTION SHEET BRIEFING"
3.3 Contractor must attend a briefing on NDT restriction sheets as directed by the SUPERVISOR and must have in their possession copies of the restriction sheets for use at the job site. Document results in Enclosure (One).
(V)(G) "TAG-OUT VERIFICATION"
3.4 Prior to commencement of work, contractor shall obtain Ship’s Force
SSP: SING-005-26 3 of 16 ITEM NO: 136-00-001 verification of tag out and conduct Repair Activity (RA) verification by signing each tag using 2.2 for guidance. Documents results in Enclosure (1). See Note 4.1
3.4.1 Ensure that each equipment listed in 1.3 are properly tagged to their exact location, using metal tags secured with wire for each one. Documents results in Enclosure (1).
3.5 Obtain Hot Work authorization Form from the Ship Force Fire Marshall before commencement of hot work. Post the approved hot work authorization form conspicuously at the entrance to each area where hot work is being formed. Document in Enclosure (One).
3.5.1 Provide trained fire watches with fully charged and operable fire extinguisher suitable to the type of hot work being performed at work site and must remain at the job site for 30 minutes from the time the hot work is completed unless the contractor's Hot Work supervisor surveys the affected work area and determine that there is no further fire hazard.
3.6 Accomplish a visual inspection of each equipment listed in 1.3 and located in 1.2 for structural integrity, deterioration, pitting, each crack and area of damage or distortion.
3.6.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of 3.6 to the SUPERVISOR. Document in Enclosure (One).
3.7 Disconnect electrically and mechanically of the equipment listed in
1.3 located in 1.2, using 2.2, and 2.7 through 2.14 for guidance. Record electrical hook up data for reconnection. Document results in Enclosure (One).
3.7.1 Identify, disconnect and isolate each cable. Record and retain electrical hook-up data, using 009-O73 for guidance.
3.7.1.1 Submit one legible copy, in hard copy or approved
transferable media, of a report listing results of 3.7 to the SUPERVISOR. Document on Enclosure (One).
3.7.2 Retain fasteners for re-use.
3.8 Remove existing and install new the materials listed in 1.3 located in 1.2, using 2.7 through 2.14 for guidance.
3.8.1 Accomplish 009-012 of 2.1 Table 2, Column A, lines one through 6 for the removal and installation of the equipment listed in 1.3.
3.8.2 Template exact size, configuration, and location from existing shipboard conditions.
3.8.3 Chip and grind surfaces flush in way of repairs.
(I)(G) "NON-DESTRUCTIVE TESTING (VT)"
3.9 Accomplish the requirements of 009-012 of 2.1 Table 2, Column A, Line 7. Document results in Enclosure (One). The accept or reject criteria must be in accordance with Section 4 of 2.6 for Class 3 inspection criteria. Document in Enclosure (One).
3.9.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of 3.9 to the SUPERVISOR. Document in Enclosure (One).
SSP: SING-005-26 4 of 16 ITEM NO: 136-00-001
(I)(G) "NON DESTRUCTIVE TESTING (MT)"
3.10 Accomplish the requirements of 009-012 of 2.1 Table Two, Column A, Line 11. Document results on Enclosure (One). The accept or reject criteria must be in accordance with 8.3 of 2.12.
3.10.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.10 to the SUPERVISOR. Document on Enclosure (One).
(V)(G) "LOCAL AIR HOSE TEST"
3.11 Accomplish a local air hose test of the equipment listed in 1.3.1, located in 1.2.1.2 in accordance with 009-025 of 2.1. Allowable leakage:
None. Document in Enclosure (One).
3.11.1 Air hose nozzle must be placed at less than 3 inches, but greater than zero inches, from the area to be tested and pressure directed at the structure under test in a manner most likely to disclose leaks.
3.11.2 The minimum nozzle diameter must be 3/8 inch and the nozzle pressure must be 90 plus or minus 5 PSIG as monitored at the nozzle.
3.11.3 Apply a soapy solution to the opposite side of the structure and inspect for leaks.
3.11.4 Inspect joint or fitting for leakage by observing for
formation of bubbles. Allowable leakage: None.
3.12 Accomplish preservation of the equipment listed in 1.3 in accordance with 009-032 of 2.1, including Table 2, Line 2, Columns B, C, and G.
3.12.1 Accomplish surface preparation with power tool cleaning to bare metal using 2.4 for guidance
3.12.2 Accomplish degreasing/cleaning prior to surface preparation to ensure that the surface is free of contamination in accordance with SSPC-SP-1 of 2.5.
3.13 Electrically connect wiring for equipment disconnected in 3.1 using hookup data recorded in 3.7. and 2.7 through 2.11 for guidance.
3.14 Accomplish the requirement of 009-032 of 2.1 for new and disturbed surfaces.
3.15 Accomplish the requirement of 009-011 of 2.1 for new and disturbed insulation
(V)(G) "OPERATIONAL TEST"
3.16 Contractor to witness operational test of the system associated with the newly installed stuffing tube and light fixtures while Ship's Force conduct the operational test. The contractor shall correct any discrepancies resulting from work associated with this Work Item.
Document in Enclosure (One) See Note 4.1.
3.17 Submit One Legible copy of report, in hard copy or electronic media certifying that all work associated with this work item has been accomplished. Submit report no later than 3 days after completion to the SUPERVISOR. Document in Enclosure (One) See Note 4.1.
SSP: SING-005-26 5 of 16 ITEM NO: 136-00-001
4. NOTES:
4.1 Enclosure (One) is a Test and Inspection Verification Sheet (TIVS)
4.2 NAVSEA Standard Items (NSI) are available at:
https://www.navsea.navy.mil/Home/RMC/CNRMC/Our-Programs/SSRAC
4.3 Port Engineer to provide Stuffing Tube.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
TOTAL
QUANTITY
PROVIDED NAME Of PART
PIECE
NO.
REF
NO.
NATIONAL
STOCK
NO.
REQ
PARA NO.
1. 1 GL
PPG Amercoat 240
- Oxide Red N/A 2.5
MIL-
PRF23236
- VII-5-
C 3.14
2. 1 GL
PPG Amercoat 240
- Buff N/A 2.5
MIL-
PRF23236
- VII-5-
C 3.14
3. 1 GL
PPG PSX-700SG -
Haze Gray N/A 2.5
MIL-
PRF24635
-V2-B-2 3.14
4. 1 GL Adhesive, White MILA3316 2.1 8041-01- 154-4119 3.15
5. 1 RO
Tape, Insulation; 3" x 150'
MILC2007
9 2.1
8315-00- 267-1633 3.15
5.2 PUSH MATERIAL:
TOTAL
QUANTITY
PROVIDED NAME Of PART
PIECE
NO.
REF
NO.
NATIONAL
STOCK
NO.
REQ
PARA NO.
1. 2 EA STUFFING TUBE
MIL-S-
24235/17 3.8
5.3 KITTED MATERIAL:
1. None.
SSP: SING-005-26 6 of 16 ITEM NO: 136-00-001
SSP: SING-005-26 7 of 16 ITEM NO: 136-00-001
SSP: SING-005-26 8 of 16 ITEM NO: 136-00-001
SSP: SING-005-26 9 of 16 ITEM NO: 136-00-001
SSP: SING-005-26 10 of 16 ITEM NO: 136-00-001
S H I P
U S S
M I G U E L
K E I T H
E S B
S S P
S I N G o f
I T E M
N O
E n c l o s u r e
O n e
T E S T
A N D
I N S P E C T I O N
V E R I F I C A T I O N
S H E E T
T I V S
S H I P S S P
U S S
M I G U E L
K E I T H
E S B
S I N G
A V
W o r k
I t e m
S t u f f i n g
T u b e r e p l a c e
L o c a t i o n W o r k
Z o n e
S h i p b o a r d
P A R A G R A P H
R E Q U I R E M E N T C O M P O N E N T
I D E N T I F I C A T I O N
R E S U L T S
A C T I V I T Y
S I G N A T U R E P R I N T E D
N A M E
K T R
S u b m i t
W P S i n t e n d e d f o r u s e
R E P O R T
S U B M I T T E D
Y E S N O
D A T E T I M E
S R F
D e t
S I N G
K T R
S u b m i t
P Q R w i t h
N D T r e c o r d s s u p p o r t i n g
P Q R
R E P O R T
S U B M I T T E D
Y E S N O
D A T E T I M E
S R F
D e t
S I N G
K T R
S u b m i t
F i l l e r
M e t a l c o n t r o l p r o c e d u r e
R e p o r t
S u b m i t t e d
Y e s
N o
D a t e
S R F
D e t
S I N G
I P
U S S
M I G U E L
K E I T H
E S B
S S P
S I N G o f
I T E M
N O
K T R
S u b m i t w e l d e r p e r f o r m a n c e q u a l i f i c a t i o n t o t h e p r o p o s e d
W P S
R e p o r t
R e c e i v e d
Y e s
N o
D a t e
S R F
D e t
S I N G
K T R
S u b m i t r e c o r d o f e y e e x a m
R e p o r t
R e c e i v e d
Y e s
N o
D a t e
S R F
D e t
S I N G
K T R
S u b m i t e v i d e n c e o f q u a l i f i c a t i o n u p d a t e s w i t h i n l a s t m o n t h s
R E P O R T
S U B M I T T E D
Y E S N O
D A T E T I M E
S R F
D e t
S I N G
K T R
S u b m i t a p p l i c a b l e
N D T p r o c e d u r e s
R E P O R T
S U B M I T T E D
Y E S N O
D A T E T I M E
S R F
D e t
S I N G
K T R
S u b m i t
N D T w r i t t e n p r a c t i c e
R E P O R T
S U B M I T T E D
Y E S N O
D A T E T I M E
S R F
D e t
S I
I P
U S S
M I G U E L
K E I T H
E S B
S S P
S I N G o f
I T E M
N O
K T R
S u b m i t
N D T
L e v e l
I I i n s p e c t o r c e r t i f i c a t i o n s
R E P O R T
S U B M I T T E D
Y E S N O
D A T E T I M E
S R F
D e t
S I N G
K T R
S u b m i t
N D T
L e v e l
I I I c e r t i f i c a t i o n s u p p o r t i n g
N D T p r o c e d u r e a p p r o v a l
R E P O R T
S U B M I T T E D
Y E S N O
D A T E T I M E
S R F
D e t
S I N G
K T R
K T R h a s b e e n b r i e f e d a n d i s i n p o s s e s s i o n o f t h e
W P S
R e s t r i c t i o n
S h e e t
S A T
U N S A T
D A T E T I M E
S R F
D e t
S I N G
K T R
K T R h a s b e e n b r i e f e d a n d i s i n p o s s e s s i o n o f t h e
N D T
R e s t r i c t i o n
S h e e t
S A T
U N S A T
D A T E T I M E
S R F
D e t
S I N G
S F
K T R
V G
T A G O U T
V E R I F I C A T I O N
P r i o r t o c o m m e n c e m e n t o f w o r k c o n t r a c t o r s h a l l o b t a i n
S h i p s
F o r c e v e r i f i c a t i o n o f t a g o u t a n d c o n d u c t
R e p a i r
A c t i v i t y
R A v e r i f i c a t i o n b y s i g n i n g e a c h t a g u s i n g f o r g u i d a n c e
T a g o u t
S e r i a l
N u m b e r
D A T E T I M E
S R F
D e t
S I N G
K T R
E n s u r e t h a t e a c h e q u i p m e n t l i s t e d i n a r e p r o p e r l y t a g g e d t o t h e i r e x a c t l o c a t i o n u s i n g m e t a l t a g s s e c u r e d w i t h w i r e f o r e a c h o n e
S A T
U N S A T
D A T E T I M E
S R F
D e t
S I
I P
U S S
M I G U E L
K E I T H
E S B
S S P
S I N G o f
I T E M
N O
K T R
O b t a i n
H o t
W o r k a u t h o r i z a t i o n
F o r m f r o m t h e
S h i p
F o r c e
F i r e
M a r s h a l l b e f o r e c o m m e n c e m e n t o f h o t w o r k
P o s t t h e a p p r o v e d h o t w o r k a u t h o r i z a t i o n f o r m c o n s p i c u o u s l y a t t h e e n t r a n c e t o e a c h a r e a w h e r e h o t w o r k i s b e i n g f o r m e d
H O T
W O R K
P O S T E D
D A T E T I M E
S R F
D e t
S I N G
K T R
S u b m i t o n e l e g i b l e c o p y i n h a r d c o p y o r a p p r o v e d t r a n s f e r r a b l e m e d i a o f a r e p o r t l i s t i n g r e s u l t s o f t o t h e
S U P E R V I S O R
R E P O R T
S U B M I T T E D
Y E S
N O
D A T E T I M E
S R F
D e t
S I N G
K T R
D i s c o n n e c t e l e c t r i c a l l y a n d m e c h a n i c a l l y o f t h e e q u i p m e n t l i s t e d i n l o c a t e d i n u s i n g t h r o u g h f o r g u i d a n c e
R e c o r d e l e c t r i c a l h o o k u p d a t a f o r r e c o n n e c t i o n
S A T
U N S A T
D A T E T I M E
S R F
D e t
S I N G
K T R
S u b m i t o n e l e g i b l e c o p y i n h a r d c o p y o r a p p r o v e d t r a n s f e r r a b l e m e d i a o f a r e p o r t l i s t i n g r e s u l t s o f t o t h e
S U P E R V I S O R
R E P O R T
S U B M I T T E D
Y E S
N O
D A T E T I M E
S R F
D e t
S I N G
K T R
I G
N O N
D E S T R U C T I V E
T E S T I N G
V T
A c c o m p l i s h t h e r e q u i r e m e n t s o f o f
T a b l e
C o l u m n
A
L i n e
D o c u m e n t r e s u l t s i n
E n c l o s u r e
O n e
T h e a c c e p t o r r e j e c t c r i t e r i a m u s t b e i n a c c o r d a n c e w i t h
S e c t i o n o f f o r
C l a s s i n s p e c t i o n c r i t e r i a
S A T
U N S A T
D A T E T I M E
S R F
D e t
S I
I P
U S S
M I G U E L
K E I T H
E S B
S S P
S I N G o f
I T E M
N O
K T R
S u b m i t o n e l e g i b l e c o p y i n h a r d c o p y o r a p p r o v e d t r a n s f e r r a b l e m e d i a o f a r e p o r t l i s t i n g r e s u l t s o f t o t h e
S U P E R V I S O R
R E P O R T
S U B M I T T E D
Y E S
N O
D A T E T I M E
S R F
D e t
S I N G
K T R
I G
N O N
D E S T R U C T I V E
T E S T I N G
M T
A c c o m p l i s h t h e r e q u i r e m e n t s o f o f
T a b l e
T w o
C o l u m n
A
L i n e
D o c u m e n t r e s u l t s o n
E n c l o s u r e
O n e
T h e a c c e p t o r r e j e c t c r i t e r i a m u s t b e i n a c c o r d a n c e w i t h o f
S A T
U N S A T
D A T E T I M E
S R F
D e t
S I N G
K T R
S u b m i t o n e l e g i b l e c o p y i n h a r d c o p y o r a p p r o v e d t r a n s f e r r a b l e m e d i a o f a r e p o r t l i s t i n g r e s u l t s o f t o t h e
S U P E R V I S O R
R E P O R T
S U B M I T T E D
Y E S
N O
D A T E T I M E
S R F
D e t
S I N G
K T R
V G
L O C A L
A I R
H O S E
T E S T
A c c o m p l i s h a l o c a l a i r h o s e t e s t o f t h e e q u i p m e n t l i s t e d i n l o c a t e d i n i n a c c o r d a n c e w i t h o f
A l l o w a b l e l e a k a g e
N o n e
S A T
U N S A T
D A T E T I M E
S R F
D e t
S I N G
K T R
V G
O P E R A T I O N A L
T E S T
C o n t r a c t o r t o w i t n e s s o p e r a t i o n a l t e s t o f t h e s y s t e m a s s o c i a t e d w i t h t h e n e w l y i n s t a l l e d s t u f f i n g t u b e a n d l i g h t f i x t u r e s w h i l e
S h i p s
F o r c e c o n d u c t t h e o p e r a t i o n a l t e s t
T h e c o n t r a c t o r s h a l l c o r r e c t a n y d i s c r e p a n c i e s r e s u l t i n g f r o m w o r k a s s o c i a t e d w i t h t h i s
W o r k
I t e m
S A T U N S A T
D A T E T I M E
S R F
D e t
S I
I P
U S S
M I G U E L
K E I T H
E S B
S S P
S I N G o f
I T E M
N O
K T R
S u b m i t
O n e
L e g i b l e c o p y o f r e p o r t i n h a r d c o p y o r e l e c t r o n i c m e d i a c e r t i f y i n g t h a t a l l w o r k a s s o c i a t e d w i t h t h i s w o r k i t e m h a s b e e n a c c o m p l i s h e d
S u b m i t r e p o r t n o l a t e r t h a n d a y s a f t e r c o m p l e t i o n t o t h e
S U P E R V I S O R
R E P O R T
S U B M I T T E D
Y E S
N O
D A T E T I M E
S R F
D e t
S I N G
W o r k
C o m p l e t e d
S i g n
P r i n t
D a t e
P r o j e c t
M a n a g e r
SHIP: USS MIGUEL KEITH (ESB 5) ITEM NO: 167-10-001
COAR: 26 PCN: ER04-0065
CG03-0291
CMP: NONE
PLANNER: MARCOS, FRANK
SRFDS
SSP: SING-005-26 1 of 6 ITEM NO: 167-10-001
1. SCOPE:
1.1 Title: Quick Acting Watertight Doors (A1-80-2 and A1-79-4) Powder Coating; accomplish
1.2 Location of Work:
1.2.1 Mildet-AT/FP Armory (A1-80-2)
1.3 Identification:
1.3.1 Quantity (One EA) Sprinkling Control Cabinet Single Quick Acting Watertight Door (A1-80-2), 10 Dogs, Size 30 Inches by 66 Inches, Material: Steel, Component ID No. 48 8031, Proof Test Press
22.5 PSI, Tightness Press 15 PSI, Drawing No. 803-6397268 Rev A
1.3.2 Quantity (One EA) Mildet-AT/FP Armory Double Quick Acting Watertight Door (A1-79-4), 7 Dogs, Size 60 Inches by 66 Inches, Material: Steel, Drawing No. 167-7569488 [JE2227], Component ID No.
289278-005
2. REFERENCES:
2.1 NAVSEA Standard Items, (FY 26)
2.2 S9086-UF-STM-010/CH-600 Rev 5, Structural Closures
2.3 803-6397268 Rev B, Doors Watertight, Quick Acting Arrangement
2.4 167-7569488 Rev E, Airtight and Watertight Double Doors Arrangement and Detail Non Standard
2.5 Maintenance Requirement Card, MRC Control Number: T4NJ, Inspect Quick Acting Watertight Doors
2.6 AMMP, Legacy NACE International / SSPC Standards
2.7 631-8393784 Rev P, Paint Schedule
2.8 Maintenance Requirement Card, MRC Control Number: J4MT, Replace Watertight/Airtight Door Gasket
2.9 Maintenance Requirement Card, MRC Control Number: J4MQ, Lubricate Watertight/Airtight US Navy Standard Door (Quick Acting) with no MACHALT
2.10 Maintenance Requirement Card, MRC Control Number: J4MS, Adjust Watertight/Airtight US Navy Standard Door
2.11 Maintenance Requirement Card, MRC Control Number: J4MP, Inspect and Test/Operate Exterior US Navy Standard Door.
3. REQUIREMENTS:
(V)(G) "RECEIPT INSPECTION"
3.1 Accomplish receipt inspection of the material listed in 5.1 with the SUPERVISOR to ensure material is suitable and adequate to accomplish this work requirement. All materials must be on hand before starting work.
Document result on enclosure (One).
SSP: SING-005-26 2 of 6 ITEM NO: 167-10-001
(V)(G) "VISUAL INSPECTION"
3.2 Accomplish a visual inspection of the door listed in 1.3 and located in 1.2, including associated framing, hinge assemblies, wedges and knife edge for structural integrity, deterioration, cracking, areas of wear, and damage or distortion, using 2.2 through 2.5 for guidance. Document result on enclosure (One).
3.2.1 Cycle each door twice (open and close) and check for proper seating, binding or erratic operation.
3.2.2 Submit one legible copy, in hard copy or approved transferable media, of a report listing results of the requirements of 3.2 to the SUPERVISOR. Document on Enclosure (One).
3.3 Remove watertight doors, using 2.2 and 2.3 for guidance. Remove closure classifications and disassemble hinge assemblies and dogging assemblies. Retain parts for reassembly.
3.4 Clean internal and external parts exposed by removals and disassembly free of oil, grease, dirt, loose paint and rust.
3.5 Inspect retained parts for deterioration, damage, wear or no longer serviceable for continued use.
3.5.1 Submit one legible copy, in hard copy or electronic media, of a report listing results of the requirements of 3.5 to the SUPERVISOR. Document on enclosure (one).
3.6 Remove existing and install new gasket provided as Government Furnish Material (GFM) in 5.1.1.
3.7 Accomplish the requirements of 009-032 of 2.1, including Table 2, Line 41, Columns A, and B for the door listed in 1.3, located in 1.2, using 2.2, 2.3, 2.6 and 2.7 for guidance.
3.7.1 Procure and apply MIL-PRF23236, TYPE VIIIA by fluidized bed method only, 10 mils minimum.
3.7.2 Door must be painted to match existing, exterior haze gray and interior soft white.
3.8 Accomplish the requirements of 009-032 of 2.1, including Table 2, Line One, Columns A, B, C, and G for the door frame of the equipment listed in 1.3, located in 1.2, using 2.2, 2.3, 2.6 and 2.7 for guidance and the materials provided as Government Furnish Material (GFM) in 5.1.
3.8.1 For touch-up, disturbed, and/or inaccessible areas, SSPC-SP 11 is acceptable for areas originally requiring a NACE 2/SSPC-SP 10 or NACE/SSPCSP WJ-2 of 2.6.
3.9 Install door removed in 3.3 and preserved in 3.7, located in 1.2, using 2.2 through 2.5, 2.8 through 2.11 for guidance.
3.9.1 Adjust the spring, each dog, hinge, and operating assembly of the door identified in 1.3 for proper operation and to obtain 1/8 inch gasket compression around entire perimeter. Ensure there is no binding or sticking of the dogging mechanism or between the cover and coaming assembly.
(V)(G) "CHALK TEST"
3.10 Accomplish the requirements of 009-025 of 2.1 for a chalk test of equipment identified in 1.3, located in 1.2, using 2.2 through 2.5, 2.8, SSP: SING-005-26 3 of 6 ITEM NO: 167-10-001
2.10 and 2.11 for guidance. Acceptance Criteria: The chalk imprint must be in the center 3/5 of the width of the gasket with 100 percent continuous contact of knife edge to gasket. Document on Enclosure (One).
(V)(G) "WATER HOSE TEST"
3.11 Accomplish the requirements of 009-025 of 2.1 for a water hose test of the equipment listed in 1.3 and located in 1.2, using 2.2 through 2.5,
2.8 through 2.11 for guidance. Allowable leakage: None. Document result on Enclosure (One).
(V)(G) "OPERATIONAL TEST"
3.12 Accomplish an operational test of the equipment listed in 1.3, located in 1.2 in accordance with paragraph 1.c of 2.11. Allowable binding and sticking: None. Document result on Enclosure (One).
3.13 Accomplish the requirements of 009-032 of 2.1 for each new and disturbed surface.
3.14 Submit one legible copy, in hard copy or approved transferable media, of Enclosure (One) to the SUPERVISOR within 3 days of repair.
Document on Enclosure (One)
4. NOTES:
4.1 NAVSEA Standard Items are available at:
https://www.navsea.navy.mil/Home/RMC/CNRMC/Our-Programs/SSRAC/
4.2 Enclosure (One) - Test and Inspection Verification Sheet
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
TOTAL
QUANTITY
PROVIDED NAME Of PART
PIECE
NO.
REF
NO.
NATIONAL
STOCK
NO.
REQ
PARA NO.
1. 2 SE Rubber Strip None 2.8 5330-01- 371-7183 3.6
2. 2 KT
Red Primer, MILPRF- 23236, Type V Or VI, Class 5 or 7 None 2.6
8010-01- 598-3541 3.8
3. 2 KT
Soft White, MIL PRF-23236, Type V Or VI, Class 5 or 7 None 2.6
8010-01- 598-4110 3.8
4. 2 KT
Haze Gray, MILPRF- 24635, Type V or VI, Class 2 Grade B or C None 2.6
8010-01- 382-1864 3.8
5.2 PUSH MATERIAL:
1. None.
I P
U S S
M I G U E L
K E I T H
E S B
S S P
S I N G o f
I T E M
N O
E N C L O S U R E
O n e
T E S T
A N D
I N S P E C T I O N
V E R I F I C A T I O N
S H E E T
T I V S
R E V
P A R A
R E Q U I R E M E N T S
C O M P O N E N T
I D E N T I F I C A T I O N
R E S U L T S
A C T I V I T Y
S I G N A T U R E P R I N T E D
N A M E
K T R
V G
R E C E I P T
I N S P E C T I O N
A c c o m p l i s h r e c e i p t i n s p e c t i o n o f t h e m a t e r i a l l i s t e d i n w i t h t h e
S U P E R V I S O R t o e n s u r e m a t e r i a l i s s u i t a b l e a n d a d e q u a t e t o a c c o m p l i s h t h i s w o r k r e q u i r e m e n t
A l l m a t e r i a l s m u s t b e o n h a n d b e f o r e s t a r t i n g w o r k
S A T U N S A T
D a t e T i m e
S R F
K T R
V G V I S U A L
I N S P E C T I O N
A c c o m p l i s h a v i s u a l i n s p e c t i o n o f t h e d o o r l i s t e d i n a n d l o c a t e d i n i n c l u d i n g a s s o c i a t e d f r a m i n g h i n g e a s s e m b l i e s w e d g e s a n d k n i f e e d g e f o r s t r u c t u r a l i n t e g r i t y d e t e r i o r a t i o n c r a c k i n g a r e a s o f w e a r a n d d a m a g e o r d i s t o r t i o n u s i n g t h r o u g h f o r g u i d a n c e
S A T U N S A T
D a t e T i m e
S R F
K T R
S u b m i t o n e l e g i b l e c o p y i n h a r d c o p y o r a p p r o v e d t r a n s f e r a b l e m e d i a o f a r e p o r t l i s t i n g r e s u l t s o f t h e r e q u i r e m e n t s o f t o t h e
S U P E R V I S O R
R e p o r t r e c e i v e d
Y e s N o
D a t e T i m e
S R F
K T R
S u b m i t o n e l e g i b l e c o p y i n h a r d c o p y o r e l e c t r o n i c m e d i a o f a r e p o r t l i s t i n g r e s u l t s o f t h e r e q u i r e m e n t s o f t o t h e
S U P E R V I S O R
R e p o r t r e c e i v e d
Y e s N o
D a t e T i m e
S R F
I P
U S S
M I G U E L
K E I T H
E S B
S S P
S I N G o f
I T E M
N O
W o r k
C o m p l e t e d
S i g n
P r i n t
D a t e
K T R
V G
C H A L K
T E S T
A c c o m p l i s h t h e r e q u i r e m e n t s o f o f f o r a c h a l k t e s t o f e q u i p m e n t i d e n t i f i e d i n l o c a t e d i n u s i n g t h r o u g h a n d f o r g u i d a n c e
A c c e p t a n c e
C r i t e r i a
T h e c h a l k i m p r i n t m u s t b e i n t h e c e n t e r o f t h e w i d t h o f t h e g a s k e t w i t h p e r c e n t c o n t i n u o u s c o n t a c t o f k n i f e e d g e t o g a s k e t
S A T U N S A T
D A T E
S R F
K T R
V
G
W A T E R
H O S E
T E S T
A c c o m p l i s h t h e r e q u i r e m e n t s o f o f f o r a w a t e r h o s e t e s t o f t h e e q u i p m e n t l i s t e d i n a n d l o c a t e d i n u s i n g t h r o u g h t h r o u g h f o r g u i d a n c e
A l l o w a b l e l e a k a g e
N o n e
S A T U N S A T
D a t e T i m e
S R F
K T R
V G
O P E R A T I O N A L
T E S T
A c c o m p l i s h a n o p e r a t i o n a l t e s t o f t h e e q u i p m e n t l i s t e d i n l o c a t e d i n i n a c c o r d a n c e w i t h p a r a g r a p h c o f
A l l o w a b l e b i n d i n g a n d s t i c k i n g
N o n e
S A T U N S A T
D a t e T i m e
S R F
K T R
S u b m i t o n e l e g i b l e c o p y i n h a r d c o p y o r a p p r o v e d t r a n s f e r a b l e m e d i a o f
E n c l o s u r e
O n e t o t h e
S U P E R V I S O R w i t h i n d a y s o f r e p a i r
R e p o r t
R e c e i v e d
Y E S N O
D a t e T i m e
S
I P
U S S
M I G U E L
K E I T H
E S B
S S P
S I N G o f
I T E M
N O
P R O J E C T
M A N A G E
SHIP: USS MIGUEL KEITH (ESB 5) ITEM NO: 167-10-002
COAR: 26 PCN: CG03-0306
CG03-0307
CMP: NONE
PLANNER: MARCOS, FRANK
SRFDS
BAUSER, BRANDON
SSP: SING-005-26 1 of 5 ITEM NO: 167-10-002
1. SCOPE:
1.1 Title: Aviation Magazine (A1-79-2) and Small Arms AMMO Magazine (A1- 78-4) H120 Doors Preservation; accomplish
1.2 Location of Work:
1.2.1 Small Arms Ammo Mag (A1-78-4)
1.2.2 Aviation Magazine (A1-79-2)
1.3 Identification:
1.3.1 Quantity (One EA) Small Arms AMMO Magazine Door (A1-78-4), LH, 2 Dogs, Steel, H120 Door, 60 inches width X 70 inches height, Mat #
1366072LH
1.3.2 Quantity (One EA) Aviation Magazine Door (A1-79-2), RH, 2 Dogs, Steel, H120 Door, 60 inches width X 70 inches height, Mat # 1366072R
2. REFERENCES:
2.1 NAVSEA Standard Items, (FY 26)
2.2 T-ESB-18-016, Replacement of Magazine Doors on A1 Level
2.3 803-7081122, MSC General Technical Requirements
2.4 AMMP, Legacy NACE International / SSPC Standards
2.5 631-8393784 Rev P, Paint Schedule
3. REQUIREMENTS:
(V)(G) "RECEIPT INSPECTION"
3.1 Accomplish receipt inspection of the material listed in 5.1 with the SUPERVISOR to ensure material is suitable and adequate to accomplish this work requirement. All materials must be on hand before starting work.
Document result on enclosure (One).
(V)(G) "VISUAL INSPECTION"
3.2 Accomplish a visual inspection of the door, including associated framing and hardware's for structural integrity, deterioration, cracking, areas of wear, and damage or distortion. Document result on enclosure (One).
3.2.1 Cycle each door twice (open and close) and check for proper seating, binding or erratic operation.
3.2.2 Submit one legible copy, in hard copy or approved transferable media, of a report listing results of the requirements of 3.2 to the SUPERVISOR. Document on Enclosure (One).
3.3 Remove the doors, using 2.2 and 2.3 for guidance. Remove closure classifications and disassemble hinge assemblies. Retain parts for
SSP: SING-005-26 2 of 5 ITEM NO: 167-10-002 reassembly.
3.4 Clean internal and external parts exposed by removals and disassembly free of oil, grease, dirt, loose paint and rust.
3.5 Inspect retained parts for deterioration, damage, wear or no longer serviceable for continued use.
3.5.1 Submit one legible copy, in hard copy or electronic media, of a report listing results of the requirements of 3.5 to the SUPERVISOR. Document on enclosure (one).
3.6 Accomplish the requirements of 009-032 of 2.1, including Table 2, Line One, Columns A, B, C, and G for the door and door frame, using 2.4 and 2.5 for guidance and the materials provided as Government Furnish Material (GFM) in 5.1.
3.6.1 For touch-up, disturbed, and/or inaccessible areas, SSPC-SP 11 is acceptable for areas originally requiring a NACE 2/SSPC-SP 10 or NACE/SSPCSP WJ-2 of 2.4.
3.6.2 Door must be painted to match existing, exterior haze gray and interior soft white.
3.7 Install door removed in 3.3 and preserved in 3.6, located in 1.2, using 2.1 through 2.3 for guidance.
(V)(G) "WATER HOSE TEST"
3.8 Accomplish the requirements of 009-025 of 2.1 for a water hose test, using 2.2 and 2.3 for guidance. Allowable leak: None. Document result on Enclosure (One).
(V)(G) "OPERATIONAL TEST"
3.9 Accomplish an operational test of the door, using 2.2 and 2.3 as guidance. Allowable binding and sticking: None. Document result on Enclosure (One).
3.9.1 Cycle each door twice (open and close) and check for binding or erratic operation. Allowable binding or erratic operation: None.
3.10 Accomplish the requirements of 009-032 of 2.1 for each new and disturbed surface.
3.11 Submit one legible copy, in hard copy or approved transferable media, of Enclosure (One) to the SUPERVISOR within 3 days of repair.
Document on Enclosure (One)
4. NOTES:
4.1 NAVSEA Standard Items are available at:
https://www.navsea.navy.mil/Home/RMC/CNRMC/Our-Programs/SSRAC/
4.2 Enclosure (One) - Test and Inspection Verification Sheet
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
TOTAL
QUANTITY
PROVIDED NAME Of PART
PIECE
NO.
REF
NO.
NATIONAL
STOCK
NO.
REQ
PARA NO.
1. 2 KT
Red Primer, MILPRF- 23236, None 2.1
8010-01- 598-3541 3.6
SSP: SING-005-26 3 of 5 ITEM NO: 167-10-002
Type V Or VI, Class 5 or 7
2. 2 KT
Soft White, MIL PRF-23236, Type V Or VI, Class 5 or 7 None 2.1
8010-01- 598-4110 3.6
3. 2 KT
Haze Gray, MILPRF- 24635, Type V or VI, Class 2 Grade B or C None 2.1
8010-01- 382-1864 3.6
5.2 PUSH MATERIAL:
1. None.
I P
U S S
M I G U E L
K E I T H
E S B
S S P
S I N G o f
I T E M
N O
E N C L O S U R E
O n e
T E S T
A N D
I N S P E C T I O N
V E R I F I C A T I O N
S H E E T
T I V S
R E V
P A R A
R E Q U I R E M E N T S
C O M P O N E N T
I D E N T I F I C A T I O N
R E S U L T S
A C T I V I T Y
S I G N A T U R E P R I N T E D
N A M E
K T R
V G
R E C E I P T
I N S P E C T I O N
A c c o m p l i s h r e c e i p t i n s p e c t i o n o f t h e m a t e r i a l l i s t e d i n w i t h t h e
S U P E R V I S O R t o e n s u r e m a t e r i a l i s s u i t a b l e a n d a d e q u a t e t o a c c o m p l i s h t h i s w o r k r e q u i r e m e n t
A l l m a t e r i a l s m u s t b e o n h a n d b e f o r e s t a r t i n g w o r k
S A T U N S A T
D a t e T i m e
S R F
K T R
V G V I S U A L
I N S P E C T I O N
A c c o m p l i s h a v i s u a l i n s p e c t i o n o f t h e d o o r l i s t e d i n a n d l o c a t e d i n i n c l u d i n g a s s o c i a t e d f r a m i n g h i n g e a s s e m b l i e s w e d g e s a n d k n i f e e d g e f o r s t r u c t u r a l i n t e g r i t y d e t e r i o r a t i o n c r a c k i n g a r e a s o f w e a r a n d d a m a g e o r d i s t o r t i o n u s i n g t h r o u g h f o r g u i d a n c e
S A T U N S A T
D a t e T i m e
S R F
K T R
S u b m i t o n e l e g i b l e c o p y i n h a r d c o p y o r a p p r o v e d t r a n s f e r a b l e m e d i a o f a r e p o r t l i s t i n g r e s u l t s o f t h e r e q u i r e m e n t s o f t o t h e
S U P E R V I S O R
R e p o r t r e c e i v e d
Y e s N o
D a t e T i m e
S R F
K T R
S u b m i t o n e l e g i b l e c o p y i n h a r d c o p y o r e l e c t r o n i c m e d i a o f a r e p o r t l i s t i n g r e s u l t s o f t h e r e q u i r e m e n t s o f t o t h e
S U P E R V I S O R
R e p o r t r e c e i v e d
Y e s N o
D a t e T i m e
S
I P
U S S
M I G U E L
K E I T H
E S B
S S P
S I N G o f
I T E M
N O
W o r k
C o m p l e t e d
S i g n
P r i n t
D a t e
P R O J E C T
M A N A G E R
K T R
V
G
W A T E R
H O S E
T E S T
A c c o m p l i s h t h e r e q u i r e m e n t s o f o f f o r a w a t e r h o s e t e s t u s i n g t h r o u g h f o r g u i d a n c e
A l l o w a b l e l e a k
N o n e
S A T U N S A T
D a t e T i m e
S R F
K T R
V G
O P E R A T I O N A L
T E S T
A c c o m p l i s h a n o p e r a t i o n a l t e s t o f t h e d o o r u s i n g t h r o u g h a s g u i d a n c e
A l l o w a b l e b i n d i n g a n d s t i c k i n g
N o n e
S A T U N S A T
D a t e T i m e
S R F
K T R
S u b m i t o n e l e g i b l e c o p y i n h a r d c o p y o r a p p r o v e d t r a n s f e r a b l e m e d i a o f
E n c l o s u r e
O n e t o t h e
S U P E R V I S O R w i t h i n d a y s o f r e p a i r
R e p o r t
R e c e i v e d
Y E S N O
D a t e T i m e
S
SHIP: USS MIGUEL KEITH (ESB 5) ITEM NO: 167-11-001
COAR: 26 PCN: ER04-0076
LWT FILE NO: 167-004 CMP: NONE
REVISED: 06 OCT 2025 PLANNER: LUMANG, RICKY
BAUSER, BRANDON
SSP: SING-005-26 1 of 10 ITEM NO: 167-11-001
1. SCOPE:
1.1 Title: Quick Acting Watertight Door (A1-90-2); repair and preserve
1.2 Location of Work:
1.2.1 Passage Way (A1-90-2)
1.3 Identification:
1.3.1 Quantity (One EA) Door, Watertight Quick Acting (A1-90-2), 8 Dogs, Size 30 Inch by 66 Inch, Material: Steel, Proof Test and Tightness Press 5 PSI, MFR: Juniper Industries INC, Component ID NO.
JE-289278-001, APL 312090035, Sheet 15 of 2.3.
2. REFERENCES:
2.1 NAVSEA Standard Items, (FY 26)
2.2 S9086-UF-STM-010/CH-600 Rev 5, Structural Closures
2.3 803-6397268 Rev B, Doors Watertight, Quick Acting Arrangement
2.4 624-8538732 Rev L, Steel Door List
2.5 AMMP, Legacy NACE International / SSPC Standards
2.6 631-8393784 Rev P, Paint Schedule
2.7 MIL-STD-1689 Rev A, Fabrication, Welding, and Inspection of Ships Structure
2.8 605-2540769 Rev D, Label Plate Standards
3. REQUIREMENTS:
3.1 As required by 2.1, the Contractor must submit legible copies in English of the documents listed below to the NAVSUP FLC (Contracting) Singapore for review and acceptance prior to commencing of work. Document in Enclosure (One). See Note 4.2.
3.1.1 Welding:
3.1.1.1 Submit WPS intended for use.
3.1.1.2 Submit PQR with NDT records supporting PQR.
3.1.1.3 Submit Filler Metal control procedure.
3.1.2 Welder:
3.1.2.1 Submit welder performance qualification to the proposed
WPS.
3.1.2.2 Submit record of eye exam.
3.1.2.3 Submit evidence of qualification updates within last 6 months.
3.1.3 NDT process:
3.1.3.1 Submit applicable NDT procedure(s).
SSP: SING-005-26 2 of 10 ITEM NO: 167-11-001
3.1.3.2 Submit NDT written practice.
3.1.4 NDT personnel:
3.1.4.1 Submit NDT Level II inspector certification(s).
3.1.4.2 Submit NDT Level III certification supporting NDT
procedure approval.
3.1.5 Welding Details:
3.1.5.1 Base Material 1: Carbon Steel (S-1), 0.075" thickness
3.1.5.2 Base Material 2: Aluminum Bronze (S-35), 5/16" thickness
3.1.5.3 Joint Design: PT1S.1, fillet size: 0.180 inches
3.1.5.4 Welding Position: Flat
3.1.5.5 Process: SMAW or GTAW
3.1.5.6 Fabrication Classification: MIL-STD-1689
(V)(G) "RESTRICTION BRIEFING BRIEF"
3.2 Contractor must attend a briefing on WPS restriction sheets as directed by the SUPERVISOR and must have in their possession copies of the restriction sheets for use at the job site. Document results in Enclosure (One).
(V)(G) "VISUAL INSPECTION"
3.3 Accomplish a visual inspection of each door assembly listed in 1.3 and located in 1.2, including associated framing, hinge assemblies, wedges and knife edge for structural integrity, deterioration, cracking, areas of wear, and damage or distortion using paragraph 600-2.2.2.2.1 of
2.2 and 2.3 for guidance. Document result in enclosure (one).
3.3.1 Cycle each door twice (open and close) and check for proper seating, binding or erratic operation.
3.3.2 Submit one legible copy, in hard copy or approved transferable media, of a report listing results of the requirements of 3.3 to the SUPERVISOR. Document in enclosure (one)
3.4 Remove watertight door from location listed in 1.2. Remove closure classifications and disassemble hinge assemblies and dogging assemblies using 2.2 for guidance. Retain parts for reassembly.
3.5 Clean internal and external parts exposed by removals and disassembly free of oil, grease, dirt, loose paint and rust.
3.6 Inspect retained parts for deterioration, damage, wear or no longer serviceable for continued use.
3.6.1 Submit one legible copy, in hard copy or electronic media, of a report listing results of the requirements of 3.6 to the SUPERVISOR. Document in enclosure (one).
3.7 Accomplish the requirements of 009-012 of 2.1, including Table 2, Columns F, Lines One through 6 for installation of new door wedges in accordance with paragraph 600-2.2.3.8.1 of 2.2.
3.7.1 Remove the door hinge pins, washers, and gasket. Place the door in a flat position.
SSP: SING-005-26 3 of 10 ITEM NO: 167-11-001
3.7.2 Remove the damaged wedge with a portable grinder.
3.7.3 Position the new wedge exactly over the position of the old wedge.
3.7.4 Weld the new wedge in place using the GTAW (tungsten inert gas (TIG)) or shielded metal arc welding (SMAW) process. Filler material must conform to MIL-E-278, aluminum bronze, MIL-E-CU/AL-A, for SMAW welding or MIL-E-23765/3, aluminum bronze, CUAL-A2, for gas tungsten arc welding (GTAW).
(I)(G) "NON-DESTRUCTIVE TESTING (VT)"
3.7.5 Accomplish the requirements of 009-012 of 2.1 Table 2, Column F, Line 7. The accept or reject criteria must be in accordance with Para. 8.2 of 2.7. Document result in Enclosure (One).
3.7.5.1 Submit one legible copy, in approved transferable media of a report listing results of the requirements of 3.7.5 to the SUPERVISOR. Document in enclosure (one).
(I)(G) "NON-DESTRUCTIVE TESTING (PT)"
3.7.6 Accomplish the requirements of 009-012 of 2.1 Table 2, Column F, Line 10. The accept or reject criteria must be in accordance with Para. 8.6 of 2.7. Document result in Enclosure (One).
3.7.6.1 Submit one legible copy, in approved transferable media of a report listing results of the requirements of 3.7.6 to the SUPERVISOR. Document in enclosure (one).
3.8 Accomplish the requirements of 009-032 of 2.1, including Table 2, Line 41, Columns A, and B for the door using 2.5 and 2.6 for guidance.
(V)(G) "VISUAL INSPECTION"
3.8.1 Accomplish a visual inspection of cleaned surfaces for
structural integrity, deterioration, cracks, holes, dents gouges and areas of damage or distortion. Document result in Enclosure (One).
3.8.1.1 Submit one legible copy, in approved transferable media of a report listing results of the requirements of 3.8.1 to the SUPERVISOR. Document in enclosure (one).
3.8.2 Procure and apply MIL-PRF23236, TYPE VIIIA by fluidized bed method only, 10 mils minimum.
3.8.3 Door must be painted as follows: exterior haze gray and interior soft white.
3.9 Accomplish the requirements of 009-032 of 2.1, including Table 2, Line One, Columns A, B, C, and G for the door frame using 2.5 and 2.6 for guidance.
3.9.1 For touch-up, disturbed, and/or inaccessible areas, SSPC-SP 11 is acceptable for areas originally requiring a NACE 2/SSPC-SP 10 or
NACE/SSPCSP WJ-2 of 2.5.
3.10 Install each door assembly preserved in 3.9 to the location listed in 1.2 with the material in 5.1 using 2.2 for guidance.
3.10.1 Adjust all dogs on individually dogged doors for proper operation and to obtain 100 percent centered contact of knife edge to
SSP: SING-005-26 4 of 10 ITEM NO: 167-11-001 gasket.
3.10.2 Lubricate exposed working parts using general purpose grease conforming to MIL-PRF-24139.
(V)(G) "CHALK TEST"
3.11 Accomplish the requirements of 009-025 of 2.1 for a chalk test of each door. Acceptance Criteria: The chalk imprint must be in the center 3/5 of the width of the gasket with 100 percent continuous contact of knife edge to gasket. Document result in enclosure (one).
(V)(G) "WATER HOSE TEST"
3.12 Accomplish the requirements of 009-025 of 2.1 for a water hose test of each door. Allowable leakage: None. Document result in Enclosure (One).
(V)(G) "OPERATIONAL TEST"
3.13 Accomplish an operational test of each door, closed to open to closed for four complete cycles. Allowable sticking or binding: None.
Document on Enclosure (One).
3.13.1 Submit one legible copy, in approved transferable media of a report listing results of the requirements of 3.13, to the SUPERVISOR. Document results in enclosure (one).
3.14 Accomplish the requirements of 009-032 of 2.1 for each new and disturbed surface.
3.15 Install each new closure classification label plate in accordance with 2.8.
3.16 Submit one legible copy, in hard copy or approved transferable media, of Enclosure (One) to the SUPERVISOR within 3 days of repair.
Document in eenclosure (one).
4. NOTES:
4.1 NAVSEA Standard Items are available at:
https://www.navsea.navy.mil/Home/RMC/CNRMC/Our-Programs/SSRAC/
4.2 Enclosure (One) - Test and Inspection Verification Sheet
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
TOTAL
QUANTITY
PROVIDED NAME Of PART
PIECE
NO.
REF
NO.
NATIONAL
STOCK
NO.
REQ
PARA NO.
1. 20 FT Rubber Strip 31 2.3 5330-01- 371-7183 3.10
2. 1 GL
PPG Amercoat 240
- Oxide Red None 2.6
MIL-PRF
23236- V11-5-C 3.9
3. 1 GL
PPG Amercoat 240 Soft White None 2.5
MIL-PRF-
23236- V11-5-C 3.9
4. 1 GL
PPG PSX-700SG -
Haze Gray None 2.5
MIL-PRF-
24635 V- 2-B-2 3.8
SSP: SING-005-26 5 of 10 ITEM NO: 167-11-001
5. 8 EA Dog Wedge, LH N/A 2.2 2040-01- 435-8933 3.7.3
6. 8 EA Setscrew N/A 5305-01- 369-0768 3.10
7. 8 KT
Parts Kit, Bearing Replacement, Mechanical Equipment 200 2.3
3120-01- 263-0392 3.10
8. 1 KT
Parts Kit, Bearing Replacement Mechanical Equipment 201 2.3
3120-01- 412-8087 3.10
9. 1 EA Pin, Cotter 5315-00- 234-1630 3.10
10. 8 EA
Nut, Self- Locking N/A
5310-01- 369-8655 3.10
11. 16 EA Washer, Flat 118 2.3 5310-01- 244-4517 3.10
12. 20 EA Pin, Cotter 119 2.3 5315-00- 187-9448 3.10
13. 8 EA Screw, Machine N/A 5305-00- 059-8247 3.10
14. 2 EA Screw, Machine N/A 5305-00- 059-3658 3.10
15. 9 EA
Nut, Self- Locking N/A
5310-01- 413-0481 3.10
5.2 PUSH MATERIAL:
1. None.
I P
U S S
M I G U E L
K E I T H
E S B
S S P
S I N G o f
I T E M
N O
E n c l o s u r e
O n e
T E S T
A N D
I N S P E C T I O N
V E R I F I C A T I O N
S H E E T
T I V S
P A R A G R A P H
R E Q U I R E M E N T C O M P O N E N T
I D E N T I F I C A T I O N
R E S U L T S
A C T I V I T Y
S I G N A T U R E P R I N T E D
N A M E
K T R
S u b m i t
W P S i n t e n d e d f o r u s e
R E P O R T
S U B M I T T E D
Y E S N O
D A T E T I M E
S R F
K T R
S u b m i t
P Q R w i t h
N D T r e c o r d s s u p p o r t i n g
P Q R
R E P O R T
S U B M I T T E D
Y E S N O
D A T E T I M E
S R F
K T R
S u b m i t
F i l l e r
M e t a l c o n t r o l p r o c e d u r e
R E P O R T
S U B M I T T E D
Y E S N O
D A T E T I M E
S R F
K T R
S u b m i t w e l d e r p e r f o r m a n c e q u a l i f i c a t i o n t o t h e p r o p o s e d
W P S
R E P O R T
S U B M I T T E D
Y E S N O
D A T E T I M E
S R F
K T R
S u b m i t r e c o r d o f e y e e x a m
R E P O R T
S U B M I T T E D
Y E S N O
D A T E T I M E
S R F
K T R
S u b m i t e v i d e n c e o f q u a l i f i c a t i o n u p d a t e s w i t h i n l a s t m o n t h s
R E P O R T
S U B M I T T E D
Y E S N O
D A T E T I M E
S
I P
U S S
M I G U E L
K E I T H
E S B
S S P
S I N G o f
I T E M
N O
K T R
S u b m i t a p p l i c a b l e
N D T p r o c e d u r e s
R E P O R T
S U B M I T T E D
Y E S N O
D A T E T I M E
S R F
K T…