This is Amendment 0014 to a U.S. Navy solicitation for propeller and stern tube shaft sleeve installation services. The amendment was issued on 18 November 2026 by NAVSUP Fleet Logistics Center Yokosuka (N62649) and provides clarifications through a questions and answers format addressing offeror inquiries about the work scope and requirements.
The original solicitation (N6264926RA037, dated 08 April 2026) pertains to installing sleeves on propeller and stern tube shafts, with a period of performance of 126 days. The amendment clarifies that offerors may inspect the shaft prior to shipping while it remains installed on the ship; the contractor (identified as SRF) will remove and reinstall the shaft. Regarding government-furnished material, the Government will provide new sleeves, the existing shaft, and shipping boxes for shaft movement. The amendment confirms that Government Furnished Material is not listed as "None" but rather will be supplied as specified. The amendment also indicates that further extension of the proposal submission deadline may be acceptable if the estimated award date remains unchanged. The contracting officer is Ai Gillard, and offerors must acknowledge receipt of this amendment prior to the deadline specified in the original solicitation. All other terms and conditions remain unchanged.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Block 14 (Description of Amendment/Modification):
The purpose of this solicitation amendment 0014 is to provide questions and answers.
Q1. Ship check opportunity:
Would you be able to provide us with an opportunity to conduct a ship check? Our engineering experts would like to assess the current condition of the ship in order to determine the exact duration and procedures required, so that we can prepare an accurate and efficient estimate.
A1. You may inspect the shaft prior to shipping. Currently, the shaft is installed on the ship and has not been removed. Do you mean assess the current condition of the shaft? SRF will remove the shaft from the ship and reinstall the shaft to the ship.
Q2. Docking period:
The period of performance (POP) is stated as 126 days. How long do you consider the actual docking period to be? If a ship check is arranged, we will be able to estimate this ourselves. If it is not possible, we would appreciate it if you could let us know your expected docking period.
A2. Please clarify the purpose of knowing the docking period. The purpose of the TGI is to install sleeves of propeller and stern tube shaft. SRF will remove the shaft from the ship and reinstall the shaft to the ship.
Q3.Government Furnished Material (GFM):
According to TGI 3819P24302A01_c0v0, GFM is listed as "None."
However, from the context of the work, it appears that the sleeves and shafts will be provided by the Government. Could you please clarify this matter? Alternatively, could you provide all of the appendices, including the TGI material list?
A3. The government will provide the new sleeves and the existing shaft as well as the shipping boxes to support movement of the shaft.
Q4. Deadline extension:
Would you be willing to extend the proposal submission deadline? This would allow us to reflect the results of the ship check and your answers in a thorough and accurate proposal.
A4. Further extension may be acceptable if the estimated award date does not change.
All other information remains unchanged.
N6264926RA0370014
| IDCode: J |
| Page: 1 |
| Pages: 2 |
| AmendNo: 0014 |
| EffDate: 18 Nov 2026 |
| ReqNo: See Continuation Sheet |
| ProjNo: |
| IssCode: N62649 |
| AdmCode: |
| IssuedBy: NAVSUP FLT LOG CTR YOKOSUKA |
PSC 473 BOX 11, FPO AP 96349-1500
FPO, AP 96349-1500
UNITED STATES
Kumi Matsumoto, Email: kumi.matsumoto.ln@us.navy.mil Telephone: 816-243-6804 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: N6264926RA037 |
| SolDate: 08 Apr 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| CoNameTitle: Ai Gillard |
| ContDate: |
| CODate: 18 Nov 2026 |
File details come from the government source that posted it. Updated .