Amend 0010 26RA037.pdf
PDF 517 KB Posted
- Solicitation number
- N6264926RA037
About this file
This is a Standard Form 30 Amendment of Solicitation issued by NAVSUP Fleet Logistics Center Yokosuka on November 5, 2026, amending solicitation N6264926RA037 originally dated April 8, 2026. The amendment reopens the solicitation until November 20, 2026 at 10:00 AM, extending the original response due date of October 5, 2026. The document provides clarifications through four question-and-answer pairs addressing contractor concerns regarding work location requirements, logistics responsibilities, shaft specifications, and payment currency.
The amendment confirms that all technical work must be performed off-site at the contractor's facility rather than on-site at CFAY Yokosuka, with the Government assuming responsibility for shaft removal, crating, and initial shipment to the contractor's facility in Korea. The contractor remains responsible for return shipment to SRF (Shipyard Repair Facility). Shaft dimensions and weights are referenced in the Technical General Information document at sections 1.3.1, 1.3.1.1, 1.3.2, 1.3.2.1, and 1.3.2.2, and shipping cradle dimensions are detailed in Engineering Liaison Memorandum LCC19-203-260136. The Government may execute contract award in the contractor's local currency. All other terms and conditions of the original solicitation remain unchanged. Contractor acknowledgment of amendment receipt is required prior to the offer deadline using one of the three methods specified in Item 11.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Block 14 (Description of Amendment/Modification): The purpose of this solicitation amendment 0010 is as follows:
1. To reopen the solicitation until 20 Nov 2026 at 10:00 AM.
2. To provide 3819P24302-A01 DL001 and Engineering Liaison Memorandum (ELM) - 260136.
3. To provide questions and answers.
1. On-Site Yokosuka Requirements:
Question: Is there any portion of the technical work package that the contractor would be absolutely required to perform on-site at CFAY Yokosuka?
Or can the physical labor on the vessel be completely isolated?
Answer: The subject requirement is to be accomplished off-ship / off-yard at the contractor's facility. Historically, KTR would have been required to come to SRF to pack the shaft. However, this requirement based on DL-001, that tasking has been transferred to SRF (the Government) (see attached
DL-001).
2. Scope of Work & Logistics (Who is shipping what?):
Question: Will the Government responsible for unbolting, removing, packing, and shipping the propulsion shaft directly to the KTR's facility in Korea as Government Furnished Property (GFP)? Or is the expectation that the KTR must travel to Yokosuka, remove the shaft, crate it in the SRF-fabricated containers, and manage the international export/shipping themselves?
Answer: The Government will handle the shipping to and the KTR would be required to ship back. DL-001 was issued to transfer the tasking for fabrication of the shipping cradle and packing of the shaft to SRF versus the contractor (see attached DL-001). The KTR would still be responsible for sending it back to SRF (The Government).
3. Shaft Dimensions & Transit Mode:
Question. Shaft Dimensions & Transit Mode: To help our logistics team evaluate shipping constraints, please provide the exact dimensions and weight of the propulsion shaft. Can this asset be transported via military/commercial air, or does its size restrict it strictly to sealift?
Answer: Weights and lengths of shafts are per TGI are listed in Identification 1.3.1, 1.3.1.1, 1.3.2, 1.3.2.1, and 1.3.2.2. Dimensions for shipping cradle are in attached ELM (LCC19-203-260136). I will defer to the rest of the team regarding shipping types.
4. Currency of Award:
Question: Can the Government execute the contract award in the contractor's local currency?
Answer: The Government may award the contract in the contractor's local currency .
All other information remains unchanged.
Section A - Solicitation/Contract Form
The following changes have been made:
INFORMATION FROM TO
Response Due Date 05 Oct 2026 20 Nov 2026
N6264926RA0370010
| IDCode: J |
| Page: 1 |
| Pages: 2 |
| AmendNo: 0010 |
| EffDate: 05 Nov 2026 |
| ReqNo: See Continuation Sheet |
| ProjNo: |
| IssCode: N62649 |
| AdmCode: |
| IssuedBy: NAVSUP FLT LOG CTR YOKOSUKA |
PSC 473 BOX 11, FPO AP 96349-1500
FPO, AP 96349-1500
UNITED STATES
Kumi Matsumoto, Email: kumi.matsumoto.ln@us.navy.mil Telephone: 816-243-6804 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: N6264926RA037 |
| SolDate: 08 Apr 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| CoNameTitle: Ai Gillard |
| ContDate: |
| CODate: 05 Nov 2026 |