2.02 Attachment II Price Proposal Form N6264926RA037.xlsx

XLSX spreadsheet 41 KB Posted

Attached to
USS BLUE RIDGE (LCC-19) TGI 3819P24302-A01, Yokosuka Japan
Solicitation number
N6264926RA037
Issued by

About this file

This is a Price Proposal Form for a U.S. Navy repair and maintenance solicitation for USS BLUE RIDGE (LCC-19) at Naval Base Yokosuka, Japan. The solicitation number is N6264926RA037, issued by NAVSUP Fleet Logistics Center Yokosuka. The primary task group instruction (TGI 3819P24302-A01) involves the installation of a new sleeve for the propeller and stern tube shaft, with a period of performance from July 21, 2026 through March 1, 2027. The work will be performed at Commander, Fleet Activities Yokosuka (CFAY) Naval Base.

The proposal form is designed for offerors to input labor costs, material costs, and other direct costs (ODCs) in Japanese Yen, with separate line items for in-house labor (measured in man-hours) and sub-contractor labor. The form includes a summary section and a detailed breakdown section where offerors must populate orange-highlighted cells with labor hour estimates by work category (structural, installation, welding, small tools, repairs, painting, electrical, platform fitting, quality assurance, and others), personnel requirements, daily hours, and cost-per-man-hour rates. Proposals must be submitted no later than April 23, 2026 at 10:00 AM Japan Standard Time. Reference documents will be provided through DoD Safe, with requests directed to Kumi Matsumoto or Miwa Takahashi at the Navy's Yokosuka contact email. This solicitation is limited to sources duly authorized to operate and conduct business in Japan per DFARS 225.1103(3).

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

OFFEROR/COMPANY NAME:

TABSUMMARYSUMMARYCLINTotal Labor (MH)Labor CostMaterial CostODC CostProposed Price
SOLICITATION NO:N6264926RA037CLIN 0001(1 TGIs)0¥0¥0¥0¥0
SHIP NAME:USS BLUE RIDGE (LCC-19)CLIN 0002 (Growth CLIN)0¥0¥0¥0¥0
AVAILABILITY:TGI 3819P24302-A01Total for All CLIN0¥0¥0¥0¥0
Total TGIs (Specify Total)1Total Evaluated Price¥0
Growth CLIN %21.00%
Note to Offerors: The values in this Summary table is linked to the corresponding data from Tabs for each TGI listed, manual input is not necessary.
No.TGI No.DESCRIPTIONProposed LaborMaterial/ODCsProposed Price (JPY)
In-House Labor (MH)Sub-Contractor Labor (MH)Total Labor (MH)Overall Total Labor Cost (JPY)Material Cost (JPY)ODC (JPY)
13819P24302-A01F/O – INSTALL NEW SLEEVE OF PROPELLER AND STERN TUBE SHAFT000¥0¥0¥0¥0
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200

1_3819P24302-A01

SHIP NAME/AVAILABILITY:USS BLUE RIDGE (LCC-19) - TGI 3819P24302-A01TGI 1_3819P24302-A01 SUMMARY
SOLICITATION #:N6264926RA037
SRF-JRMC TGI #:1_3819P24302-A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O – INSTALL NEW SLEEVE OF PROPELLER AND STERN TUBE SHAFT00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

File details come from the government source that posted it. Updated .