MIL 6J1 SIA POP list_Rev.04_signed.pdf
PDF 180 KB Posted
- Solicitation number
- N6264926RA035
About this file
This document is a Period of Performance (POP) list for a 6J1 SIA (Ship's Intermediate Availability) contract running from May 25, 2026 to August 13, 2026. The contract encompasses 20 Task Group Items (TGIs) plus 9 Training TGIs under the Ship Repair Facility Japan Regional Maintenance Center (SRF JRMC), contract C1209.3, with S. Hamanaka listed as the contracting officer.
The contract tasks cover a range of ship maintenance and repair services for naval vessels, including: replacement of vessel sanitary system piping in multiple compartments; installation and removal of scaffolding for structural repair work; preservation of structural members, shell plating, and deck plating; chemical cleaning of vessel piping systems; replacement of fuel oil piping; and provision of support services such as crane services, temporary utility service, and air integrity testing support. Work is distributed across multiple compartments and locations on the vessel, with individual task end dates ranging from July 20, 2026 to August 13, 2026. Training and operational support tasks (T-TGIs) are assigned to various sewage, fuel transfer, lube oil, and drainage systems. Multiple personnel are designated as points of contact for specific work items, with task assignments organized by catalog numbers, item control numbers (ICNs), and job control numbers (JCNs). The document was digitally signed on April 8, 2026.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
[ 6J1 POP list ]
6J1 SIA contract POP date: From 5/25/2026 to 8/13/2026
( MIL 6J1 SIA:
CAT ICN KO JCNs TGI (CU phase) title:
POP START
DATE
POP END
DATE REMARKS
1 1 38KA2 12307 A01 ER013212 *F/O - REPLACE VCHT PIPING IN 3-97-02-L 5/26/2026 7/20/2026 C234 Kawashima
1 1 38KA2 12307 T01 ER013212 SEWAGE SYS (T & OP) - KTR 5/26/2026 7/20/2026 C246.2 Konno
1 2 38KA2 12309 A02 EM014903 *F/O - INSTALL AND REMOVE SCAFFOLDING TO/FROM 02-186-0-Q FOR SRF-JRMC WORK 5/26/2026 7/20/2026 C231B Takeishi
1 3 38KA2 12310 A02 EM025359 *F/O - INSTALL AND REMOVE SCAFFOLDING TO/FROM 02-242-0-Q FOR SRF-JRMC WORK 5/26/2026 7/20/2026 C231B Takeishi
1 4 38KA2 12311 A01 ER013248 *F/O - REPLACE FWD VCHT DISCHARGE PIPING IN 4-110-0-E 5/26/2026 7/20/2026 C234 Saeki
1 4 38KA2 12311 T01 ER013248 SEWAGE SYS (T & OP) - KTR 5/26/2026 7/20/2026 C246.2 Tamahashi
1 5 38KA2 12314 A01 ES01NPMU *F/O - PRESERVE STRUCTURAL MEMBER IN 4-110-1-L 5/26/2026 8/13/2026 C231B Nakano
1 6 38KA2 12316 A01 ES01NPKP *F/O - PRESERVE SHELL PLATING AND DECK PLATING IN 4-442-0-E 5/26/2026 8/13/2026 C231B 884
1 7 38KA2 12317 A01 ES01NPL1 *F/O - PRESERVE BILGE AND STRINGER IN VCHT ROOM NO. ONE 5/26/2026 8/13/2026 C231B Kurokawa
1 8 38KA2 13605 A01 ES01NPMC *F/O - INSTL & RMV SCAFFOLDING TO/FROM REPAIR WORK AREA OF SCUPPER MOUNT 5/26/2026 8/13/2026 C231B Tanaka
1 9 38KA2 15001 A01 ES01L157 *F/O - PSV BHD PLTG & HIGH HAT, FR 370 - 395, MAIN DECK & 01LVL WEA, PORT & STBD 5/26/2026 7/20/2026 C231B Haga
1 10 38KA2 45601 A01 CF01ZA66, CF01ZA67, CF01ZA68, CF01ZA69F/O - PROVIDE AIT SUPPORT WORK FOR RESERFACE AS-3851/SPY-1D ANT ARRAY 5/26/2026 7/20/2026 C231B Kurokawa
1 11 38KA2 51406 A02 EA016203 *F/O - INSTL & RMV SCAFFOLDING TO/FROM AUX NO. 2 & MAIN DECK FR 222 - 228, PORT 5/26/2026 7/20/2026 C231B Tsuruoka
1 12 38KA2 52301 A01 ER044671 *F/O - INSTL & RMV SCAFFOLDING TO/FROM 01 LVL FR 142-150 STBD FOR SRF-JRMC WORK 5/26/2026 7/20/2026 C231B Yoshida
1 13 38KA2 59301 A01 ER01ZAK5 *F/O - ACCOMPLISH CHEMICAL CLEANING OF VCHT PIPING THROUGHOUT THE SHIP 5/26/2026 7/20/2026 C234 Oonishi
1 13 38KA2 59301 T01 ER01ZAK5 SEWAGE SYS (T & OP), CHEM FLUSH - KTR 5/26/2026 7/20/2026 C246.2 Konno
1 14 38KA2 64301 A01 ER013229, EX010390*F/O - REPLACE AFT VCHT PIPING IN 3-310-2-L AND 3-319-0-Q 5/26/2026 7/20/2026 C234 Kawashima
1 14 38KA2 64301 T01 ER013229, EX010390SEWAGE SYS (T & OP) - KTR 5/26/2026 7/20/2026 C246.2 Nakaya
1 15 38KA2 64402 A01 ER013227 *F/O - REPLACE VCHT PIPING IN 3-338-6-L 5/26/2026 7/20/2026 C234 Iwai
1 15 38KA2 64402 T01 ER013227 SEWAGE SYS (T & OP) - KTR 5/26/2026 7/20/2026 C246.2 Nakaya
1 16 38KA2 65401 A01 OI011937 *F/O - REPLACE VCHT PIPING IN 1-126-0-C 5/26/2026 7/20/2026 C234 Oonishi
1 16 38KA2 65401 T01 OI011937 SEWAGE SYS (T & OP) - KTR 5/26/2026 7/20/2026 C246.2 Konno
1 17 38KA2 86303 A01 EXSYL014 F/O - PROVIDE KTR SERVICE WORK FOR TEMPORARY UTILITY SERVICE 5/26/2026 7/20/2026 C231B Kurokawa
1 18 38KA2 86501 A01 ES01L016 *F/O - INSTALL AND REMOVE SCAFFOLDING TO/FROM VARIOUS LOCATION FOR S/F WORK 5/25/2026 8/12/2026 C231B Takeishi
1 19 38KA2 86502 A01 EXSYL013 F/O - PROVIDE FY-26 SIA CRANE, CRANE RGNG, AND RGNG SVCE FOR SHIP’S FORCE WORK 5/26/2026 7/25/2026 C231B Takeishi
1 20 38KAA 54109 A01 EB14L022 *(C3) F/O - ACCOMPLISH REPLACEMENT OF FUEL OIL PIPING IN 4-174-0-E 5/26/2026 7/31/2026 C234 Shinmei
1 20 38KAA 54109 T01 EB14L022 FUEL TRANSFER SYS (T & OP) - KTR 5/26/2026 7/31/2026 C246.2 Y. Sato
1 20 38KAA 54109 T02 EB14L022 LUBE OIL FILL, TRANSFER, & PURIFICATION SYS (T & OP) - KTR 5/26/2026 7/31/2026 C246.2 Y. Sato
1 20 38KAA 54109 T03 EB14L022 MAIN AND SECONDARY DRAINAGE SYS (T & OP) - AT SEA - KTR 5/26/2026 7/31/2026 C246.2 Y. Sato
(20) TGIs + (9) T-TGIs
SRF JRMC C1209.3 JN BA S. Hamanaka
From 26 May 2026 to 17 Aug 2026 )
| 2026-04-08T16:04:17+0900 | |
| HAMANAKA.SHINICHIRO.1276262552 |
File details come from the government source that posted it. Updated .