CVA_Structure_11928-87_53711_-_0001_ -_-_0001.pdf

PDF 493 KB Posted

Attached to
Solicitation, Barge (CVA-8) FY26 Overhaul, PRO 20260001883, CFAY
Solicitation number
N6264926RA029
Issued by

About this file

Summary of OPS CV Camel Hull Structure Technical Drawing

This document is a comprehensive technical drawing and Bill of Materials (BOM) for the OPS CV Camel Hull Structure, detailing the structural components and fabrication specifications for a naval vessel. The drawing provides detailed material lists, dimensional specifications, and construction requirements across multiple sheets with sectional views, plan views, and elevation views that illustrate the complete hull assembly.

The material list specifies components including plates (10.2" and 8.5"), angles, channels, flat bars, brackets, and various fastening hardware with quantities and specification standards. Key structural elements include deck plates, side shells, bottom shells, transverse members, and longitudinal stiffening members, with notations regarding welding requirements, paint specifications, and dimensional tolerances. The drawing indicates compliance with specific standards such as MIL-S-22696 and includes references to a paint system table specifying primer and topcoat requirements for various locations (Upper Works, Free Board, Deck, and Interior). Fabrication notes address requirements for shell plating, welded lines, construction clips, pressure testing of watertight tanks, and welding procedures consistent with applicable specifications. The document serves as the authoritative technical specification for contract fabrication and assembly of the hull structure.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .