Attachment II Price Proposal Form N6264926RA029.xlsx

XLSX spreadsheet 45 KB Posted

Attached to
Solicitation, Barge (CVA-8) FY26 Overhaul, PRO 20260001883, CFAY
Solicitation number
N6264926RA029
Issued by

About this file

This is a price proposal form template for the Barge (CVA-8) FY26 Overhaul solicitation (N6264926RA029). The form is designed to capture labor, material, and other direct costs (ODC) for repair and overhaul work items to be performed on a Yard, Repair, Berthing, Messing (YRBM) barge (YRBM-57) during the period March 1, 2026 through June 15, 2026. The template includes a summary section linked to individual work item tabs and currently displays three work items: Sewage Collection and Holding Tank inspection (123-16-001), Split Air Conditioning Systems Upgrade (514-20-001), and Cosmetic Polymeric Deck Covering System Replacement (634-11-001). Offerors are instructed to input data in orange-highlighted cells, with cost breakdowns required in Japanese Yen (JPY) separated by in-house labor man-hours (MH), sub-contractor labor MH, overall labor costs, material costs, and ODC.

The form is structured to automatically calculate total proposed prices by work item and across all CLINs when properly populated. Offerors must provide detailed labor breakdowns by skill category (SFTR, INSL, WELD, SMTL, RGRS, PNTR, ELEC, PFTR, QA, and others) and specify personnel counts, hours per day, and number of days for both in-house and sub-contractor labor. The template contains provisions for up to 200 work items, though only three are currently identified in the document provided. All pricing data is linked to corresponding tabs for each Technical Government Inspection (TGI), eliminating the need for manual summary calculations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

OFFEROR/COMPANY NAME:

TABSUMMARYSUMMARYCLINTotal Labor (MH)Labor CostMaterial CostODC CostProposed Price
SOLICITATION NO:N6264926RA011CLIN 0001(1 WI)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
SHIP NAME:Yard, Repair, Berthing, Messing (YRBM) YRBM-57 berthing and messing bargeCLIN 0002 (Growth CLIN)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
AVAILABILITY:1 MAR 2026 - 15 JUN 2026Total for All CLINERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Total WIs (Specify Total)1Total Evaluated PriceERROR:#REF!
Growth CLIN %
Note to Offerors: The values in this Summary table is linked to the corresponding data from Tabs for each TGI listed, manual input is not necessary.
No.WI No.DESCRIPTIONProposed LaborMaterial/ODCsProposed Price (JPY)
In-House Labor (MH)Sub-Contractor Labor (MH)Total Labor (MH)Overall Total Labor Cost (JPY)Material Cost (JPY)ODC (JPY)
1123-16-001Sewage Collection, Holding Tank; open and inspectERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
2514-20-001SPLIT AIR CONDITIONING SYSTEMS UPGRADE; accomplishERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
3634-11-001Cosmetic Polymeric Deck Covering System Replacement;
accomplishERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200

N6105426RCPR111-0

SHIP NAME/AVAILABILITY:Barge (CVA-8)SOW N6105426RCPR111-0 SUMMARY
SOLICITATION #:N6264926RA029
SOW #:N6105426RCPR111-0In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Sewage Collection, Holding Tank; open and inspect00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

File details come from the government source that posted it. Updated .