4.03 Solicitation Amendment 0002 N6264926QJ0080002 SF 30.pdf
PDF 525 KB Posted
- Attached to
- Japanese Domestic Market Air Conditioners for Naval Air Facility (NAF) Atsugi, Family Housing Department
- Solicitation number
- N6264926QJ008
About this file
This is an Amendment of Solicitation (Amendment 0002) issued by Naval Supply Fleet Logistics Center Yokosuka on 23 April 2026 for solicitation N6264926QJ008. The amendment extends the response due date from 27 April 2026 to 29 April 2026 at 11:00 AM JST.
The amendment modifies CLIN 0002, which concerns an Installation Kit for Ductless Mini-Split Air Conditioner. The key specification change adds a minimum length requirement for the VVF Electrical Cable from the original specification of 2.0mm, 3-core to now specify a minimum of 6.8 meters. All other components of the installation kit remain unchanged, including refrigerant piping with 6.35 mm and 9.52 mm diameters and minimum 7-meter length, installation hardware (wall cap/sleeve, tape, saddle bands, wood screws, sealing putty), and drainage components (drain hose minimum 14mm diameter, 3m length). Quoters must continue to provide manufacturer's specification sheets for the exact model being quoted to verify compliance with all minimum specifications. The contracting officer is Jon R. Miller, NAVSUP FLT LOG CTR YOKOSUKA, and the amendment was signed on 23 April 2026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
I I
I
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section A - Solicitation/Contract Form
The following changes have been made:
INFORMATION FROM TO
Response Due Date 27 Apr 2026 29 Apr 2026
N6264926QJ0080002
Section B - Supplies or Services & Prices or Costs
The following CLIN(s) / SLIN(s) / ELIN(s) were modified:
INFORMATION FROM TO
Description
Installation Kit for Ductless Mini-Split Air ConditionerMinimum Specifications:The quoted product must be a complete installation kit fully compatible for use with the Air Conditioner model quoted under CLIN 0001. It must contain, at a minimum, the following components:Refrigerant Piping:One set of pre-flared copper refrigerant pipes with flare nuts attached.Pipe Diameters: 6.35 mm and
9.52 mm.Length: Must be at least 7 meters.Installation Hardware:Wall Cap / SleeveNon-Adhesive Tape (for wrapping pipes)Adhesive TapeSaddle Bands / Pipe ClampsWood ScrewsSealing PuttyDrainage & Electrical:Drain Hose (minimum 14mm diameter, 3m length)VVF Electrical Cable (2.0mm, 3-core) Instructions:Quoters must provide manufacturer's specification sheets for the exact model being quoted to allow the Government to verify compliance with all minimum specifications listed above.
Installation Kit for Ductless Mini-Split Air ConditionerMinimum Specifications:The quoted product must be a complete installation kit fully compatible for use with the Air Conditioner model quoted under CLIN 0001. It must contain, at a minimum, the following components:Refrigerant Piping:One set of pre-flared copper refrigerant pipes with flare nuts attached.Pipe Diameters: 6.35 mm and
9.52 mm.Length: Must be at least 7 meters.Installation Hardware:Wall Cap / SleeveNon-Adhesive Tape (for wrapping pipes)Adhesive TapeSaddle Bands / Pipe ClampsWood ScrewsSealing PuttyDrainage & Electrical:Drain Hose (minimum 14mm diameter, 3m length)VVF Electrical Cable (2.0mm, 3-core), minimum 6.8 metersInstructions:Quoters must provide manufacturer's specification sheets for the exact model being quoted to allow the Government to verify compliance with all minimum specifications listed above.
N6264926QJ0080002
| IDCode: J |
| Page: 1 |
| Pages: 3 |
| AmendNo: 0002 |
| EffDate: 23 Apr 2026 |
| ReqNo: See Continuation Sheet |
| ProjNo: |
| IssCode: N62649 |
| AdmCode: |
| IssuedBy: NAVSUP FLT LOG CTR YOKOSUKA |
PSC 473 BOX 11, FPO AP 96349-1500
FPO, AP 96349-1500
UNITED STATES
Jon Miller, Email: jon.r.miller17.ln@us.navy.mil Telephone: 315-264-3763 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: N6264926QJ008 |
| SolDate: 08 Apr 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: This amendment is being issued to specify the minimum length for the CLIN 0002 VVF Electrical Cable as 6.8 meters and to extend the quotation due date from 27 April 2026 to 29 April 2026 at 11:00 AM JST. All other terms remain unchanged. |
| ContNameTitle: |
| CoNameTitle: Jon R. Miller |
| ContDate: |
| CODate: 23 Apr 2026 |
File details come from the government source that posted it. Updated .