This document is a Job Specification and Cost Estimate Sheet for naval ship repair work on USS NEW ORLEANS (LPD-18) at Sasebo, along with supporting email correspondence regarding contract modifications.
The primary work requirement (ICN 38KF386304, Rev 01) involves changing the material source for temporary power cables from Contractor Furnished Material (CFM) to Government Furnished Material (GFM) for a Standby Emergency Diesel Generator (SEDG) installation. The contractor must contact the SRF Tool Room to coordinate cable return procedures prior to work commencement. The SRF Tool Room will issue four shore power plug assemblies and temporary power cables (either 250-square millimeters or 125-square millimeters) as required. The cost estimate indicates 8 man-hours for the work with no GFM or CFM costs identified. The anticipated award date is 09/12/2026, with a production completion date of 12/30/2026 and POP end date of 01/30/2027. The work is being prepared by N. Kuwahara (E KU) dated 9/8/2026, approved by S. Murakami (S225), and concurred by A. Oka (S233) at the Sasebo facility.
The email chain (dated August 24 through September 4, 2026) documents the contractual modification process initiated by the project manager. TOYO, the only viable contractor proposal received, requested the cables be provided as GFM and the schedule be extended to allow SEDG removal after the Japanese New Year holiday (approximately January 8, 2027). The Contract Specialist noted that significant solicitation changes necessitate re-competing the RFQ on the street for a short period. The S310 Class Team Leader confirmed the SRF Toolroom has the required cables available and can support the provision of GFM, and concurred with extending the removal date to 01/07/2027, with the project manager's email dated 9/4/2026 initiating this modification.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment N6264926Q04850001 SF 30.pdf | ||
| 38KF386304_00_A01.pdf | ||
| Solicitation - N6264926Q0485.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ship/HULL NO. Ship/HULL NAME I ICN:
LPD-18 USS NEW ORLEANS JON: 38KF386304
TITLE: Standby Emergency Diesel Generator (SEDG); provide
Rev-1(FO1)~Material Source from CFM to GFM; change
JOB SPECIFICATION
Rev:
Anticipated Award Date Production Completion Date: PREPARING ACTIVITY:
cf/(,~/20~ I 2-( =$0/2-c~
POP Start Date: POP End Date: SASEBO l O ( 2- -z-/ z_o'J-b o L / 3,0 (u,~7
PREPARED BY: CODE DATE
N. KUWAHARA E KU 9/8/2026
APPROVED BY:
CODE
S. MURAKAMI S225
CONCURRED BY: /Ill/ - CODE ~
A.OKA Kl~ S233
ASSIST PLANNER'S NAME: CODE
ASSIST PLANNER'S NAME: CODE
ASSIST PLANNER'S NAME: CODE
DESCRIPTION:
JSN(S}: ES01-L086 CASREP #
5/F CONTACT: ROGERSJ. CWP# CCNS#
h~il 9/10/iro Approved by 5300/590~ Date: Avl: 7J1
V v I I
LWC:
Work Completed
5/Force: Rate: Date:
Key Op:
A02
Ship Supt: Date: SRF CONTROL NO.: I '3D 13 f '3', 1 2... -- " 0 /
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
Ship/HULL NO. Ship/HULL NAME
ICN:
LPD-18 USS NEW ORLEANS JON: 38KF386304
TITLE: Standby Emergency Diesel Generator (SEDG); provide
Rev-1 (FO1 )~Material Source from CFM to GFM; change
1. SCOPE:
1.1 Title: Standby Emergency Diesel Generator (SEDG); provide Rev-l(FOl)~Material Source from CFM to GFM; change
1.2 Location of Work:
1.2.1 Not Applicable
1.3 Identification:
1.3.1 Not Applicable
2 . REFERENCES :
2 .1 None.
3. REQUIREMENTS:
Rev: Key Op:
01 A02
3.1 Change the material source for the temporary power cable listed in
1.3.2 of the original work item 38KF386304-A01, from CFM (Contractor Furnished Material) to GFM (Government Furnished Material). (See Note 4.2)
3.1.1 The contractor must contact the SRF Tool Room to coordinate cable return procedures and other relevant requirements prior to starting work.
4. NOTES:
4.1 Modification initiated by the project manager's email dated 9/4/2026.
PM will concur with the KTR proposal.
4.2 SRF Tool Room will issue four (4) shore power plug assemblies and temporary power cables (either 250-square millimeters or 125-square millimeters) when required.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 None.
Ship/HULL NO. Ship/HULL NAME 'ICN: Rev:
LPD-18 USS NEW ORLEANS
JON: 38KF386304 01
TITLE: Standby Emergency Diesel Generator (SEDG); provide
Rev-1 (FO1 )~Material Source from CFM to GFM; change
COST ESTIMATE SHEET
MAN HOUR/ TRADE
Ship Sheet Welder Machine
In-side Out-side Boller Maker Electr1c1an
Flpe lnsula\er
WORK ITEM
Fitter Metal Burner Machinist Machinist Fitter Lagger
PARA- X310 X41 X51 X68
X11 X17 X26 X31 X38 X56 XLG
GRAPH 531 431 551 599
511 517 526 538 538 556 541
3.1 8
SUB
TOTAL
GFM TOTAL GFM COST: None.
CFM TOTAL CFM COST: None.
d;f I, 0 I< ~-':' ~· r,-- .. ,~ ~ .. ~ •,: .- ·, - ;11 ,· ,._;, .. .. -
I i-·:
I
: I ? i 1'.; .'
,-40
' l I '
I .,· 0 , Painter Rigger Sand-Blast Laborer X99
X71 X72 438 S71 S72
:;"II"" .. ,.
,,: ,· J fr ~:~T ~-,. ... ,. f~1.
/3 o I 39 3 'r 12.
Key Op:
A02
QA MAN HOUR
5130 SUB-TOTAL
1 9
1 9
-oe; I
Kuwahara, Norio (S233) LN USN NAVSHIPREPFAC SAS JA (JPN)
From:
Sent:
To:
Cc:
Subject:
Signed By:
Importance:
Kuwahara-san, Rathbone, David Wayne (S310 Class Team Leader) CIV USN NAVSHIPREPFAC SAS JA
(USA)
Friday, September 4, 2026 4:14 PM Kuwahara, Norio (S233) LN USN NAVSHIPREPFAC SAS JA (JPN); Oka, Akihiro (S233) LN
USN NAVSHIPREPFAC SAS JA (JPN)
Morooka, Satoru (S231) LN USN NAVSHIPREPFAC SAS JA (JPN); Shibue, Hideaki LN
USN NAVSHIPREPFAC SAS JA (JPN)
FW: Query for: N264926Q0485, SRF/USS New Orleans (LPD-18), ICN 38KF386304, PT 26-6210 david.w.rathbone2.civ@us.navy.mil
High
Can we please issue a revision spec for the cables to be provided as GFM vice Contractor furnished? Please see below for information. Thank you!
Very Respectfully, David Rathbone
S310 Class Team Leader
LSD/LPD/LHA
SRF-JRMC Det. Sasebo
DESK DSN: 315-252-2845
CELL LOCAL: 090-1901-6873
From: Kurita, Hiromi LN USN NAVSUP FLCY SASEBO (JPN) <hiromi.kurita.ln@us.navy.mil>
Sent: Friday, September 4, 2026 3:05 PM
To: Rathbone, David Wayne (S310 Class Team Leader) CIV USN NAVSHIPREPFAC SAS JA (USA)
<david.w.rathbone2.civ@us.navy.mil>; Fujikawa, Cary S CIV USN COMFLEACT SASEBO JA (USA) <cary.s.fujikawa.civ@us.navy.mil>; Rogers, Jason CTR USN NAVSHIPREPFAC SAS JA (USA)
<jason.rogers2.ctr@us.navy.mil>
Cc: Shibue, Hideaki LN USN NAVSHIPREPFAC SAS JA (JPN) <hideaki.shibue.ln@us.navy.mil>; Brudnok, David P CIV (USA) <david. p. brudno k. civ@us. navy. m ii>
Subject: RE: Query for: N264926Q0485, SRF/USS New Orleans (LPD-18), ICN , PT 26-6210
Importance: High
Good afternoon Mr. Rathbone, KTR just contacted me regarding this request.
They told me they could wait till September 9th , so please officially provide us the revised spec.
Thank you and have a great weekend.
v/r, Hiromi Kurita
From: Brudnok, David P CIV {USA) <david.p.brudnok.civ@us.navy.mil> Sent: Monday, August 31, 2026 12:31 PM To: Rathbone, David Wayne {S310 Class Team Leader) CIV USN NAVSHIPREPFAC SAS JA {USA) <david.w.rathbone2.civ@us.navy.mil>; Fujikawa, Cary S CIV USN COMFLEACT SASEBO JA (USA)
<cary.s.fujikawa.civ@us.navy.mil>; Rogers, Jason CTR USN NAVSHIPREPFAC SAS JA {USA) <jason.rogers2.ctr@us.navy.mil> Cc: Kurita, Hiromi LN USN NAVSUP FLCY SASEBO {JPN) <hiromi.kurita.ln@us.navy.mil>; Molina, Mikala N LT USN NAVSHIPREPFAC SAS JA {USA) <mikala.n.molina.mil@us.navy.mil> Subject: RE: Query for: N264926Q0485, SRF/USS New Orleans (LPD-18), ICN 38KF386304, PT 26-6210
Good Afternoon David, Thank you for your response. As the changes significantly alter the conditions of the Solicitation we will have to go back out on the street for this RFQ (albeit for a shorter period this time). Please provide an updated/revised spec sheet that includes changing the Cables over to GFP and changing the Schedule to reflect the extra time given for the removal of the SEDG. Please update the IGE accordingly as well.
Thank you.
Respectfully, David Brudnok Contract Specialist Ashore (Code 242) NAVSUP Fleet Logistics Center, Yokosuka Site Sasebo NIPR Email: NAVSUP FLCY Sasebo Contracting C242@us.navy.mil
DSN: {315) 252-3492 / COM: 0956-50-3492
CUI
Online Customer Satisfaction Survey https://mynavsup. nag. navy. m il/apps/ops$protrack.customer feedback
From: Rathbone, David Wayne (S310 Class Team Leader) CIV USN NAVSHIPREPFAC SAS JA (USA) <david.w.rathbone2.civ@us.navy.mil> Sent: Monday, August 31, 2026 10:17 AM To: Brudnok, David P CIV (USA) <david.p.brudnok.civ@us.navy.mil>; Fujikawa, Cary S CIV USN COMFLEACT SASEBO JA (USA) <cary.s.fujikawa.civ@us.navy.mil>; Rogers, Jason CTR USN NAVSHIPREPFAC SAS JA {USA) <jason. rogers2.ctr@us. navy. m ii> Cc: Kurita, Hiromi LN USN NAVSUP FLCY SASEBO (JPN) <hiromi.kurita.ln@us.navy.mil>; Molina, Mikala N LT USN NAVSHIPREPFAC SAS JA {USA) <mikala.n.molina.mil@us.navy.mil> Subject: RE: Query for: N264926Q0485, SRF/USS New Orleans {LPD-18), ICN 38KF386304, PT 26-6210
David, Apologies for the delay. Spoke with the SRF Toolroom and we have the required cables and can support by providing them. Removal of the SEDG and other associated equipment on 1/07/27 is also acceptable. I concur with the KTR proposal.
Very Respectfully, David Rathbone S310 Class Team Leader
LSD/LPD/LHA
SRF-JRMC Det. Sasebo
DESK DSN: 315-252-2845
CELL LOCAL: 090-1901-6873
From: Brudnok, David P CIV (USA) <david.p.brudnok.civ@us.navy.mil> Sent: Monday, August 31, 2026 9:34 AM
To: Rathbone, David Wayne (S310 Class Team Leader) CIV USN NAVSHIPREPFAC SAS JA (USA)
<david.w.rathbone2.civ@us.navy.mil>; Fujikawa, Cary S CIV USN COMFLEACT SASEBO JA (USA)
<cary.s.fujikawa.civ@us.navy.mil>; Rogers, Jason CTR USN NAVSHIPREPFAC SAS JA (USA)
<jason.rogers2.ctr@us.navy.mil> Cc: Kurita, Hiromi LN USN NAVSUP FLCY SASEBO (JPN) <hiromi.kurita.ln@us.navy.mil>; Molina, Mikala N LT USN
NAVSHIPREPFAC SAS JA (USA) <mikala.n.molina.mil@us.navy.mil>
Subject: RE: Query for: N264926Q0485, SRF/USS New Orleans (LPD-18), ICN 38KF386304, PT 26-6210
Good Morning Everyone, Just wanted to follow and see if there has there been any movements or decisions toward this Project?
Please let me know.
Thank you!
Respectfully, David Brudnok Contract Specialist
Ashore (Code 242)
NAVSUP Fleet Logistics Center, Yokosuka Site Sasebo NIPR Email: NAVSUP FLCY Sasebo Contracting C242@us.navy.mil
DSN: (315) 252-3492 / COM: 0956-50-3492
CUI
Online Customer Satisfaction Survey https://mynavsup.nag.navy.mil/apps/ops$protrack.customer feedback
From: Rathbone, David Wayne (S310 Class Team Leader) CIV USN NAVSHIPREPFAC SAS JA (USA)
<david.w.rathbone2.civ@us.navy.mil>
Sent: Monday, August 24, 2026 3:19 PM
To: Fujikawa, Cary S CIV USN COMFLEACT SASEBO JA (USA) <cary.s.fujikawa.civ@us.navy.mil>; Rogers, Jason CTR USN NAVSHIPREPFAC SAS JA (USA) <jason.rogers2.ctr@us.navy.mil>
Cc: Kurita, Hiromi LN USN NAVSUP FLCY SASEBO (JPN) <hiromi.kurita.ln@us.navy.mil>; Molina, Mikala N LT USN
NAVSHIPREPFAC SAS JA (USA) <mikala.n.molina.mil@us.navy.mil>; Brudnok, David P CIV (USA)
<david.p.brudnok.civ@us.navy.mil>
Subject: RE: Query for: N264926Q0485, SRF/USS New Orleans (LPD-18), ICN 38KF386304, PT 26-6210
Cary, Jason, Can we take a look at this and decide if this is something we can do?
Very Respectfully, David Rathbone S310 Class Team Leader
LSD/LPD/LHA
SRF-JRMC Det. Sasebo
DESK DSN: 315-252-2845
CELL LOCAL: 090-1901-6873
From: Molina, Mikala N LT USN NAVSHIPREPFAC SAS JA (USA) <mikala.n.molina.mil@us.navy.mil>
Sent: Monday, August 24, 2026 11:29 AM To: Brudnok, David P CIV (USA) <david.p.brudnok.civ@us.navy.mil>; Rathbone, David Wayne (S310 Class Team Leader) CIV USN NAVSHIPREPFAC SAS JA (USA) <david.w.rathbone2.civ@us.navy.mil> Cc: Kurita, Hiromi LN USN NAVSUP FLCY SASEBO (JPN) <hiromi.kurita.ln@us.navy.mil>
Subject: RE: Query for: N264926Q0485, SRF/USS New Orleans (LPD-18), ICN 38KF386304, PT 26-6210
+ Dave Rathbone, who is taking over as NOL PM
Very Respectfully, LT Mikala Molina Project Manager for LPD 18 SRF Det Sasebo Local Cell: 080-5881-9424 lnt'l Cell: +81 80 5881 9424 SIPR: mikaLa.n,molina.mil@us,navy,srnH.mil
From: Brudnok, David P CIV (USA) <david.p.brudnok.civ@us.navy.mil> Sent: Monday, August 24, 2026 11:26 AM To: Molina, Mikala N LT USN NAVSHIPREPFAC SAS JA (USA) <mikala.n.molina.mil@us.navy.mil> Cc: Kurita, Hiromi LN USN NAVSUP FLCY SASEBO (JPN) <hiromi.kurita.ln@us.navy.mil> Subject: Query for: N264926Q0485, SRF/USS New Orleans {LPD-18), ICN 38KF386304, PT 26-6210
Good Morning Lt. Molina, We received a proposal from TOYO for the subject requirement; unfortunately they were the only viable proposal that we received. In regards to their proposal they included some conditions which cannot outright be accepted. The KO reached out to them and they stated they will not revise their proposal to remove said conditions.
The conditions are listed as such:
1. We do not have para 1.3.2 temp power cables for this job.
So, we want SRF to provide the cables as GFM.
2. The PCD 12/30/2026 is ok for us, but we would like to remove the SEDG, Outside tank, power cables, and fence on or around 01/07/2026 after Japanese new year holiday.
Due to their refusal to revise their proposal we cannot accept.
However if the above conditions look like something that SRF can change and agree to, our best option would be to revise the RFQ to include a new SPEC sheet that reflects that the cables are now GFM and that the schedule can slide until after the new year holiday (JAN 8 looks like our best bet). We can then put the RFQ out back out on the street for a short time and hope its more beneficial for the other Contractors as well. This is currently our only option as continuing on would mean we are met with a No Bid situation.
With all things considered do you think that this approach is feasible for you and your ships timelines?
Please let me know.
Thank you!
Respectfully, David Brudnok Contract Specialist Ashore (Code 242) NAVSUP Fleet Logistics Center, Yokosuka Site Sasebo NIPR Email: NAVSUP FLCY Sasebo Contracting C242@us.navy.mil
DSN: (315) 252-3492 / COM: 0956-50-3492
CUI
Online Customer Satisfaction Survey https://mynavsup.nag.navy.mil/apps/ops$protrack.customer feedback
File details come from the government source that posted it. Updated .