Offeror Pricing Schedule.xlsx

XLSX spreadsheet 52 KB Posted

Attached to
Non-Recurring Work Contract for Carpet/Resilient Floor Replacement at Various Locations, Oahu, Hawaii
Solicitation number
N62478-20-R-2482
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Work

SCHEDULE OF WORK
(TO BE COMPLETED AND SUBMITTED WITH THE OFFER)
ITEM NO.SUPPLIES/SERVICESAMOUNT
0001BASE PERIOD - NON-RECURRING WORK
Price to perform non-recurring work, for the 12-month Base Period, in accordance with all the terms of this contract.EST$12,500.00
0002OPTION PERIOD ONE - NON-RECURRING WORK
Price to perform non-recurring work, for the 12-month Option Period One, in accordance with all the terms of this contract.EST$12,500.00
0003OPTION PERIOD TWO - NON-RECURRING WORK
Price to perform non-recurring work, for the 12-month Option Period Two, in accordance with all the terms of this contract.EST$12,500.00
0004OPTION PERIOD THREE - NON-RECURRING WORK
Price to perform non-recurring work, for the 12-month Option Period Three in accordance with all the terms of this contract.EST$12,500.00
0005OPTION PERIOD FOUR - NON-RECURRING WORK
Price to perform non-recurring work, for the 12-month Option Period Four in accordance with all the terms of this contract.EST$12,500.00
TOTAL PRICE FOR CONTRACT LINE ITEM NUMBERS
(CLINs) 0001 THROUGH 0005$62,500.00
9000Exhibit Line Items
See Attachment 0200000-07, Exhibit A - Base Period
9001Exhibit Line Items
See Attachment 0200000-08, Exhibit B - Option Period One
9002Exhibit Line Items
See Attachment 0200000-09, Exhibit C - Option Period Two
9003Exhibit Line Items
See Attachment 0200000-10, Exhibit D - Option Period Three
9004Exhibit Line Items
See Attachment 0200000-11, Exhibit E - Option Period Four

BASE YR NON-RECURRING

ATTACHMENT J-0200000-08 OFFEROR

PROPOSED UNIT PRICE

Enter proposed unit price in this column. Price will automatically copy to the UNIT PRICE cell rounded to two decimal places.

Total Amount is Annual Price.

EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N62478-14-20-2482
EXHIBIT A - CLIN 9000
Line Item 0001 - Non-Recurring Work
Line Item 0001 - Non-Recurring Work - BASE PERIOD
PROVIDE PRICES FOR NONRECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs A700 through A762
ELIN /
Sub-ELINShort DescriptionDescription ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
A700Remove Non-Asbestos vinyl/vinyl composition floor tile or sheet/resilient flooring in Room/Corridor. Remove down to underlayment or bare concrete (Davis-Bacon Act Wages Apply).The Contractor shall remove existing Non-Asbestos vinyl/vinyl composition floor tiles or sheet/resilient floorings in areas other than stairway such as rooms and corridors etc. Line item includes normal removal of adhesive, disposal of all debris and clean-up. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.2,500.00SF0.0000$ - 0
A701Remove Non-Asbestos vinyl/vinyl composition floor tile or sheet/resilient flooring in Stairway.
Remove down to underlayment or bare concrete (Davis-Bacon Act Wages Apply).The Contractor shall remove existing Non-Asbestos vinyl/vinyl composition floor tiles or sheet/resilient floorings in stairway. Line item includes normal removal of adhesive, disposal of all debris and clean-up. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.625.00SF0.0000$ - 0
A702Remove roll or tile carpet in Room/Corridor.
Remove down to underlayment or bare concrete.The Contractor shall remove existing roll or tile carpets in areas other than stairway such as rooms and corridors etc. Line item includes normal removal of underlayer padding, grippers and/or adhesive, disposal of all debris and clean-up. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.2,500.00SY0.0000$ - 0
A703Remove roll or tile carpet in Stairway. Remove down to underlayment or bare concrete.The Contractor shall remove existing roll or tile carpets in stairway. Line item includes normal removal of underlayer padding, grippers and/or adhesive, disposal of all debris and clean-up. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.625.00SY0.0000$ - 0
A704Remove wooden or vinyl baseboard in Room/Corridor.The Contractor shall remove existing wooden or vinyl baseboards in areas other than stairway such as rooms and corridors etc. Line item includes preparation and painting of wall surface where baseboards are removed, with same color and gloss as existing paint. Line item also includes removal of all debris and clean-up. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.1,250.00LF0.0000$ - 0
A705Remove wooden or vinyl baseboard in Stairway.The Contractor shall remove existing wooden or vinyl baseboards in stairway. Line item includes preparation and painting of wall surface where baseboards are removed, with same color and gloss as existing paint. Line item also includes removal of all debris and clean-up. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.375.00LF0.0000$ - 0
A706Sampling & Testing: Asbestos Floor Tile and Adhesive (Non-Friable) Sampling and Testing of Vinyl, Vinyl Composition Tile, Vinyl sheet/resilient flooring in Room/Corridor/Stairway in buildings other than School (Davis-Bacon Act Wages Apply).The Contractor shall provide all requirements of sampling and testing for Asbestos and Asbestos Containing Materials (ACM) in Vinyl and Vinyl Composition Tile, Vinyl sheet/resilient flooring and adhesives to include sampling and testing in accordance with all applicable Federal, State and Military Codes/Regulations in building other than Schools. Line item includes sampling, testing and independent laboratory analysis and delivery of all related reports. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.250.00EA0.0000$ - 0
A707Sampling & Testing: Lead Based Paint (LBP and/or Paint With Lead (PWL) related to flooring work (moldings, trim, fascias, baseboard) in Room/Corridor/Stairway in buildings other than School (Davis-Bacon Act Wages Apply).The Contractor shall provide all requirements of sampling and testing for Lead Based Paint (LBP) and/or Paint With Lead (PWL) in accordance with all applicable Federal, State and Military Codes/Regulations in buildings other than School. Line item includes sampling, testing and independent laboratory analysis and delivery of all related reports. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.250.00EA0.0000$ - 0
A708Remove Asbestos vinyl/vinyl composition floor tile or vinyl sheet/resilient flooring in Room/Corridor/Stairway of buildings other than School. Remove down to underlayment or bare concrete (Davis-Bacon Act Wages Apply).The Contractor shall provide all requirements of Asbestos removal to include removal, disposal and sampling in accordance with all applicable Federal, State and Military Codes/Regulations and shall remove existing asbestos vinyl/vinyl composition floor tiles or vinyl sheet/resilient flooring, adhesives, or related Asbestos Containing Materials (ACM) in buildings other than School. Line item includes removal of adhesive, clean-up, and delivery of all asbestos waste to the appropriate disposal facility. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.1,250.00SF0.0000$ - 0
A709Remove Lead Based Paint (LBP and/or Paint With Lead (PWL) related to flooring work (moldings, trim, fascias, baseboard) in Room/Corridor/Stairway in buildings other than School (Davis-Bacon Act Wages Apply).The Contractor shall provide all requirements of Lead Based Paint (LBP) and/or Paint With Lead (PWL) removal to include removal, disposal and sampling in accordance with all applicable Federal, State and Military Codes/Regulations and shall remove existing LBP and/or PWL associated with the flooring work. Line item includes removal of LBP/PWL, clean-up, and delivery of all LBP/PWL waste to the appropriate disposal facility. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.1,250.00SF0.0000$ - 0
A710Provide and install Twelve Inch (12" x 12") vinyl floor tile in Room/Corridor (Davis-Bacon Act Wages Apply).The Contractor shall provide and install new vinyl floor tiles Twelve Inch (12 " x 12 ") in areas other than stairway such as rooms and corridors etc. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation. Floor is prepared for installation with minimal concrete surface filling of chips and leveling. Line item includes application of synthetic resin under-coating on floor for smoothing and leveling, and waxing. On- Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.1,250.00SF0.0000$ - 0
A711Provide and install Twelve Inch (12" x 12") vinyl composition floor tile in Room/Corridor (Davis- Bacon Act Wages Apply).The Contractor shall provide and install new vinyl composition floor tiles Twelve Inch (12" x 12") in areas other than stairway such as rooms and corridors etc. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation. Floor is prepared for installation with minimal concrete surface filling of chips and leveling. Line item includes application of synthetic resin under-coating on floor for smoothing and leveling, and waxing. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.1,250.00SF0.0000$ - 0
A712Provide and install Twelve Inch (12" x 12") vinyl floor tile in Stairway (Davis- Bacon Act Wages Apply).The Contractor shall provide and install new vinyl floor tiles Twelve Inch (12" x 12") in stairway. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation. Floor is prepared for installation with minimal concrete surface filling of chips and leveling. Line item includes application of synthetic resin under-coating on floor for smoothing and leveling, and waxing. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.375.00SF0.0000$ - 0
A713Provide and install Twelve Inch (12" x 12") vinyl composition floor tile in Stairway (Davis-Bacon Act Wages Apply).The Contractor shall provide and install new vinyl composition floor tiles Twelve Inch (12" x 12") in stairway. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation. Floor is prepared for installation with minimal concrete surface filling of chips and leveling. Line item includes application of synthetic resin under-coating on floor for smoothing and leveling, and waxing. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.375.00SF0.0000$ - 0
A714Provide and install vinyl floor sheet/resilient flooring in Room/Corridor (Davis-Bacon Act Wages Apply).The Contractor shall provide and install new vinyl floor sheet/resilient floorings in areas other than stairway such as rooms and corridors etc. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation.
Floor is prepared for installation with minimal concrete surface filling of chips and leveling. Line item includes application of synthetic resin under-coating on floor for smoothing and leveling, and waxing if necessary. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.2,500.00SF0.0000$ - 0
A715Provide and install vinyl floor sheet/resilient
flooring in Stairway (Davis- Bacon Act Wages Apply).The Contractor shall provide and install new vinyl floor sheet/resilient floorings in stairway. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation. Floor is prepared for installation with minimal concrete surface filling of chips and leveling. Line item includes application of synthetic resin under-coating on floor for smoothing and leveling, and waxing if necessary. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.625.00SF0.0000$ - 0
A716Provide and install Twenty Four Inch (24" x 24") tile carpet in Room/Corridor.The Contractor shall provide and install new tile carpets Twenty Four Inch (24" x 24") in areas other than stairway such as rooms and corridors etc. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation. Floor is prepared for installation with minimal concrete surface filling of chips and leveling. Line item includes application of synthetic resin under-coating on floor for smoothing and leveling. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.250.00SY0.0000$ - 0
A717Provide and install Twenty Four Inch (24" x 24") tile carpet in Stairway.The Contractor shall provide and install new tile carpets Twenty Four Inch (24" x 24") in stairway. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation. Floor is prepared for installation with minimal concrete surface filling of chips and leveling. Line item includes application of synthetic resin under-coating on floor for smoothing and leveling. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.125.00SY0.0000$ - 0
A718Provide and install STANDARD GRADE
"HEAVY" roll carpet with urethane carpet cushion installation suitable for carpet. Installation process is "Stretch in" over cushion secured to "Tackless Carpet Stripping" in Room/Corridor. Standard Grade "Heavy" carpet suitable for normal office use.The Contractor shall provide and install new STANDARD GRADE "HEAVY" roll carpets with cushion with installation process used as "Stretch in" over cushion secured to "Tackless Carpet Stripping" in areas other than stairway such as rooms and corridors etc. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation. Floor is prepared for installation with minimal concrete surface filling of chips and leveling. Line item includes application of synthetic resin under- coating on floor for smoothing and leveling. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.1,250.00SY0.0000$ - 0
A719Provide and install SUPERIOR GRADE
"HEAVY" roll carpet with urethane carpet cushion installation suitable for carpet. Installation process is "Stretch in" over cushion secured to "Tackless Carpet Stripping" in Room/Corridor. Superior Grade "Heavy" carpet suitable for normal office use, but superior presentation.The Contractor shall provide and install new SUPERIOR GRADE "HEAVY" roll carpets with cushion with installation process used as "Stretch in" over cushion secured to "Tackless Carpet Stripping" in areas other than stairway such as rooms and corridors etc. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation. Floor is prepared for installation with minimal concrete surface filling of chips and leveling. Line item includes application of synthetic resin under- coating on floor for smoothing and leveling. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.625.00SY0.0000$ - 0
A720Provide and install COMMERCIAL GRADE

"SEVERE" roll carpet with urethane carpet cushion installation suitable for carpet. Installation process is "Stretch in" over cushion secured to "Tackless Carpet Stripping" in Room/Corridor.

Commercial Grade "Severe" carpet suitable for high traffic offices/areas like clubs or office foyers, corridors.The Contractor shall provide and install new COMMERCIAL GRADE "SEVERE" roll carpets with cushion with installation process used as "Stretch in" over cushion secured to "Tackless Carpet Stripping" in areas other than stairway such as rooms and corridors etc. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation. Floor is prepared for installation with minimal concrete surface filling of chips and leveling. Line item includes application of synthetic resin under-coating on floor for smoothing and leveling. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.625.00SY0.0000$ - 0
A721Provide and install PLUSH COMMERCIAL GRADE
"HEAVY" roll carpet with urethane carpet cushion installation suitable for carpet. Installation process is "Stretch in" over cushion secured to "Tackless Carpet Stripping" in Room/Corridor. Plush Commercial Grade "Heavy" carpet suitable for Flag/VIP offices like Admiral's or CO's offices.The Contractor shall provide and install new PLUSH COMMERCIAL GRADE "HEAVY" roll carpets with cushion with installation process used as "Stretch in" over cushion secured to "Tackless Carpet Stripping" in areas other than stairway such as rooms and corridors etc. Line item includes application of synthetic resin under-coating on floor for smoothing and leveling. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.250.00SY0.0000$ - 0
A722Provide and install STANDARD GRADE
"HEAVY" roll carpet with urethane carpet cushion installation suitable for carpet. Installation process is "Stretch in" over cushion secured to "Tackless Carpet Stripping" in Stairway. Standard Grade "Heavy" carpet suitable for normal office use.The Contractor shall provide and install new STANDARD GRADE "HEAVY" roll carpets with cushion with installation process used as "Stretch in" over cushion secured to "Tackless Carpet Stripping" in Stairway. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation. Floor is prepared for installation with minimal concrete surface filling of chips and leveling. Line item includes application of synthetic resin under-coating on floor for smoothing and leveling. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.1,250.00SY0.0000$ - 0
A723Provide and install SUPERIOR GRADE
"HEAVY" roll carpet with urethane carpet cushion installation suitable for carpet. Installation process is "Stretch in" over cushion secured to "Tackless Carpet Stripping" in Stairway. Superior Grade "Heavy" carpet suitable for normal office use, but superior presentation.The Contractor shall provide and install new SUPERIOR GRADE "HEAVY" roll carpets with cushion with installation process used as "Stretch in" over cushion secured to "Tackless Carpet Stripping" in Stairway. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation. Floor is prepared for installation with minimal concrete surface filling of chips and leveling. Line item includes application of synthetic resin under-coating on floor for smoothing and leveling. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.625.00SY0.0000$ - 0
A724Provide and install COMMERCIAL GRADE
"SEVERE" roll carpet with urethane carpet cushion installation suitable for carpet. Installation process is "Stretch in" over cushion secured to "Tackless Carpet Stripping" in Stairway. Commercial Grade "Severe" carpet suitable for high traffic offices/areas like clubs or office foyers, corridors.The Contractor shall provide and install new COMMERCIAL GRADE "SEVERE" roll carpets with cushion with installation process used as "Stretch in" over cushion secured to "Tackless Carpet Stripping" in Stairway. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation. Floor is prepared for installation with minimal concrete surface filling of chips and leveling. Line item includes application of synthetic resin under-coating on floor for smoothing and leveling. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.625.00SY0.0000$ - 0
A725Provide and install PLUSH COMMERCIAL GRADE
"HEAVY" roll carpet with urethane carpet cushion installation suitable for carpet. Installation process is "Stretch in" over cushion secured to "Tackless Carpet Stripping" in Stairway. Plush Commercial Grade "Heavy" carpet suitable for Flag/VIP offices like Admiral's or CO's offices.The Contractor shall provide and install new PLUSH COMMERCIAL GRADE "HEAVY" roll carpets with cushion with installation process used as "Stretch in" over cushion secured to "Tackless Carpet Stripping" in Stairway. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation. Floor is prepared for installation with minimal concrete surface filling of chips and leveling. Line item includes application of synthetic resin under-coating on floor for smoothing and leveling. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.125.00SY0.0000$ - 0
A726Provide and install STANDARD GRADE
"HEAVY" roll carpets with "Glue-down" method in Rooms/Corridors. Standard Grade "Heavy" carpet suitable for normal office use.The Contractor shall provide and install new STANDARD GRADE "HEAVY" roll carpets with installation process used as "Glue- down" method in areas other than stairway such as rooms and corridors etc. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation. Floor is prepared for installation with minimal concrete surface filling of chips and leveling. Line item includes application of synthetic resin under-coating on floor for smoothing and leveling. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.625.00SY0.0000$ - 0
A727Provide and install SUPERIOR GRADE
"HEAVY" roll carpets with "Glue-down" method in Rooms/Corridors. Superior Grade "Heavy" carpet suitable for normal office use, but superior presentation.The Contractor shall provide and install new SUPERIOR GRADE "HEAVY" roll carpets with installation process used as "Glue- down" method in areas other than stairway such as rooms and corridors etc. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation. Floor is prepared for installation with minimal concrete surface filling of chips and leveling. Line item includes application of synthetic resin under-coating on floor for smoothing and leveling. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.625.00SY0.0000$ - 0
A728Provide and install COMMERCIAL GRADE

"SEVERE" roll carpets with "Glue-down" method in Rooms/Corridors.

Commercial Grade "Severe" carpet suitable for high traffic offices/areas like clubs or office foyers, corridors.The Contractor shall provide and install new COMMERCIAL GRADE "SEVERE" roll carpets with installation process used as "Glue-down" method in areas other than stairway such as rooms and corridors etc. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation. Floor is prepared for installation with minimal concrete surface filling of chips and leveling. Line item includes application of synthetic resin under-coating on floor for smoothing and leveling. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.375.00SY0.0000$ - 0
A729Provide and install PLUSH COMMERCIAL GRADE
"HEAVY" roll carpets with "Glue-down" method in Rooms/Corridors. Plush Commercial Grade "Heavy" carpet suitable for Flag/VIP offices like Admiral's or CO's offices.The Contractor shall provide and install new PLUSH COMMERCIAL GRADE "HEAVY" roll carpets with installation process used as "Glue-down" method in areas other than stairway such as rooms and corridors etc. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation. Floor is prepared for installation with minimal concrete surface filling of chips and leveling. Line item includes application of synthetic resin under-coating on floor for smoothing and leveling. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.125.00SY0.0000$ - 0
A730Provide and install EXTERIOR GRADE
"HEAVY" roll carpets with "Glue-down" method in Rooms/Corridors. Exterior Grade "Heavy" carpet suitable for all outside applications.The Contractor shall provide and install new EXTERIOR GRADE "HEAVY" roll carpets with installation process used as "Glue- down" method in areas other than stairway such as rooms and corridors etc. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation. Floor is prepared for installation with minimal concrete surface filling of chips and leveling. Line item includes application of synthetic resin under-coating on floor for smoothing and leveling. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.375.00SY0.0000$ - 0
A731Provide and install STANDARD GRADE
"HEAVY" roll carpets with "Glue-down" method in Stairway. Standard Grade "Heavy" carpet suitable for normal office use.The Contractor shall provide and install new STANDARD GRADE "HEAVY" roll carpets with installation process used as "Glue- down" method in Stairway. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation. Floor is prepared for installation with minimal concrete surface filling of chips and leveling. Line item includes application of synthetic resin under-coating on floor for smoothing and leveling. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.125.00SY0.0000$ - 0
A732Provide and install SUPERIOR GRADE
"HEAVY" roll carpets with "Glue-down" method in Stairway. Superior Grade "Heavy" carpet suitable for normal office use, but superior presentation.The Contractor shall provide and install new SUPERIOR GRADE "HEAVY" roll carpets with installation process used as "Glue- down" method in Stairway. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation. Floor is prepared for installation with minimal concrete surface filling of chips and leveling. Line item includes application of synthetic resin under-coating on floor for smoothing and leveling. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.125.00SY0.0000$ - 0
A733Provide and install COMMERCIAL GRADE
"SEVERE" roll carpets with "Glue-down" method in Stairway. Commercial Grade "Severe" carpet suitable for high traffic offices/areas like clubs or office foyers, corridors.The Contractor shall provide and install new COMMERCIAL GRADE "SEVERE" roll carpets with installation process used as "Glue-down" method in Stairway. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation. Floor is prepared for installation with minimal concrete surface filling of chips and leveling. Line item includes application of synthetic resin under-coating on floor for smoothing and leveling. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.125.00SY0.0000$ - 0
A734Provide and install PLUSH COMMERCIAL GRADE
"HEAVY" roll carpets with "Glue-down" method in Stairway. Plush Commercial Grade "Heavy" carpet suitable for Flag/VIP offices like Admiral's or CO's offices.The Contractor shall provide and install new PLUSH COMMERCIAL GRADE "HEAVY" roll carpets with installation process used as "Glue-down" method in Stairway. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation. Floor is prepared for installation with minimal concrete surface filling of chips and leveling. Line item includes application of synthetic resin under- coating on floor for smoothing and leveling. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.125.00SY0.0000$ - 0
A735Provide and install EXTERIOR GRADE
"HEAVY" roll carpets with "Glue-down" method in Stairway. Exterior Grade "Heavy" carpet suitable for all outside applications.The Contractor shall provide and install new EXTERIOR GRADE "HEAVY" roll carpets with installation process used as "Glue- down" method in Stairway. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation. Floor is prepared for installation with minimal concrete surface filling of chips and leveling. Line item includes application of synthetic resin under-coating on floor for smoothing and leveling. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.125.00SY0.0000$ - 0
A736Provide and install wooden baseboard in Room/Corridors.The Contractor shall provide and install new wooden baseboards in areas other than stairway such as rooms and corridors etc. Normal surface preparation. Clean and scrape surface of foreign materials prior to installation. Line item includes preparation and painting of new wooden baseboards. Color and gloss of painting will be designated by customer. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.625.00LF0.0000$ - 0
A737Provide and install wooden baseboard in Stairway.The Contractor shall provide and install new wooden baseboards in stairway. Normal surface preparation. Clean and scrape surface of foreign materials prior to installation. Line item includes preparation and painting of new wooden baseboards. Color and gloss of painting will be designated by customer. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.125.00LF0.0000$ - 0
A738Provide and install Four Inch (4") vinyl baseboard in Room/Corridor.The Contractor shall provide and install new Four Inch (4") vinyl baseboards in areas other than stairway such as rooms and corridors etc. Normal surface preparation. Clean and scrape surface of foreign materials prior to installation. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.625.00LF0.0000$ - 0
A739Provide and install Six Inch (6") vinyl baseboard in Room/Corridor.The Contractor shall provide and install new Six Inch (6") vinyl baseboards in areas other than stairway such as rooms and corridors etc. Normal surface preparation. Clean and scrape surface of foreign materials prior to installation. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.625.00LF0.0000$ - 0
A740Provide and install Four Inch (4") vinyl baseboard in Stairway.The Contractor shall and install provide new Four Inch (4") vinyl baseboards in stairway. Normal surface preparation. Clean and scrape surface of foreign materials prior to installation. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.250.00LF0.0000$ - 0
A741Provide and install Six Inch (6") vinyl baseboard in Stairway.The Contractor shall and install provide new Six Inch (6") vinyl baseboards in stairway. Normal surface preparation. Clean and scrape surface of foreign materials prior to installation. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.250.00LF0.0000$ - 0
A742Install GFM tile carpet in Room/Corridor.The Contractor shall install tile carpet furnished by the Government, in areas other than stairway such as rooms and corridors etc.
Adhesive and other materials necessary to complete GFM carpet installation, are furnished by the Contractor. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation. Floor is prepared for installation with minimal concrete surface filling of chips and leveling. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.125.00SY0.0000$ - 0
A743Install GFM tile carpet in Stairway.The Contractor shall install tile carpet furnished by the Government, in stairway. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation. Floor is prepared for installation with minimal concrete surface filling of chips and leveling. Adhesive and other materials necessary to complete GFM carpet installation, are furnished by the Contractor. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.125.00SY0.0000$ - 0
A744Install GFM roll carpet and Contractor provided cushion. Installation process is "Stretch in" over cushion secured to "Tackless Carpet Stripping" in Room/Corridor.The Contractor shall install roll carpet furnished by the Government, in areas other than stairway such as rooms and corridors etc. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation. Floor is prepared for installation with minimal concrete surface filling of chips and leveling. Underlayer cushion, adhesive and other materials necessary to complete GFM carpet installation, are furnished by the Contractor. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.125.00SY0.0000$ - 0
A745Install GFM roll carpet and Contractor provided cushion. Installation process is "Stretch in" over cushion secured to "Tackless Carpet Stripping" in Stairway.The Contractor shall install roll carpet furnished by the Government, in Stairway. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation. Floor is prepared for installation with minimal concrete surface filling of chips and leveling. Underlayer cushion, adhesive and other materials necessary to complete GFM carpet installation, are furnished by the Contractor. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.125.00SY0.0000$ - 0
A746Install GFM roll carpet, "Glue-down" installation method in Room/Corridor.The Contractor shall install roll carpet furnished by the Government, with installation process used as "Glue-down" method in areas other than stairway such as rooms and corridors etc. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation. Floor is prepared for installation with minimal concrete surface filling of chips and leveling. Adhesive and other materials necessary to complete GFM carpet installation, are furnished by the Contractor. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.125.00SY0.0000$ - 0
A747Install GFM roll carpet, "Glue-down" installation method in Stairway.The Contractor shall install roll carpet furnished by the Government, with installation process used as "Glue-down" method in Stairway. Normal concrete/floor surface preparation. Clean and scrape floor surface of foreign materials prior to installation. Floor is prepared for installation with minimal concrete surface filling of chips and leveling. Adhesive and other materials necessary to complete GFM carpet installation, are furnished by the Contractor. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to complete the work.125.00SY0.0000$ - 0
A748Remove existing metal strip.The Contractor shall remove existing metal strip at edge of floor covering. Line item includes disposal of all debris and clean-up. On- Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and equipment to
complete the work.625.00LF0.0000$ - 0
A749Provide and install metal strip.The Contractor shall provide and install new metal strip at edge of floor covering. On-Site work shall commence as soon as practical and be completed within 30 days after receiving the request for service. The Contractor shall be responsible to schedule the service with the customer or building tenant. The unit prices shall include all labor, material, parts, travel time, mobilization, supervision and
equipment to complete the work.1,250.00LF0.0000$ - 0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .