18-2466,_Amendment_No._0004.pdf
PDF 976 KB Posted
- Solicitation number
- N6247818R2466
About this file
18-2466,_Amendment_No._0004.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 18-2466,_Amendment_No._0006.pdf | ||
| 18-2466,_Amendment_No._0005.pdf | ||
| 18-2466,_Amendment_No._0003.pdf | ||
| 18-2466,_Amendment_No._0002.pdf | ||
| 18-2466,_Amendment_No._0001.pdf | ||
| RFP_No._N62478-18-R-2466.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
FIRE PROTECTION SYSTEMS MAINTENANCE AND REPAIR SERVICES, OAHU, HAWAII
The proposal due date is hereby extended to January 26, 2018, 2:00 PM, HST.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Jan-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247818R2466
X 9B. DATED (SEE ITEM 11)
15-Dec-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Jan-2018
CODE
NAVFAC HAWAII
SERVICES ACQUISITION DIVISION (PRJ233)
400 MARSHALL ROAD
JBPHH HI 96860-3139
N62478 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6247818R2466
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES (REVISED)
SECTION C
Annex 0200000 – Replace Pages 8, 9, and 15 with the attached Pages 8, 9, and 15 (Amendment No. 0004).
SECTION F
Attachment F-1 – Replace Pages 1 and 10 with the attached Pages 1 and 10 (Amendment No. 0004).
SECTION J
Table of Contents – Replace Page 1 (Amendment No. 0002) with the attached Page 1 (Amendment No.
0004).
Attachment J-0200000-06 – Replace Pages 1 and 2 with the attached Pages 1 through 4 (Amendment No.
Attachment J-0200000-07 – Replace Pages 1 and 2 with the attached Pages 1 through 3 (Amendment No.
Attachment J-0200000-08 – Replace Pages 1 and 2 with the attached Pages 1 through 4 (Amendment No.
Attachment J-0200000-09 – Replace Pages 1 through 3 with the attached Pages 1 through 4 (Amendment No. 0004).
Attachment J-0200000-18 – Insert Pages 1 through 3 (Amendment No. 0004).
(End of Summary of Changes)
14-18-2466
0200000, Page 8 of 31 (Amendment No. 0004)
0200000 - Management and Administration
Spec Item Title Description
Section F. The Contractor shall submit accurate and complete documents within the required timeframes as specified in Section F.
Government acceptance of deliverables will not relieve the Contractor of the responsibility for any error or omission which may exist in the deliverable, as the Contractor is responsible for all requirements of this contract.
The Contractor shall establish and maintain a secure website for posting an electronic copy of all deliverables listed in Section F. The Contractor shall allow only authorized Government and Contractor personnel to access the website. Government personnel access shall be limited to viewing and downloading of deliverables, but restricted from posting to the website. The Contractor shall notify the Government by email whenever there are new or updated deliverables posted to the website.
Each deliverable posting on the website and each email notification shall include the title of the deliverable, the spec item requiring the deliverable, and the date and time the deliverable was posted. All deliverables shall be available to authorized Government personnel 24 hours/day and 365 days/year for the duration of the contract.
2.6.5 Service Interruptions If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall submit a Service
Interruption Notification to the KO, affected tenants, and customers per
Section F. If the discontinued service is due to an emergency breakdown the Contractor shall notify the KO, affected tenants and customers as soon as practicable.
2.6.6 NAVFAC MAXIMO MAXIMO is the Computerized Maintenance Management System
(CMMS) used by the Government for work order history, asset management, and condition assessment. The Contractor shall provide all required data for NAVFAC MAXIMO as identified below:
2.6.6.1 MAXIMO Data Required data fields for work orders are indicated in the Asset Information provided in J-0200000-06. Asset Specification requirements are indicated in J-0200000-07. Required data for documenting condition assessments is indicated in the Characteristic Meter Reading Information provided in J-0200000-08. Service Provider Information is indicated in J-0200000-09. Specified data shall be provided for all work performed in 1502000 Facility Investment. Further instructional information detailing the process for submitting the specified information for NAVFAC MAXIMO Data Reporting is provided in J-0200000-18. The Asset Information, Asset Specification, and Characteristic Meter Reading Interfaces are used in multiple processes for loading data into MAXIMO by the Government and the format may be updated periodically.
As part of the update the Contractor may be asked to modify the file to add/move columns in their submission. The Contractor also shall provide up to 10 extra data elements or columns with as many as 150 characters per element for the Government to define during contract performance at no additional cost to the Government. The Government will provide the
Contractor 60 calendar day notice of modifications to the Service
Provider, Asset, Specification, or Characteristic Meter Reading Interfaces file format.
2.6.6.2 MAXIMO Method of
Data Entry
The Contractor shall provide data for NAVFAC MAXIMO using the methods detailed below if access to MAXIMO is not available:
0200000, Page 9 of 31 (Amendment No. 0004)
0200000 - Management and Administration
Spec Item Title Description
The Contractor shall submit asset data in spreadsheet form or in a Pipe Delimited Flat File following the NAVFAC MAXIMO Data Reporting process described in J-0200000-18 per Section F.
2.6.7 Quality Management
System (QMS)
The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein. The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The
Contractor's QMS program shall address:
Accurate documentation of work processes, procedures, and output measures.
A systematic procedure for assessing compliance with performance objectives and standards.
Accurate documentation of quality inspections and surveillance conducted throughout the execution of work.
Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.
2.6.7.1 Quality Management
(QM) Plan
The Contractor shall develop and submit a QM Plan per Section F. The
QM Plan shall describe the QMS methodology and approaches used under this contract. If any changes are made during the period of performance, submit to the KO a revised QM Plan for acceptance.
The Contractor’s QM Plan shall include, at a minimum, the following:
• Policy and objectives of Quality Management System (QMS)
• Quality organization o List of personnel o Responsibilities & lines of authority o Training and qualifications
• Approach to assuring quality of services provided and conformance with performance objectives and standards
• Methods and procedures for effective planning, operation and control of processes and performance of work
• Procedures for inspection and surveillance of services o Scheduling and performance of inspection and surveillance o Measurement, data collection and analysis o Corrective action, preventive action, and continuous improvement o Oversight of subcontracted work
• Documentation and records management
• Communication with government (customers)
2.6.7.2 Quality Inspection and
Surveillance
The Contractor shall establish and maintain an inspection and surveillance system in accordance with the FAR Clause 52.246-4, INSPECTION OF
SERVICES – FIXED PRICE, to ensure that the work performed conforms to the contract requirements. The Contractor shall document and maintain a file of all scheduled and performed inspections and surveillances, inspection and surveillance results, and dates and details of corrective and preventive actions. The quality inspection and surveillance file shall be the property of the Government and made available during the
Government’s regular working hours. The file shall be turned over to the
KO within five calendar days of termination of the contract.
2.6.7.3 Quality Inspection and
Surveillance Report
The Contractor shall submit a copy of the Contractor Quality Inspection and Surveillance Report per Section F. The Contractor Quality
0200000, Page 15 of 31 (Amendment No. 0004)
0200000 - Management and Administration
Spec Item Title Description
Government estimates the wait period can be up to 15 minutes. The
Contractor shall notify the Government Performance Assessment
Representative (PAR) and appropriate point of contract if an escort is not available after 15 minutes and access to accomplish the work is denied.
Unscheduled requirements, e.g., trouble calls, may require a longer wait for an escort. A list of facilities that may require a building escort is listed in J-0200000-17.
2.8.7 Security Clearances The Contractor shall obtain all required corporate and personnel Security
Clearances prior to commencement of work. The Contractor shall ensure that a list of all personnel with Security Clearances is maintained current, including clearances that are pending.
2.8.8 Access to Sensitive
Unclassified
Information
The Contractor personnel whose work involves access to sensitive unclassified information shall undergo a National Agency Check
Investigation (NACI) to verify their suitability. If the Contractor personnel currently have a favorably adjudicated NACI the Contractor shall notify the Government Command Security Manager who will validate this in the Joint Personnel Adjudication System (JPAS).
The Contractor shall request from the Government for access to the E-QIP
Direct program for the Contractor employees to complete the SF-85 form on line for an NACI. The Security Manager will determine suitability.
Upon a favorable NACI, the Contractor personnel shall provide the completed Personnel Security Investigation (PSI) to the Security Manager along with the original signed release statements, applicant fingerprint card (FD87), and an OF-306 Declaration for Federal Employment per
Section F. The Contractor shall be responsible for providing the fingerprint card.
The request shall be renewed annually or for the duration of the contract if less than one year.
2.8.9 Employee Status The Contractor shall notify the KO of any changes to any employee’s status to include, but not limited to, termination, convictions/arrests, adverse actions taken on the job for any reason or any other documented misbehavior that may affect, or have the potential to affect, security standing in terms of access to federal facilities or IT systems.
2.9 Contractor Safety
Program
The Contractor shall develop and implement a Safety Program detailing how the Contractor plans, staffs, performs, and controls all safety practices while delivering best value services to the Government without any accidents or mishaps. The Contractor’s safety program shall comply with all safety standards identified in the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1 and Public Law 91-596, Occupational Safety and Health Act.
Any reference to “USACE" facilities, property, or equipment specified in
EM 385-1-1 should be interpreted as Government facilities, property, and equipment.
2.9.1 Accident Prevention
Plan (APP)
The Contractor shall develop and implement a site Accident Prevention
Plan (APP). The APP shall be prepared by the Contractor’s SSHO and shall be followed by all Contractor employees, subcontractors, and vendors at each service site.
The APP shall follow the format and include all elements addressed in
Appendix A of EM 385-1-1. The APP shall incorporate Activity Hazard
ATTACHMENT F-1
DELIVERABLES
Annex/ Spec Item
Form Attachment
Number Deliverable
Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
0200000/ 2.3.4
N/A Permits and Licenses
No later than five calendar days prior to commencing work and as requested by
KO
KO 1 As required
0200000/ 2.3.5
N/A Certificate of Insurance
Within 15 calendar days after contract award and as subsequent changes occur
KO 1 Initial report:
Once
Subsequent reports: Once per change 0200000/
2.6.2 N/A Verbal
Scheduling & Work Status Report
Within two hours of the inquiry by KO during regular working hours, and by 0800 the following workday for inquiries after regular working hours
KO 1 As required
0200000/ 2.6.5
N/A Service Interruption Notification
Minimum of 14 calendar days prior to the scheduled outage
KO 1 Once per outage
0200000/ 2.6.6.2
J-0200000-
NAVFAC
MAXIMO
Data Report
Within 5 calendar days after end of month
KO 1 As required
0200000/ 2.6.7.1
N/A Quality Management (QM) Plan
Within 15 calendar days after contract award and within seven calendar days of any change during period of performance
KO 1 Initial Plan:
Once
Subsequent plans: Once per change
0200000/ 2.6.7.3
N/A Quality Inspection and Surveillance Report
Within five calendar days after end of quarter
KO 1 Quarterly
0200000/ 2.7.1
N/A List of Key Personnel and Qualifications
Within 15 calendar days after contract award
Subsequent reports: within seven calendar days of any change
KO and
COR
1 Initial report:
Once
Subsequent reports: Once per change
0200000/ 2.7.1
N/A Organizational Chart
Initial report: Within 15 calendar days after contract award
Subsequent reports: Within seven calendar days of any change
KO and
COR
1 Initial report:
once
Subsequent reports: Once per change
0200000/ 2.8.1
N/A Employee List Initially within 15 calendar days after contract award and subsequently within
KO 1 Initial report:
Once
ATTACHMENT F-1, Page 1 of 47 (Amendment No. 0004)
Deliverables Form Preparation Instructions
Deliverable Title: 0200000/2.6.6.2 – Maximo Method of Data Entry
Form Attachment No.: J-0200000-18
Government Acceptance Required: _ X__ Yes __ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The plan shall be prepared using Microsoft Office software.
2. The Contractor shall submit asset data in a Spreadsheet format or a Pipe Delimited Flat File following the NAVFAC MAXIMO Data Reporting process described in J-0200000-18.
3. Submit to COR and Mr. Joel Pai at email < joel.pai@navy.mil >.
ATTACHMENT F-1, Page 10 of 47 (Amendment No. 0004)
SECTION J
DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
TABLE OF CONTENTS
ATTACHMENT
NUMBER ATTACHMENT TITLE
J-0200000-01 Definitions and Acronyms J-0200000-02 Wage Determinations J-0200000-03 References and Technical Documents J-0200000-04 Sample Invoice Form J-0200000-05 NAVFAC Contractor Incident Reporting System (CIRS) J-0200000-06 MAXIMO Asset Information J-0200000-07 MAXIMO Asset Specification J-0200000-08 MAXIMO Characteristic Meter Reading Information J-0200000-09 MAXIMO Service Provider Information J-0200000-10 Security Requirements Applicable For The Fleet Logistics Center, Pearl Harbor Fuel Complex J-0200000-11 Reserved J-0200000-12 Exhibit Line Item Numbers, Base Period J-0200000-13 Exhibit Line Item Numbers, Option Period One J-0200000-14 Exhibit Line Item Numbers, Option Period Two J-0200000-15 Exhibit Line Item Numbers, Option Period Three J-0200000-16 Exhibit Line Item Numbers, Option Period Four J-0200000-17 Special/Secure Access Locations J-0200000-18 NAVFAC MAXIMO Data Reporting J-1502000-01 Site Maps J-1502000-02 Fleet Logistics Center Description of Fire Protection and Alarm Systems J-1502000-03 Reserved J-1502000-04 Fleet Logistics Center Inspection, Testing and Preventive Maintenance Schedule J-1502000-05 MCBH Fire Alarm Systems J-1502000-06 Reserved J-1502000-07 Reserved J-1502000-08 MCBH Fire Sprinkler Systems J-1502000-09 MCBH Inspection, Testing & Maintenance Form J-1502000-10 Testing & Inspecting MATOC 3 & 4 Flight Simulator J-1502000-11 Kitchen Fire Suppression Systems & Equipment J-1502000-12 Testing & Inspecting Kitchen Fire Suppression System J-1502000-13 Historical Service Order Workload J-1502000-14 Facilities and Equipment Summary Table
Section J – TOC, Page 1 of 1 (Amendment No. 0004)
Interface: Service Provider
VERSION #: V1
Current as of: 7/7/2013
Version History V1 - Updated to reflect current interface in MAXIMO
TABS
1-Service Provider Info This Sheet 2-Service Provider Field List Service Provider Template Data
Format Information 3-Service Provider - Template Sample Excel Format
ATTACHMENT J-0200000-06
MAXIMO ASSET INFORMATION
J-0200000-06, Page 1 of 4 (Amendment No. 0004)
Interface: Asset File
VERSION #:V1
Current as of: 7 July 2013
Position Name Required Length Limit Data Format Note Content Notes MAXIMO Field Name
1 AssetNum Y 25 ASSETNUM
2 Changed Date N MM/DD/YYYY CHANGEDATE
3 Description Y 100 DESCRIPTION
4 Long Description N 1,000 LONGDESCRIPTION
5 Master System Y Must match Value List in
Maximo
Value list in REFERENCE SPREADSHEET.
POSITIONs 5,6,and 7 should not only be on the value list but be related in the UNIFORMAT Hierarchy: D30, D3010, D3010100 etc…
MASTERSYSTEM
6 System Y Must match Value List in
Maximo
Value list in REFERENCE SPREADSHEET.
POSITIONs 5,6,and 7 should not only be on the value list but be related in the UNIFORMAT Hierarchy: D30, D3010, D3010100 etc…
SYSTEM
7 Sub-System Y Must match Value List in
Maximo
Value list in REFERENCE SPREADSHEET.
POSITIONs 5,6,and 7 should not only be on the value list but be related in the UNIFORMAT Hierarchy: D30, D3010, D3010100 etc…
SUBSYSTEM
8 Location Y Must match Value List in
Maximo Value list in REFERENCE SPREADSHEET LOCATION
9 Site ID Y Must match Value List in
Maximo Value list in REFERENCE SPREADSHEET -or- For this contract only: XXXXX
SITEID
10 Work Center (Person Group) Y Must match Value List in
Maximo
Value list in REFERENCE SPREADSHEET -or- For this contract:
- use the following identifier "XXXX"
PERSONGROUP
11 Asset Type Y Must match Value List in
Maximo Value list in REFERENCE SPREADSHEET ASSETTYPE
12 Asset Quantity N Integer QUANTITY
13 Inventory Category Y Must match Value List in
Maximo Value list in REFERENCE SPREADSHEET INVENTORYCATEGORY
14 Purchase Price N Integer PURCHASEPRICE
15 Budgeted Cost N Integer BUDGETCOST
16 Replacement Cost Y Integer REPLACECOST
17 Meter Group N Must match Value List in
Maximo Value list in REFERENCE SPREADSHEET GROUPNAME
18 Belongs To (Parent) N Must match an existing ASSETNUM in Maximo.
Asset Number of Parent. The asset and its parent can't be created in the same file
PARENT
19 Contract Number N 25 Appended to
LONGDESCRIPTION
J-0200000-06, Page 2 of 4 (Amendment No. 0004)
Interface: Asset File
VERSION #:V1
Current as of: 7 July 2013
Position Name Required Length Limit Data Format Note Content Notes MAXIMO Field Name
20 Task/Delivery Order Number N 25 Appended to
LONGDESCRIPTION
21 Drawing Reference ID N 25 Appended to
LONGDESCRIPTION
22 Warranty Expiration Date N MM/DD/YYYY Appended to
LONGDESCRIPTION
23 Status Date N LEAVE BLANK Leave blank/Do Not Use STATUSDATE
24 Installation Date Y MM/DD/YYYY INSTALLDATE
25 Asset Status N Must match Value List in
Maximo
Value list in REFERENCE SPREADSHEET -or- "Operating" for NEW and "Decommissioned or DEA" for removed equipment
STATUS
26 CLASSSTRUCTUREID N
Must match Value List in
Maximo Value list in REFERENCE SPREADSHEET CLASSSTRUCTUREID
27 Job Plan Code N 25 Appended to
LONGDESCRIPTION
28 Equipment Tag Number N 25 Appended to
LONGDESCRIPTION
29 Additional Loc Info N 250 ADDLOCINFO
30 Manufacturer N Must match Value List in
Maximo Value list in REFERENCE SPREADSHEET MANUFACTURER
31 Model N 25 MODEL
32 Serial # N 25 SERIALNUM
J-0200000-06, Page 3 of 4 (Amendment No. 0004)
Interface: Service Provider
VERSION #: V1
Current as of: 7/7/2013
Position 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Name Approved
Date Work Type
Customer Reference
Number Description Location
Reported By
Master System
Status Status Date
Priority Actual Start
Actual Finish
Supervisor Labor Hours
(Actual)
Labor Cost (Actual)
Material Cost
(Actual) Duration Asset
Required Field(s) N Y Y Y Y N N Y Y Y N N N Y Y Y N N
NOTES:
• ONLY COLUMNs 1-35, and rows containing data should be be included in the FLAT-FILE SUBMISSION;
• Pipe Delimited (.txt) - | (Pipe is at the end of the column. Must have 35 PIPEs per row.)
Position
Name
Required Field(s)
19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
Target Finish
Target Start Reported
Date Lead
Sched uled Start
Scheduled Finish
Modifie d Date
Modified By
PMNEXTD
UEDATE
Is Task?
Parent
WO
Work Order
Detail Location
CLIN
Customer Ref Code
Sub Work Type
Work Center
N N Y N N N Y Y N Y N N N N N N N
J-0200000-06, Page 4 of 4 (Amendment No. 0004)
J-0200000-07, Page 1 of 3 (Amendment No. 0004)
Interface: Asset Specification VERSION #: v1 Current as of: 17 May 2012
Version History v1 - Updated to reflect current interface in MAXIMO
TABS
1-Asset Specification Info This Sheet 2-Asset Specification Field List Asset Specification Template Data Format Information 3-Asset Specification - Template
ATTACHMENT J-0200000-07
MAXIMO ASSET SPECIFICATION
Sample Excel Format & Sample of file after exporting to a "|" delimited
J-0200000-07, Page 2 of 3 (Amendment No. 0004)
Interface: Asset Specification VERSION #: v1 Current as of: 17 May 2012
Position Name Required Length Limit
Field Definition Content Notes
NAVFAC
MAXIMO_FIELD
(ASSETSPEC.)
1 Asset Y 25 Asset identification number. Must match an existing value in Maximo.
ASSETNUM
2 SITEID Y 8 FEC ID. Must match existing value list If all work is done at a single FEC, recommend the correct SITEID be provided in the templay.
ASSETATTRID
3 CLASSSTRUCTUREID Y 20
Key Value used in Maximo to identify the speciificaiton/attribute record. Value is not shown on the front end (visable to a user).
Must match existing value in Maximo (example data a "1616" is an Electric Meter)
CLASSSTRUCTUREID
4 Attribute Y 300 Attribute Name (example data - the PTRATIO is attribute being set)
ASSETATTRID
5 Numeric Value N 40
Specification value with numeric value only.-only one value can be pased Numeric or AlphaNumeric; must match domain list if one exists.
NUMVALUE
6 Alphanumeric N 254
Specitication value with mixed (alpha and numeric) content. Only one value can be pased Numeric or AlphaNumeric; must match domain list if one exists.
ALNVALUE
7 Unit of Measure N 8 must match domain MEASUREUNITID
N/A Changed By Value is inserted by the System User that is running the interface
Values are not incluled in the template, information provided to explain the source of the the value created by Maximo.
CHANGEBY
N/A Change Date System Date Values are not incluled in the template, information provided to explain the source of the the value created by Maximo.
CHANGEDATE
J-0200000-07, Page 3 of 3 (Amendment No. 0004)
Interface: Asset Specification VERSION #: v1 Current as of: 17 May 2012
Position 1 2 3 4 5 6 7
Name Asset SITE ID
CLASS
STRUCTURE ID
Attribute Numeric Value Alphanumeric Unit of Measure
Required Field(s)
Y Y Y Y N N N
NOTES:
• ONLY POSITION/COLUMN 1-7, and rows containing data should be be included in the FLAT-FILE SUBMISSION;
• Pipe Delimited (.txt) - | (Pipe is at the end of the column. Must have 7 PIPEs per row.)
• If the column to the right of the last column is selected when saving (what would be the 8th position) this will provide the 7th PIPE
Interface: Characteristic Meter Reading VERSION #: v2 Current as of: 30 Sept 2016
Version History v1 - Updated to reflect current interface in MAXIMO (December 12, 2012) v2 - Updated to relect Utilities (DI) values only range from 1 to 5, not 10 (Sept 30, 2016)
TABS
1-Characteristic Meter Reading Info This Sheet
2-Characteristic Meter Reading Field List Characteristic Meter Reading Template Data Format Information
3-Characteristic Meter Reading - Template Sample Excel Format 4-Observation Values Valid Observation values as of 9/2016
ATTACHMENT J-0200000-08
MAXIMO CHARACTERISTIC METER READING INFORMATION
J-0200000-08, Page 1 of 4 (Amendment No. 0004)
Current as of: 30 Sept 2016
Position Name Required Length Limit
Data Format Note
Field Definition Content Notes
NAVFAC
MAXIMO_FIELD
(MEASUMENT /
ASSETMETER)
See Note Below
1 Site Y 8 UPPER Must match Value List in Maximo Value list in REFERENCE SPREADSHEET -or- For this contract only: XXXXX
SITEID / SITEID
2 Asset Y 25
Must match an existing
ASSETNUM in Maximo
The asset number used must exist in NAVFAC MAXIMO prior to submission, or the record will be rejected.
Value list in REFERENCE SPREADSHEET
ASSETNUM / ASSETNUM
3 Meter Y 15 UPPER The value listed in the third position must be an existing, valid Maximo
DCR or UCR meter.
Value must match existing value in Maximo. list in
REFERENCE SPREADSHEET
METER NAME /
METER NAME
4 Observation Y 254 ALN Last Reading/Observation value.
Must be a valid value in MAXIMO
Value must match existing value in Maximo list.
Current value list included on Tab 4 - Observation Values
OBSERVATION /
LASTREADING
5 Measurement Date Y 10
MM/DD/YYYY
hh:mm:ss Date Observation was recorded
MEASUREDATE /
LASTREADINGDATE
6 Inspector Y 30 Must match Value List in
Maximo
Identifies the person reporting the observation
Value list in REFERENCE SPREADSHEET -or- For this contract:
- use the following identifier "XXXX"
INSPECTOR /
LASTREADINGINSPCTR
NOTE (NAVFAC MAXIMO/FIELD):
The observation information is filed in one of two locations. If the observation is the MOST CURRENT reading (by Measurement Date) - it is filed in the MEASUREMENT Table. If the data when received is not the most current, it is filed in the ASSETMETER Table. The filing location is irrelevant to the inteface use, but this information is provided to prevent confusion when reviewing the data in Maximo.
When reviewing the data in Maximo (after processing) - If the meter reading being imported is newer than the last reading applied to the Assets record, a new meter reading entry will also be added
J-0200000-08, Page 2 of 4 (Amendment No. 0004)
Current as of: 30 Sept 2016
Position 1 2 3 4 5 6
Name Site Asset Meter Observation Measurement
Date Inspector
Required Field(s) Y Y Y Y Y Y
NOTES:
• ONLY POSITIONs 1-6, and rows containing data should be be included in the FLAT-FILE SUBMISSION;
• Pipe Delimited (.txt) - | (Pipe is at the end of the column. Must have 7 PIPEs per row. Last PIPE indicates end of line (EOL))
J-0200000-08, Page 3 of 4 (Amendment No. 0004)
Current as of: 30 Sept 2016
FACILITIES (DCR):
A (Amber) A+ (Amber Plus) A- (Amber Minus) G (Green) G+ (Green Plus) G- (Green Minus) R (Red) R+ (Red Plus) R- (Red Minus)
UTILITIES (UCR):
1 (Best/Highest CI Ranking) 5 (Worst/Lowest CI Ranking)
OBSERVATION VALUES
J-0200000-08, Page 4 of 4 (Amendment No. 0004)
J-0200000-09, Page 1 of 4 (Amendment No. 0004)
Interface: Service Provider
VERSION #: V1
Current as of: 7/7/2013
Version History V1 - Updated to reflect current interface in MAXIMO
TABS
1-Service Provider Info This Sheet 2-Service Provider Field List Service Provider Template Data
Format Information 3-Service Provider - Template Sample Excel Format
ATTACHMENT J-0200000-09
MAXIMO SERVICE PROVIDER INFORMATION
J-0200000-09, Page 2 of 4 (Amendment No. 0004)
Interface: Service Provider
VERSION #: V1
Current as of: 7/7/2013 Service Provider (BOSC1) is a pipe delimited file.
Position Name Required Length Limit
Data Format Note Field Definition Content Notes NAVFAC
MAXIMO_FIELD
1 Approved Date N 10 MM/DD/YYYY hh:mm:ss
The Date on which the Work Order was last approved. If the file contains an Approved Date, then this date will be pulled over to the record.
If the Approved Date in the file is null, then the Reported Date plus one minute will be displayed in the record.
APPROVEDDATE
2 Work Type Y 15 Must match Value List in Maximo.
(Cross-walked field.).
Must match Crosswalk
Identifies the work order's type.
Example types are: preventive maintenance, corrective maintenance, emergency maintenance, capital project, and event report.
Value list in REFERENCE SPREADSHEET -or- For this contract the following are valid work types:
CLIN XXXXXX use "XXXX"
WORKTYPE
Customer Reference Number
Y 10
Contractors internal work order tracking number.
Will update Record if Value is found in Maximo otherwise new record (Work order) will be created.
SERVPRVREFCODE
4 Description Y 150 Describes the work order.
If the Description is null, in the inbound file, then this field is defaulted to CROSSWALK value.
DESCRIPTION
5 Location Y 30 Must match Value List in Maximo
Identifies the work order's location. This is not necessarily the asset's location, however, if an asset is entered, its location will default here.
- If the Location is null, in the inbound file, then this field is defaulted to the site's base location.
Value list in REFERENCE SPREADSHEET LOCATION
6 Reported By N 62 Must match Value List in Maximo
Identifies the person reporting the work order.
Value list in REFERENCE SPREADSHEET -or- For this contract:
- use the following identifier "XXXX"
REPORTEDBY
7 Master System N N/A Not used N/A
8 Status Y 16 (Cross-walked field.)
Must match Crosswalk
Status of the work order, for example, in progress, waiting on material, waiting for approval, completed, or closed.
Value list in REFERENCE SPREADSHEET -or- For this contract:
- use the following identifier "XXXX"
STATUS
9 Status Date Y 10 MM/DD/YYYY hh:mm:ss STATUSDATE
10 Priority Y 12 (Cross-walked field.)
Must match Crosswalk
Identifies the importance of the work order, from 0-999, where 0 is the lowest priority and 999 is the highest. If the Priority is null, in the inbound file, then this field is defaulted.
Value list in REFERENCE SPREADSHEET WOPRIORITY
11 Actual Start N 10 MM/DD/YYYY hh:mm:ss ACTSTART
12 Actual Finish N 10 MM/DD/YYYY hh:mm:ss ACTFINISH
13 Supervisor N 30 Must match Value List in Maximo
Value list in REFERENCE SPREADSHEET -or- For this contract:
- use the following identifier "XXXX"
SUPERVISOR
14 Labor Hours(Actual) Y 8 Number (2 decimal places) ACTLABHRS
15 Labor Cost(Actual) Y 10 Number (2 decimal places) ACTLABCOST
J-0200000-09, Page 3 of 4 (Amendment No. 0004)
Interface: Service Provider
VERSION #: V1
Current as of: 7/7/2013 Service Provider (BOSC1) is a pipe delimited file.
Position Name Required Length Limit
Data Format Note Field Definition Content Notes
NAVFAC
MAXIMO_FIELD
16 Material Cost(Actual) Y 10 Number (2 decimal places) ACTMATCOST
17 Duration N 8 Number (2 decimal places) Estimated remaining number of hours needed to complete the work.
ESTDUR
18 Asset N 25 Must match an existing ASSETNUM in Maximo
The asset number used must exist in NAVFAC MAXIMO prior to submission, or the record will be rejected.
Value list in REFERENCE SPREADSHEET
ASSETNUM
19 Target Finish N 10 MM/DD/YYYY hh:mm:ss TARGCOMPDATE
20 Target Start N 10 MM/DD/YYYY hh:mm:ss TARGSTARTDATE
21 Reported Date Y 10 MM/DD/YYYY hh:mm:ss REPORTDATE
22 Lead N 30 Must match Value List in Maximo
Lead person responsible for the work. Value list in REFERENCE SPREADSHEET LEAD
23 Scheduled Start N 10 MM/DD/YYYY hh:mm:ss SCHEDSTART
24 Scheduled Finish N 10 MM/DD/YYYY hh:mm:ss SCHEDFINISH
25 Modified Date Y 10 LEAVE BLANK Leave blank/Do Not Use Leave blank/Do Not Use CHANGEDATE
26 Modified By Y 30 LEAVE BLANK Leave blank/Do Not Use Leave blank/Do Not Use CHANGEBY
27 PMNEXTDUEDATE N 4 MM/DD/YYYY hh:mm:ss PMNEXTDUEDATE
28 Is Task? Y 1 Yes or No ISTASK
29 Parent WO N 10 Length Limit: 250 Must exist in NAVFAC MAXIMO prior to submission or the record will be rejected.
Must exist in NAVFAC MAXIMO prior to submission or the record will be rejected.
PARENT
30 Work Order N 10 Must match Value List in Maximo
Used in updating record status on existing records.
WONUM
31 Detail Location N 250 DETAILLOC
32 CLIN N 30 Contract Line Item Number CLIN
33 Customer Ref Code N 8 Must match Value List in Maximo
Value list in REFERENCE SPREADSHEET CUSTOMERCODE
34 Sub Work Type N 15 (Cross-walked field).
Must match Crosswalk
Defaulted field based on the value of worktype SUBWORKTYPE
35 Work Center N 8 Must match Value List in Maximo
Value list in REFERENCE SPREADSHEET -or- For this contract:
- use the following identifier "XXXX"
PERSONGROUP
J-0200000-09, Page 4 of 4 (Amendment No. 0004)
Interface: Service Provider
VERSION #: V1
Current as of: 7/7/2013
Position 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Name Approved
Date Work Type
Customer Reference
Number Description Location
Reported By
Master System
Status Status Date
Priority Actual Start
Actual Finish
Supervisor Labor Hours
(Actual)
Labor Cost (Actual)
Material Cost
(Actual) Duration Asset
Required Field(s) N Y Y Y Y N N Y Y Y N N N Y Y Y N N
19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
Target Finish
Target Start Reported
Date Lead
Schedule d Start
Scheduled Finish
Modified Date
Modified By
PMNEXT
DUEDAT
E Is Task?
Parent
WO
Work Order
Detail Location
CLIN
Customer Ref Code
Sub Work Type
Work Center
N N Y N N N Y Y N Y N N N N N N N
NOTES:
• ONLY COLUMNs 1-35, and rows containing data should be be included in the FLAT-FILE SUBMISSION;
• Pipe Delimited (.txt) - | (Pipe is at the end of the column. Must have 35 PIPEs per row.)
ATTACHMENT J-0200000-18
NAVFAC MAXIMO DATA REPORTING
PURPOSE AND OVERVIEW
The purpose of this attachment is to provide guidance on how data is to be recorded and provided by the Contractor in reporting Service Provider, Asset, Specification, and Characteristic Meter Reading Information for NAVFAC MAXIMO. This document outlines the methods that must be utilized by the Contractor and associated NAVFAC business process and procedures for how data is to be submitted.
GENERAL TYPES OF DATA
Asset Information
Asset Information includes all necessary information for the documentation of all completed work orders, including, but not limited to, service orders, preventive maintenance (as performed under the PM program or as part of IMP), and work issued as Nonrecurring work. Specific NAVFAC MAXIMO fields required for work order data are listed on the Service Provider Information spreadsheet provided in J-0200000-06.
Asset Specification
Asset Specification includes the specific details necessary for proper identification and tracking of assets. Asset data must be updated for all completed work orders where an asset is repaired, replaced, installed, or otherwise affected.
Specific NAVFAC MAXIMO fields required for asset data are listed on the Asset Information spreadsheet provided in J-0200000-07. When replacing existing assets, the Contractor shall change the status of the current asset which will remove it from the maintenance plan and add the new asset.
Condition Assessment Data
Condition assessment data includes all necessary information for the accurate condition rating of all assets in support of the Infrastructure Condition Assessment Program (ICAP). Specific NAVFAC MAXIMO fields required for condition assessment data are listed on the Characteristic Meter Reading Information spreadsheet provided in J- 0200000-08.
METHOD FOR DATA SUBMISSION
NAVFAC MAXIMO Flat File Data Exchange
The Contractor will utilize the data formats contained in the Asset Information provided in J-0200000-06, Asset Specification provided in J-0200000-07, Characteristic Meter Reading Information provided in J-0200000-08 and Service Provider Information in J-1502000-09. The Contractor shall use their own internal systems to generate the flat file data into the format required. The Contractor is responsible for ensuring that data is correct and validated to meet the Maximo data requirements. If any data gets rejected the Contracting Officer will send the “rejected” data back to Contractor and the Contractor shall correct and resubmit the data within 24 hours. In all cases of data rejects the Contractor shall communicate with the Contracting Officer to rectify the data rejects.
Flat File Data Validation and Preparation
NAVFAC MAXIMO has several interfaces to assist in data transfer, many interfaces are used for multiple purposes to efficiently load or modify existing data in the system. Because of those multiple uses for each interface there are strict rules on how the data must be prepared for successful submission and loading.
The format required for flat files is detailed in the spreadsheets described below:
• ASSET SPECIFICATION – (Spreadsheet provided in J-0200000-07) – contains the format and data elements for submission of new or updated Asset Information.
14-17-2466 J-0200000-18, Page 1 of 3 (Amendment No. 0004)
• CHARACTERISTIC METER READING INFORMATION – (Spreadsheet provided in J-0200000-08) – contains the format and data elements for submission of updated Condition Assessment Information.
Service Provider, Asset, & Characteristic Meter Reading Information Spreadsheet Format
• Tab 1 – General Information - Version number, change log, etc.
• Tab 2 – Field Information – Field Name, Data Type, short description on field use and related information including Content Notes and NAVFAC MAXIMO Field Name.
• Tab 3 – Flat File Data Layout
The Contractor is required to validate their data prior to submission to minimize data rejects. To assist the contractor in data validation, the appropriate reference values will be provided by the Government and updated as changes occur. The reference files contain the valid data values for specific fields within MAXIMO at a specific time. Due to the frequent nature of changes for some value lists within MAXIMO (e.g., new assets added or status being changed), this file will be directly transferred from a local PW Representative to the Contractor as changes occur. The Contractor shall communicate with the Contracting Officer if any data values need to be added.
• SERVICE PROVIDER INFORMATION – (Spreadsheet provided in J-0200000-09) –contains the format and data elements for submission of Work Order Information.
Examples of data requiring validation:
• A current list of the valid Manufacturer’s (Company) Name values in NAVFAC MAXIMO. When adding a new asset, the contract will select the appropriate Company value so it will permit the successful asset record insert.
Company Description Company Type
Organization
MCQUAY McQuay International; HVAC equipment M NAVFAC
• A current list of the valid Assets for the contract. The file must be refreshed periodically to reflect assets added over the contract period. Assets must be added prior to Work Order being submitted for work on the asset or the Work Order will be rejected.
Sample Reference Value “asset”
Asset Description Location Parent Rotating Item
Work Center Site
WNY111-
AHU-05
SPLIT SYSTEM #1A WNY-111 WNY111-AHU-
CIMU-02
WCCP22 10101
• For some fields, NAVFAC MAXIMO may have many valid values such as SiteID and Work Center, however the Contractor will have only one authorized value. The Government will notify the Contractor of the specific values to be used for all records.
Flat File Submission Requirements
For data required to be submitted via flat file as specified in Section C, further detail of the format and submission requirements are detailed below. There are two different types of flat files: Pipe Delimited and Spreadsheet format.
• Pipe Delimited Flat File:
In this method the Contractor will prepare data in flat files for submission. These documents have strict requirements that must be followed to permit the successful processing by the Government to import into NAVFAC MAXIMO. Pipe Delimited Flat files are text files which are pipe delimited (the ‘|’ symbol on the keyboard) with
J-0200000-18, Page 2 of 3 (Amendment No. 0004) one record per line in the file. The Contractor is responsible to verify data against the reference values to prevent record rejects for required information.
Service Provider Information, Asset Information, Specification Information, and Characteristic Meter Reading Information Reports submitted as pipe delimited flat-files must be prepared as follows:
An individual flat file record is made up of over 30 individual fields, stored in a text file and delimited by the piping symbol ( ‘|’ ). Not all of the fields must have data. Fields that are not required to have data must still exist in the flat file record but are allowed to have no data present for that field. See below for illustration for fields not required. A flat file is a text file that contains one or more of these individual records.
Example of a single line from a Service Provider work order flat file:
04|SC|181|131: RPL FLORESCENT LIGHT COVER|ELCENT-131|ENS SUMMERS||COMP|8/31/2005
16:37:16|3|8/30/2005 0:00:00|8/30/2005 13:30:00||0.50|8.73|0|0.00|131|||8/29/2005 9:13:28|UTIL|8/30/2005
10:53:49|9/6/2005 10:55:47|8/31/2005 16:37:25|CHARLIE|
There are a couple things worth noting in this example. First, notice the places where two or three piping symbols appear in a row. Anytime two piping symbols are located next to each other, it means a NULL value is being submitted for that field. Three pipes in a row would signify two NULL fields.
The second item worth noting is the last field in the line. The line ends with “|CHARLIE|”. This is the 26th field and represents the CHANGEBY field. Since no more data are being sent with this individual record, no other piping symbols need to be included on this row. It would have been acceptable to include extra pipes to indicate the NULL values being sent for the remainder of the fields identified on the flat file format sheet.
• Spreadsheet Flat File:
In this method the Contractor will prepare data in flat files and submit in spreadsheet format to the Contracting Officer. These documents have strict requirements that must be followed to permit the successful processing by the Government to import into NAVFAC MAXIMO. The Contractor is responsible to verify data against the reference values to prevent record rejects for required information. Spreadsheet flat files shall be submitted in a Microsoft Excel file format. Upon acceptance, the Government will extract the relevant data to complete the NAVFAC MAXIMO Flat File Data Exchange.
Service Provider Information, Asset Information and Characteristic Meter Reading Information Reports submitted as spreadsheet flat-files must be prepared as follows:
The Contractor shall submit a complete work order, asset, or characteristic meter reading data spreadsheet by filling out all applicable portions of the Excel spreadsheet workbook after validating matching appropriate fields per provided reference files.
J-0200000-18, Page 3 of 3 (Amendment No. 0004)
| 18-2466 Amendment 0004.pdf |
| 18-2466 Amendment 0004 C-0200-specs |
| 18-2466 Amendment 0004 F-1 Maximo RPT |
| 18-2466 Amendment 0004 F-1 RPT Instructions |
| 18-2466 Amendment 0004 J-0200-TOC-06 |
| 18-2466 Amendment 0004 J-0200-18 |