Exhibit J JOC IDIQ SAMPLE SUBMITTAL REGISTER.docx
DOCX document 15 KB Posted
- Solicitation number
- N62473-20-R-0030
About this file
This document contains a sample submittal register and details of a federal contract opportunity for fencing projects. The sample submittal register outlines 22 required submittals prior to or during construction including quality control plans, safety plans, designs, permits, insurance certificates, cut sheets, and operation and maintenance documentation.
The federal contract opportunity is a solicitation from the Naval Facilities Engineering Command Southwest for fencing repair, removal and replacement projects at facilities in Seal Beach and Camp Pendleton under an indefinite delivery/indefinite quantity (IDIQ) contract. The contractor will provide all labor, materials, tools and equipment to complete pre-priced task order categories for fencing work. Task order overheads are included in pricing. The solicitation is set aside for service-disabled veteran-owned small businesses and work will be ordered under the contract on an as-needed basis.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N62473-20-R-0030 RFP.pdf | ||
| LOS ANGELES COUNTY WD 122719.pdf | ||
| SAN DIEGO COUNTY WD 122719.pdf | ||
| Exhibit H GENERIC UFGS Guides for projects.docx | DOCX document | |
| Exhibit F Surety Form.docx | DOCX document | |
| Exhibit E Financial Questionnaire.docx | DOCX document | |
| Exhibit A - Offeror Team Composition and Management.docx | DOCX document | |
| FENCING ELINS FOR RFP.xlsx | XLSX spreadsheet | |
| Exhibit C - PPQ.docx | DOCX document | |
| Exhibit G Revised RFI Form.docx | DOCX document | |
| Exhibit B - Experience - Offeror.docx | DOCX document | |
| Exhibit X Post-Award-Limitations-on-Subcontracting-Report.docx | DOCX document | |
| Exhibit D Safety Data 123019.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SAMPLE SUBMITTAL REGISTER
| SUBMITTAL/BENCHMARK |
| DURATION |
| BENCHMARK |
| REQUIRED |
| STATUS |
| 1 |
| Quality Control Plan |
| Prior to |
| Start of Construction |
| 2 |
| Material Safety Data Sheets |
| Prior to |
| Start of Construction |
| 3 |
| Planning/Construction Schedule |
| Within 15 days |
| After Award |
| 4 |
| Waste Management Plan |
| Prior to |
| Start of Construction |
| 5 |
| Safety and Health Plan or Accident Prevention Plan |
| Prior to |
| Start of Construction |
| 6 |
| Utility Outage Plan |
| Prior to |
| Start of Construction |
| 7 |
| Schedule of Prices |
| Within 21 days |
| After Award |
| 8 |
| Operation and Maintenance Information |
| Prior to |
| Final Payment |
| 9 |
| Licenses and Permits |
| Prior to |
| Start of Construction |
| 10 |
| Badge Requests, DBIDS requests |
| Prior to |
| Any work on Government Property |
| 11 |
| Statement of Acknowledgement SF 1413 |
| Prior to |
| Any work on Government Property |
| 12 |
| Demolition and Work Plan |
| Prior to |
| Start of Construction |
| 13 |
| Design Development Docs (HVAC preliminary drawings of equipment and air distribution layout, structural cals and drawings, preliminary electrical single line drawings) |
| Prior to |
| Start of Construction |
| 14 |
| Final Design Docs (HVAC shop drawings of equipment and air distribution layout, structural shop drawings, electrical single line shop drawings) |
| Prior to |
| Start of Construction |
| 15 |
| Submittal Register |
| Prior to |
| Start of Construction |
| 16 |
| Performance/Payment Bonds |
| Within 15 days |
| After Award |
| 17 |
| Environmental Protection Plan |
| Prior to |
| Start of Construction |
| 18 |
| Certificates of Insurance |
| Prior to |
| Start of Construction |
| 19 |
| Door Details / Drawings |
| Prior to |
| Start of Construction |
| 20 |
| Manufacturer Material Cut Sheets and Specifications |
| Prior to |
| Start of Construction |
| 21 |
| eOMSI |
| Prior to |
| BOD |
| 22 |
| Operating and Maintenance Support Hazard Analysis |
| Prior to |
| Start of Construction |
File details come from the government source that posted it. Updated .