Exhibit M CIVIL JOC NAICS 237990 PTO 0001.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- N62473-20-R-0019
About this file
This document contains a pre-priced item worksheet for an Indefinite Delivery Indefinite Quantity (IDIQ), Job Order Contract (JOC) for other heavy and civil engineering construction projects at various government facilities within Naval Base Coronado, Naval Base Point Loma, Naval Base San Diego, and MCAS Miramar. The worksheet lists line items with quantities, units, material costs, labor costs, equipment costs, and other costs for various construction tasks such as topographical surveys, selective demolition, concrete work, erosion control, sidewalks, retaining walls, and an air pollution control district notification fee. Pricing is based on R.S. Means 2020 data and includes adjustments for city cost index, sales tax, and pre-priced coefficients. The total task order price will be calculated from the sum of pre-priced and non-pre-priced line items including adjustments. Modifications to the form are not permitted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit I Wage Determination San Diego 013120.pdf | ||
| Amendment #2 N62473-20-R-0019.pdf | ||
| Amendment #1 N62473-20-R-0019.pdf | ||
| Exhibit B - Experience - Offeror.docx | DOCX document | |
| Exhibit A - Offeror Team Composition and Management.docx | DOCX document | |
| N62473-20-R-0019.pdf | ||
| Exhibit F Surety Form.docx | DOCX document | |
| Exhibit J JOC IDIQ SAMPLE SUBMITTAL REGISTER.docx | DOCX document | |
| Exhibit E Financial Questionnaire.docx | DOCX document | |
| Exhibit I Wage Determination San Diego 120619.pdf | ||
| Exhibit C - PPQ.docx | DOCX document | |
| EXHIBIT K COEFFICIENT WORKSHEET with profit language 072418.docx | DOCX document | |
| Exhibit H GENERIC UFGS Guides for projects.docx | DOCX document | |
| Exhibit G Revised RFI Form.docx | DOCX document | |
| Exhibit D Safety Data.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| PRE-PRICED ITEM DESCRIPTION | MEANS ITEM # | QTY # | QTY UNIT | MATERIAL (MATL) UNIT COST | MATL TOTAL COST | LABOR UNIT COST | LABOR TOTAL COST | EQUIPMENT (EQUIP) UNIT COST | EQUIP TOTAL COST | OTHER COST | OTHER TOTAL COST |
| Topographical survey, conventional, maximum | 022113090100 | 1 | Acre | $ 63.00 | $ 63.00 | $ 2,975.00 | $ 2,975.00 | $ 51.00 | $ 51.00 | ||
| Selective demolition, rubbish handling, dumpster, 20 C.Y., 5 ton capacity, weekly rental, includes one dump per week, cost to be added to demolition cost | 024119190725 | 8 | Week | $ 565.00 | $ 4,520.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Selective demolition, dump charges, typical urban city, reclamation station, usual charge, includes tipping fees only | 024119200500 | 25 | Ton | $ 74.00 | $ 1,850.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Selective concrete demolition, reinforcing more than 2% cross-sectional area, break up into small pieces, excludes shoring, bracing, saw or torch cutting, loading, hauling, dumping | 030505100070 | 10 | C.Y. | $ - 0 | $ - 0 | $ 213.00 | $ 2,130.00 | $ 44.50 | $ 445.00 | ||
| Clearing & grubbing, cut & chip light trees, to 6" diameter | 311110100020 | 1 | Acre | $ - 0 | $ - 0 | $ 2,150.00 | $ 2,150.00 | $ 1,650.00 | $ 1,650.00 | ||
| Fine grading, machine grading, includes compaction, minimum labor/equipment charge | 312216109100 | 1 | Job | $ - 0 | $ - 0 | $ 395.00 | $ 395.00 | $ 530.00 | $ 530.00 | ||
| Excavating, trench or continuous footing, common earth, 3/4 C.Y. excavator, 6' to 10' deep, excludes sheeting or dewatering | 312316130500 | 70 | B.C.Y. | $ - 0 | $ - 0 | $ 3.60 | $ 252.00 | $ 3.09 | $ 216.30 | ||
| Cycle hauling(wait, load, travel, unload or dump & return) time per cycle, excavated or borrow, loose cubic yards, 30 min load/wait/unload, 12 C.Y. truck, cycle 30 miles, 50 MPH, excludes loading equipment | 312323201710 | 70 | L.C.Y. | $ - 0 | $ - 0 | $ 4.66 | $ 326.20 | $ 6.80 | $ 476.00 | ||
| Compaction, 4 passes, 6" lifts, riding, sheepsfoot or wobbly wheel roller | 312323235640 | 70 | E.C.Y. | $ - 0 | $ - 0 | $ 0.48 | $ 33.60 | $ 1.04 | $ 72.80 | ||
| Synthetic erosion control, revegetation mat, webbed | 312514160120 | 21 | S.Y. | $ 2.96 | $ 62.16 | $ 0.67 | $ 14.07 | $ - 0 | $ - 0 | ||
| Synthetic erosion control, silt fence, install and maintain, remove, 3' high | 312514161000 | 350 | L.F. | $ 0.45 | $ 157.50 | $ 0.84 | $ 294.00 | $ 0.14 | $ 49.00 | ||
| Rip-rap and rock lining, random, broken stone, 18" minimum thickness, machine placed for slope protection, not grouted | 313713100200 | 15 | S.Y. | $ 19.85 | $ 297.75 | $ 48.50 | $ 727.50 | $ 10.95 | $ 164.25 | ||
| Sidewalks, driveways, and patios, sidewalk, concrete, cast-in-place with 6 x 6 - W1.4 x W1.4 mesh, broomed finish, 3,000 psi, 6" thick, excludes base | 320610100400 | 120 | S.F. | $ 3.34 | $ 400.80 | $ 2.28 | $ 273.60 | $ - 0 | $ - 0 | ||
| Metal parking bumpers, pipe bollards, concrete filled/painted, 8' L x 4' D hole, 6" diam. | 321713131300 | 8 | Ea. | $ 635.00 | $ 5,080.00 | $ 55.00 | $ 440.00 | $ 10.70 | $ 85.60 | ||
| Gabion retaining walls, stone filled gabions, stone delivered, galvanized, 3' wide, 12' long, 3'-0" high, excludes excavation | 323236104990 | 6 | Ea. | $ 435.00 | $ 2,610.00 | $ 860.00 | $ 5,160.00 | $ 194.00 | $ 1,164.00 | ||
| $ 15,041.21 | $ 15,170.97 | $ 4,903.95 |
| NON PRE-PRICED ITEM DESCRIPTION | QTY # | QTY UNIT | MATERIAL (MATL) UNIT COST | MATL TOTAL COST | LABOR UNIT COST | LABOR TOTAL COST | EQUIPMENT (EQUIP) UNIT COST | EQUIP TOTAL COST | OTHER COST | OTHER TOTAL COST | |
| Air Pollution Control District (APCD) notification fee 501 SF to 2,000 SF | 1 | ea | $ 500.00 | $ 500.00 | |||||||
| PREPRICED LINE TOTALS (MATERIALS + LABOR + EQUIPMENT + OTHER) | $ 35,116.13 | ||||||||||
| CITY COST INDEX _109.0__ (SAN DIEGO, CA WEIGHTED AVERAGE)_ | $ 3,160.45 | ||||||||||
| SUBTOTAL (PREPRICED LINE TOTALS + CCI) | $ 38,276.58 | THE PROVIDED UNIT PRICING IS BASED ON R. S. MEANS 2020 BASE DATA. | |||||||||
| APPLICABLE SALES TAX ON MATERIALS AND EQUIPMENT _7.75%________ | $ 1,545.75 | DO NOT CHANGE THE UNIT PRICING. COMPLETE THE CALCULATIONS AND RETURN. | |||||||||
| SUBTOTAL (PREPRICED LINE ITEMS + CCI + SALES TAX) | $ 39,822.33 | ||||||||||
| PRE-PRICED COEFFICIENT _______ (FROM EXHIBIT K WORKSHEET) | |||||||||||
| TOTAL (PRE-PRICED LINE ITEMS + CCI + SALES TAX, LINE 26) + PRE-PRICED COEFFICIENT ADJUSTMENT (LINE 26 X LINE 27) |
| NON PRE-PRICED LINE TOTALS (MATERIALS + LABOR + EQUIPMENT + OTHER) | $ 500.00 |
| APPLICABLE SALES TAX ON MATERIALS AND EQUIPMENT _7.75%_________ | $ - 0 |
| SUBTOTAL | $ 500.00 |
| NON PRE-PRICED COEFFICIENT _____ (FROM EXHIBIT K WORKSHEET) | |
| TOTAL (NON PRE-PRICED LINE ITEMS + SALES TAX, LINE 32) + NON PRE-PRICED COEFFICIENT ADJUSTMENT (LINE 32 X LINE 33) |
| TOTAL TASK ORDER PRICE (LINE 28 + LINE 34) |
| NOTE: USE OF THIS FORM IS MANDATORY. ANY MODIFICATION OF THIS FORM BY THE OFFEROR WILL RESULT IN THE OFFER BEING REJECTED AS NON-RESPONSIVE. |
File details come from the government source that posted it. Updated .