About this file

This document contains a pre-priced item worksheet for an Indefinite Delivery Indefinite Quantity (IDIQ), Job Order Contract (JOC) for other heavy and civil engineering construction projects at various government facilities within Naval Base Coronado, Naval Base Point Loma, Naval Base San Diego, and MCAS Miramar. The worksheet lists line items with quantities, units, material costs, labor costs, equipment costs, and other costs for various construction tasks such as topographical surveys, selective demolition, concrete work, erosion control, sidewalks, retaining walls, and an air pollution control district notification fee. Pricing is based on R.S. Means 2020 data and includes adjustments for city cost index, sales tax, and pre-priced coefficients. The total task order price will be calculated from the sum of pre-priced and non-pre-priced line items including adjustments. Modifications to the form are not permitted.

View the file

Other files

File Type Posted
Exhibit I Wage Determination San Diego 013120.pdf PDF
Amendment #2 N62473-20-R-0019.pdf PDF
Amendment #1 N62473-20-R-0019.pdf PDF
Exhibit B - Experience - Offeror.docx DOCX document
Exhibit A - Offeror Team Composition and Management.docx DOCX document
N62473-20-R-0019.pdf PDF
Exhibit F Surety Form.docx DOCX document
Exhibit J JOC IDIQ SAMPLE SUBMITTAL REGISTER.docx DOCX document
Exhibit E Financial Questionnaire.docx DOCX document
Exhibit I Wage Determination San Diego 120619.pdf PDF
Exhibit C - PPQ.docx DOCX document
EXHIBIT K COEFFICIENT WORKSHEET with profit language 072418.docx DOCX document
Exhibit H GENERIC UFGS Guides for projects.docx DOCX document
Exhibit G Revised RFI Form.docx DOCX document
Exhibit D Safety Data.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

PRE-PRICED ITEM DESCRIPTIONMEANS ITEM #QTY #QTY UNITMATERIAL (MATL) UNIT COSTMATL TOTAL COSTLABOR UNIT COSTLABOR TOTAL COSTEQUIPMENT (EQUIP) UNIT COSTEQUIP TOTAL COSTOTHER COSTOTHER TOTAL COST
Topographical survey, conventional, maximum0221130901001Acre$ 63.00$ 63.00$ 2,975.00$ 2,975.00$ 51.00$ 51.00
Selective demolition, rubbish handling, dumpster, 20 C.Y., 5 ton capacity, weekly rental, includes one dump per week, cost to be added to demolition cost0241191907258Week$ 565.00$ 4,520.00$ - 0$ - 0$ - 0$ - 0
Selective demolition, dump charges, typical urban city, reclamation station, usual charge, includes tipping fees only02411920050025Ton$ 74.00$ 1,850.00$ - 0$ - 0$ - 0$ - 0
Selective concrete demolition, reinforcing more than 2% cross-sectional area, break up into small pieces, excludes shoring, bracing, saw or torch cutting, loading, hauling, dumping03050510007010C.Y.$ - 0$ - 0$ 213.00$ 2,130.00$ 44.50$ 445.00
Clearing & grubbing, cut & chip light trees, to 6" diameter3111101000201Acre$ - 0$ - 0$ 2,150.00$ 2,150.00$ 1,650.00$ 1,650.00
Fine grading, machine grading, includes compaction, minimum labor/equipment charge3122161091001Job$ - 0$ - 0$ 395.00$ 395.00$ 530.00$ 530.00
Excavating, trench or continuous footing, common earth, 3/4 C.Y. excavator, 6' to 10' deep, excludes sheeting or dewatering31231613050070B.C.Y.$ - 0$ - 0$ 3.60$ 252.00$ 3.09$ 216.30
Cycle hauling(wait, load, travel, unload or dump & return) time per cycle, excavated or borrow, loose cubic yards, 30 min load/wait/unload, 12 C.Y. truck, cycle 30 miles, 50 MPH, excludes loading equipment31232320171070L.C.Y.$ - 0$ - 0$ 4.66$ 326.20$ 6.80$ 476.00
Compaction, 4 passes, 6" lifts, riding, sheepsfoot or wobbly wheel roller31232323564070E.C.Y.$ - 0$ - 0$ 0.48$ 33.60$ 1.04$ 72.80
Synthetic erosion control, revegetation mat, webbed31251416012021S.Y.$ 2.96$ 62.16$ 0.67$ 14.07$ - 0$ - 0
Synthetic erosion control, silt fence, install and maintain, remove, 3' high312514161000350L.F.$ 0.45$ 157.50$ 0.84$ 294.00$ 0.14$ 49.00
Rip-rap and rock lining, random, broken stone, 18" minimum thickness, machine placed for slope protection, not grouted31371310020015S.Y.$ 19.85$ 297.75$ 48.50$ 727.50$ 10.95$ 164.25
Sidewalks, driveways, and patios, sidewalk, concrete, cast-in-place with 6 x 6 - W1.4 x W1.4 mesh, broomed finish, 3,000 psi, 6" thick, excludes base320610100400120S.F.$ 3.34$ 400.80$ 2.28$ 273.60$ - 0$ - 0
Metal parking bumpers, pipe bollards, concrete filled/painted, 8' L x 4' D hole, 6" diam.3217131313008Ea.$ 635.00$ 5,080.00$ 55.00$ 440.00$ 10.70$ 85.60
Gabion retaining walls, stone filled gabions, stone delivered, galvanized, 3' wide, 12' long, 3'-0" high, excludes excavation3232361049906Ea.$ 435.00$ 2,610.00$ 860.00$ 5,160.00$ 194.00$ 1,164.00
$ 15,041.21$ 15,170.97$ 4,903.95
NON PRE-PRICED ITEM DESCRIPTIONQTY #QTY UNITMATERIAL (MATL) UNIT COSTMATL TOTAL COSTLABOR UNIT COSTLABOR TOTAL COSTEQUIPMENT (EQUIP) UNIT COSTEQUIP TOTAL COSTOTHER COSTOTHER TOTAL COST
Air Pollution Control District (APCD) notification fee 501 SF to 2,000 SF1ea$ 500.00$ 500.00
PREPRICED LINE TOTALS (MATERIALS + LABOR + EQUIPMENT + OTHER)$ 35,116.13
CITY COST INDEX _109.0__ (SAN DIEGO, CA WEIGHTED AVERAGE)_$ 3,160.45
SUBTOTAL (PREPRICED LINE TOTALS + CCI)$ 38,276.58THE PROVIDED UNIT PRICING IS BASED ON R. S. MEANS 2020 BASE DATA.
APPLICABLE SALES TAX ON MATERIALS AND EQUIPMENT _7.75%________$ 1,545.75DO NOT CHANGE THE UNIT PRICING. COMPLETE THE CALCULATIONS AND RETURN.
SUBTOTAL (PREPRICED LINE ITEMS + CCI + SALES TAX)$ 39,822.33
PRE-PRICED COEFFICIENT _______ (FROM EXHIBIT K WORKSHEET)
TOTAL (PRE-PRICED LINE ITEMS + CCI + SALES TAX, LINE 26) + PRE-PRICED COEFFICIENT ADJUSTMENT (LINE 26 X LINE 27)
NON PRE-PRICED LINE TOTALS (MATERIALS + LABOR + EQUIPMENT + OTHER)$ 500.00
APPLICABLE SALES TAX ON MATERIALS AND EQUIPMENT _7.75%_________$ - 0
SUBTOTAL$ 500.00
NON PRE-PRICED COEFFICIENT _____ (FROM EXHIBIT K WORKSHEET)
TOTAL (NON PRE-PRICED LINE ITEMS + SALES TAX, LINE 32) + NON PRE-PRICED COEFFICIENT ADJUSTMENT (LINE 32 X LINE 33)
TOTAL TASK ORDER PRICE (LINE 28 + LINE 34)
NOTE: USE OF THIS FORM IS MANDATORY. ANY MODIFICATION OF THIS FORM BY THE OFFEROR WILL RESULT IN THE OFFER BEING REJECTED AS NON-RESPONSIVE.